Schoolmaster Lane Water Main Project
| Location: |
Massachusetts |
| Posted: |
Apr 23, 2026 |
| Due: |
May 14, 2026 |
| Agency: |
Commonwealth of Massachusetts |
| Type of Government: |
State & Local |
| Category: |
- Y - Construction of Structures and Facilities
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
BD-26-1986-DWWD1-DWWD1-128284 |
| Publication URL: |
To access bid details, please log in. |
|
Header Information
|
|
Bid Number:
|
BD-26-1986-DWWD1-DWWD1-128284
|
Description:
|
Schoolmaster Lane Water Main Project
|
Bid Opening Date:
|
05/14/2026 02:00:00 PM
|
|
Purchaser:
|
Blake Lukis
|
Organization:
|
Dedham Westwood Water District
|
|
Department:
|
DWWD4 - distribution
|
Location:
|
DWWD4 - distribution
|
|
Fiscal Year:
|
26
|
Type Code:
|
NS
|
Allow Electronic Quote:
|
No
|
|
Alternate Id:
|
|
Required Date:
|
04/22/2026
|
Available Date
:
|
04/23/2026 10:00:00 AM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
N/A
|
|
Bulletin Desc:
|
The work consists of installation of approximately 1,325 linear feet of 8-inch ductile iron pipe, on Schoolmaster Lane in Dedham. The project will run from 100 Schoolmaster Lane to Country Club Road connecting to existing water mains at each end. Work also includes an above grade pier supported culvert crossing including but not limited to 18-inch steel casing pipe, concrete piers, pre-insulated 8-inch ductile iron pipe, and other ancillary items.
|
|
|
Ship-to Address:
|
Matt Lanen
50 elm street
dedham, MA 02026
US
Email: mlanen@dwwd.org
Phone: (781) 329-7090
|
Bill-to Address:
|
accounts payable
50 elm street
dedham, MA 02026
US
Email: ecommane@dwwd.org
Phone: (781) 329-7090
|
Print Format:
|
Bid Print
|
File Attachments:
|
Advertisement for bid
|
Form Attachments:
|
|
|
Required Quote Attachments
|
|
|
Item # 1:
(
83-10
-
00
)
|
The work consists of installation of approximately 1,325 linear feet of 8-inch ductile iron pipe, on Schoolmaster Lane in Dedham. The project will run from 100 Schoolmaster Lane to Country Club Road connecting to existing water mains at each end. Work also includes an above grade pier supported culvert crossing including but not limited to 18-inch steel casing pipe, concrete piers, pre-insulated 8-inch ductile iron pipe, and other ancillary items. In addition to mainline pipe installation this work also includes construction of new water services, temporary trench paving, permanent trench repair with mill and overlay within Country Club Road, and other site restoration items.
|
|
U N S P S C Code:
|
83-10-00
Utilities
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Bid Number: 874482 Bid Title: Hop Brook Culvert Replacement Warren Wright Road Category... ...
Belchertown town
Bid Due: 6/04/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.