| Location: | Massachusetts |
|---|---|
| Posted: | Jul 23, 2025 |
| Due: | Aug 8, 2025 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
The work consists of two primary components.
The first is constructing the Assonet Pump Station, Cole River Pump Station, RK Pump Station, and Swansea Mall Pump Station; including precast concrete wet well, valve vault, meter vault, sewer force mains, gravity sewer, water service, electrical and control equipment, paving, fencing, site lighting, site grading and restoration, equipment start-up and pump station commissioning.
The second is, the installation of gravity sewer mains, manhole structures, force mains, air release valves and structures, force main cleanout structures, sewer laterals, directional drilling of force main, trench paving and site restoration, and all performance testing to construct the sewer collection system in the area generally described as the Route 6 Corridor and as shown on the plans.

With GovernmentContracts, you can:
...INVITATION TO BID MAIN STREET EASEMENT SEWER IMPROVEMENTS DEPARTMENT OF PUBLIC WORKS Sealed ...
Town of Weymouth
Bid Due: 10/15/2026
...Open Pre-Bid Date Filed Sub-bids 00011631 6/13/2024 FY25 Remedial Reconstruction of Sanitary Sewers..., ...
City of Cambridge
Bid Due: 6/27/2027
...and sealing of 398 pipe joints, the reinstatement of 9 sewer laterals, the ...
Wright-Pierce
Bid Due: 10/08/2026
...at the Office of the Water/Sewer Business Manager, 16C Perry Way, Newburyport, MA ...
City of Newburyport
Bid Due: 10/08/2026