| Location: | Texas |
|---|---|
| Posted: | Oct 30, 2025 |
| Due: | Nov 12, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-11 |
| Publication URL: | To access bid details, please log in. |
26-11
Posted
Susan Lamendola
(936) 788-8384
Susan.Lamendola@mctx.org
11/12/2025
2:00 PM
C1702
Emergency (Less than 14 days) or Procurement Under 25,000
10/30/2025
10/30/2025 2:05 am
92517-Civil Engineering;
92535-Environmental Engineering;
Consultant will perform a geomorphic analysis, Hydrologic & Hydraulic (H&H) analysis, and streambank stabilization design for a downstream portion of Stewarts Creek. The objective is to mitigate ongoing erosion, protect adjacent infrastructure and property, and improve long-term channel stability along approximately 1,000 linear feet (LF) of Stewarts Creek near the West Fork San Jacinto River (extents of stabilization design to be verified by the study). The Consultant will evaluate up to three (3) concept-level alternatives for erosion control and should include both structural and nature-based techniques for streambank stabilization. Based on recommendations from the Consultant, the County will select one (1) alternative to advance to design phase. The Consultant will then provide data collection, analysis, design, permitting, bid-phase, and construction-phase services for the recommended design solution(s).

With GovernmentContracts, you can:
...and preferred concept selection * Design development to approximately 60% * Cost estimating ...
Port of Harlingen
Bid Due: 9/23/2026
...Services * Alternative analysis and preferred concept selection * Design development to approximately ...
Port of Harlingen
Bid Due: 9/23/2026
...is no requirement to submit price proposals or design concepts during the initial ...
DEPT OF DEFENSE
Bid Due: 9/23/2026
...Follow SPECIAL NOTICE: 91st Cyber Operations Center Progressive-Design-Build OT Active Contract...-Design-Build OT The ...
DEPT OF DEFENSE
Bid Due: 10/02/2026