| Location: | California |
|---|---|
| Posted: | Jun 4, 2025 |
| Due: | Jun 17, 2025 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: REBID: B617 INSTALL SOLAR AND BATTERY SYS (POM 23-035)
Addenda: 0
Release Date: 6/3/2025
Due Date: 6/17/2025
In general, the work consists of, but is not limited to, perform necessary engineering, design, installation, and testing, and commissioning of a 60 kW DC solar and 200 kWh battery system on B617, a 30 kW DC solar and 100 kWh battery system (Additive Alternate 1), and another 30 kW DC solar and 100 kWh battery system (Additive Alternate 2) on B624. Both B617 and B624 are part of the limited 4kV circuit that interconnects several buildings in the Presidio and the meter is located near the Franklin Street Gate (See aerial map in Part IV, Page 27).

With GovernmentContracts, you can:
...Basic Information Title Request for Qualifications for Solar, Wind, Battery Storage, Microgrids... - ...
State Government of California
Bid Due: 12/23/2026
..., and replace the existing fire alarm system, including associated demolition, plumbing, mechanical..., ...
Monterey County Office of Education
Bid Due: 11/20/2026
...power systems (EPS), solar arrays, batteries, power electronics and distribution, high-power and high... ...
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 11/13/2026
...Solar, Energy Storage, and Resilience Projects; System Impact Studies for Large Resource..., modernization, ...
City of Pasadena
Bid Due: 11/05/2026