| Location: | California |
|---|---|
| Posted: | Jun 4, 2025 |
| Due: | Jun 17, 2025 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: REBID: B617 INSTALL SOLAR AND BATTERY SYS (POM 23-035)
Addenda: 0
Release Date: 6/3/2025
Due Date: 6/17/2025
In general, the work consists of, but is not limited to, perform necessary engineering, design, installation, and testing, and commissioning of a 60 kW DC solar and 200 kWh battery system on B617, a 30 kW DC solar and 100 kWh battery system (Additive Alternate 1), and another 30 kW DC solar and 100 kWh battery system (Additive Alternate 2) on B624. Both B617 and B624 are part of the limited 4kV circuit that interconnects several buildings in the Presidio and the meter is located near the Franklin Street Gate (See aerial map in Part IV, Page 27).

With GovernmentContracts, you can:
...Project ID: 2026-RFP-0189 Title: Design-Build Services for Solar and Energy Storage Installations... Design-Build ...
City of Pasadena
Bid Due: 9/30/2026
...power systems throughout the design, development, analysis, integration, testing, and qualification... lifecycle. Relevant ...
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 10/02/2026
...: San Diego , CA 92126 USA Description This project will provide designs, ...
DEPT OF DEFENSE
Bid Due: 10/14/2026
...approval of solar and, just recently, a suite of energy-efficiency permits, significantly improving...-effectiveness ...
City of Pinole
Bid Due: 9/21/2026