| Location: | Massachusetts |
|---|---|
| Posted: | Jul 23, 2025 |
| Due: | Aug 8, 2025 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
The work consists of two primary components.
The first is constructing the Assonet Pump Station, Cole River Pump Station, RK Pump Station, and Swansea Mall Pump Station; including precast concrete wet well, valve vault, meter vault, sewer force mains, gravity sewer, water service, electrical and control equipment, paving, fencing, site lighting, site grading and restoration, equipment start-up and pump station commissioning.
The second is, the installation of gravity sewer mains, manhole structures, force mains, air release valves and structures, force main cleanout structures, sewer laterals, directional drilling of force main, trench paving and site restoration, and all performance testing to construct the sewer collection system in the area generally described as the Route 6 Corridor and as shown on the plans.

With GovernmentContracts, you can:
..., construction, coordination, commissioning and other services as requested and outlined in the ...
The Massachusetts Port Authority (Massport)
Bid Due: 7/23/2026
...packages, as well as commissioning and installation to certify the equipment. Specific Specifications...
DEPT OF DEFENSE
Bid Due: 6/11/2026
...of the construction project, attendance at post-award and commissioning kick off construction project..., ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026