Schoolmaster Lane Water Main Project

Location: Massachusetts
Posted: Apr 23, 2026
Due: May 14, 2026
Agency: Commonwealth of Massachusetts
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: BD-26-1986-DWWD1-DWWD1-128284
Publication URL: To access bid details, please log in.
Header Information
Bid Number:
BD-26-1986-DWWD1-DWWD1-128284
Description:
Schoolmaster Lane Water Main Project
Bid Opening Date:
05/14/2026 02:00:00 PM
Purchaser:
Blake Lukis
Organization:
Dedham Westwood Water District
Department:
DWWD4 - distribution
Location:
DWWD4 - distribution
Fiscal Year:
26
Type Code:
NS
Allow Electronic Quote:

No
Alternate Id:

Required Date:
04/22/2026

Available Date
:
04/23/2026 10:00:00 AM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
N/A
Bulletin Desc:
The work consists of installation of approximately 1,325 linear feet of 8-inch ductile iron pipe, on Schoolmaster Lane in Dedham. The project will run from 100 Schoolmaster Lane to Country Club Road connecting to existing water mains at each end. Work also includes an above grade pier supported culvert crossing including but not limited to 18-inch steel casing pipe, concrete piers, pre-insulated 8-inch ductile iron pipe, and other ancillary items.
Ship-to Address:
Matt Lanen
50 elm street
dedham, MA 02026
US
Email: mlanen@dwwd.org
Phone: (781) 329-7090
Bill-to Address:
accounts payable
50 elm street
dedham, MA 02026
US
Email: ecommane@dwwd.org
Phone: (781) 329-7090
Print Format:
Bid Print

File Attachments:
Advertisement for bid

Form Attachments:
Required Quote Attachments
Item Information

Item # 1:

(

83-10

-
00

)



The work consists of installation of approximately 1,325 linear feet of 8-inch ductile iron pipe, on Schoolmaster Lane in Dedham. The project will run from 100 Schoolmaster Lane to Country Club Road connecting to existing water mains at each end. Work also includes an above grade pier supported culvert crossing including but not limited to 18-inch steel casing pipe, concrete piers, pre-insulated 8-inch ductile iron pipe, and other ancillary items. In addition to mainline pipe installation this work also includes construction of new water services, temporary trench paving, permanent trench repair with mill and overlay within Country Club Road, and other site restoration items.

U N S P S C Code:
83-10-00
Utilities

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid Number: 874482 Bid Title: Hop Brook Culvert Replacement Warren Wright Road Category... ...

Belchertown town

Bid Due: 6/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.