| Location: | California |
|---|---|
| Posted: | Jun 4, 2025 |
| Due: | Jun 17, 2025 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: REBID: B617 INSTALL SOLAR AND BATTERY SYS (POM 23-035)
Addenda: 0
Release Date: 6/3/2025
Due Date: 6/17/2025
In general, the work consists of, but is not limited to, perform necessary engineering, design, installation, and testing, and commissioning of a 60 kW DC solar and 200 kWh battery system on B617, a 30 kW DC solar and 100 kWh battery system (Additive Alternate 1), and another 30 kW DC solar and 100 kWh battery system (Additive Alternate 2) on B624. Both B617 and B624 are part of the limited 4kV circuit that interconnects several buildings in the Presidio and the meter is located near the Franklin Street Gate (See aerial map in Part IV, Page 27).

With GovernmentContracts, you can:
...Project ID: 080-3025703-RE-A Title: Power Generation, Distribution Engineering & Commissioning... Power Generation, Distribution ...
Orange County
Bid Due: 7/03/2026
...civil and systems construction, installation, testing and commissioning of a Jennings Avenue New ...
Sonoma-Marin Area Rail Transit
Bid Due: 6/17/2026
..., commissioning, training, traffic control and all other necessary work including utility...
City of Desert Hot Springs
Bid Due: 6/25/2026
...and commissioning of AMI equipment, customer service coordination, restoration of disturbed surfaces... with ...
City of Rohnert Park
Bid Due: 6/25/2026