| Location: | Ohio |
|---|---|
| Posted: | Oct 16, 2026 |
| Due: | Oct 26, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W911WN26QA062 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The U.S. Army Corps of Engineers (USACE), Pittsburgh District has a project that involves the complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. The work is to be completed within 365 calendar days after written Notice to Proceed (NTP). Rough Estimate of this non-commercial construction project is between $150,000.00 and $350,000.00. The work includes rerouting existing vent and exhaust pipes through the masonry side wall, installing a new gutter system, and integrating a new, certified, non-penetrating Lightning Protection System. The North American Industrial Classification Code (NAICS) is 238160 - Roofing Contractors. The Small Business Size Standard is $19,000,000.00. Any resultant award will be for one (1) Firm-Fixed Price (FFP) Contract. The Request for Quote (RFQ) will be issued on, or about, 4 September 2026, via the Procurement Integrated Enterprise Environment (PIEE), which posts the opportunity to SAM.gov. The anticipated award date is 13 November 2026. Basis of Award is best value to the Government. Quotes will be evaluated in accordance with (IAW) RFO 12.203(a), price and past performance. The Government reserves the right to reject any quotes that are unrealistically low or exceed available funds for this requirement. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on View FFP Contract Changes Playbook Here.
| Aug 19, 2026 | [Presolicitation (Original)] Mosquito Lake Control Tower Roof Replacement |
| Sep 24, 2026 | [Solicitation (Original)] Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement |
| Oct 23, 2026 | [Solicitation (Updated)] Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement |

With GovernmentContracts, you can:
...20261007 Northeast Ohio Medical University Roof Replacement Rootstown/Portage SOL DOCs TBD TBD... for ...
Ohio Facility Construction Commission
Bid Due: 11/04/2026
...Roofs 26, 27, 35 & 37 Northeast Ohio Medical University Roof Replacement Rootstown/Portage ...
Ohio Facility Construction Commission
Bid Due: 11/04/2026
...Higher Education Harding Hospital - Roof 2 replacement D-B $858,000 N/A TBD Request ...
Ohio Facility Construction Commission
Bid Due: 11/16/2026
...DCS 2027 Roof Replacement at Wright Elementary Schools Bids are due at or ...
Dublin City Schools
Bid Due: 11/17/2026