| Location: | California |
|---|---|
| Posted: | Jun 4, 2025 |
| Due: | Jun 17, 2025 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: REBID: B617 INSTALL SOLAR AND BATTERY SYS (POM 23-035)
Addenda: 0
Release Date: 6/3/2025
Due Date: 6/17/2025
In general, the work consists of, but is not limited to, perform necessary engineering, design, installation, and testing, and commissioning of a 60 kW DC solar and 200 kWh battery system on B617, a 30 kW DC solar and 100 kWh battery system (Additive Alternate 1), and another 30 kW DC solar and 100 kWh battery system (Additive Alternate 2) on B624. Both B617 and B624 are part of the limited 4kV circuit that interconnects several buildings in the Presidio and the meter is located near the Franklin Street Gate (See aerial map in Part IV, Page 27).

With GovernmentContracts, you can:
...(RFP) for the Solar or Hybrid system design and installation in the near ...
City of Pasadena
Bid Due: 6/08/2026
...) is inviting proposals for the design, engineering, permitting, procurement of materials, writing..., ...
City of Pasadena
Bid Due: 7/07/2026