D2 Interstate Culverts

Location: Montana
Posted: Nov 10, 2026
Due: Dec 9, 2026
Agency: State Government of Montana
Type of Government: State & Local
Category:
  • 56 - Construction and Building Materials
Solicitation No: D2
Publication URL: To access bid details, please log in.
Title Closes
D2 Interstate Culverts 12/09/2026

Attachment Preview

Larry Flynn, Director
2701 Prospect ▪ PO Box 201001
Helena MT 59620-1001
Date:
November 10, 2026
Subject:
Request for Proposals
D2 Interstate Culverts
IM 90-5(103)240
UPN 10695000
To Whom It May Concern:
The Montana Department of Transportation (MDT) is accepting proposals from consulting firms
interested in the preparation of the construction plans and specifications for the subject project.
One firm will be selected to perform the work specified herein.
Teams may be established as necessary; however, it is expected that the prime consultant will be
capable of completing the vast majority of the work, and the proposal must clearly identify the
prime for this contract. As a rule, the prime consultant must complete at least 50% of the work
for a specific project or assignment unless written exception is given.
Montana professional engineering licensure is required for this work and must be in-hand at the
time your proposal is submitted. If this requirement is not met and clearly identified in the
proposal, your proposal will be considered non-responsive.
If your firm is interested, please submit a proposal as described herein.
Consultant Design Bureau
Phone: (406) 444–6209
Fax: (406) 444–6253
An Equal Opportunity Employer
Engineering Division
TTY: (800) 335–7592
Web Page: www.mdt.mt.gov
SCOPE OF WORK
The scope of work for the project includes the analysis of three (3) separate existing culverts for
rehabilitation or replacement options, followed by the design necessary to complete the selected
alternatives. Design efforts may include but are not limited to; project management, alternatives
analysis, selection of preferred alternatives, engineering and cadastral survey, hydrology and
hydraulics, floodplain analysis and permitting, geotechnical, surfacing, right-of-way, utility
impacts and conflicts, environmental permitting and documentation, roadway, full PS&E
package, and construction model development. Preliminary analysis indicates that diversion
structures and crossovers should be anticipated at all locations.
The culverts are located at the following locations;
• Bison Creek– I-15 at RP 146.08 (MDT ID 1128): 144” SSPPC (Culvert ID 228931)
• Prickly Pear Creek – I-15 at RP 179.8 (MDT ID 1165): 180” SSPPC (Culvert ID 228926)
• Dry Creek – I-90 at RP 240.7 (MDT ID 1529): 96” SSPPC (Culvert ID 181689)
As-built plans will be made available to the successful respondent.
Culvert Asset Database, see above for Culvert ID #:
https://gis.mtmdt.us/portal/apps/mapviewer/index.html?layers=70f10e7f0f04436ca1fc73147625e
0ea
LOCATION
The proposed work is located at three (3) different locations all within Jefferson County; Bison
Creek at RP 146.08 on I-15, Prickly Pear Creek at RP 179.8 on I-15, and Dry Creek at RP 240.7
on I-90.
PROJECT SCHEDULE AND DELIVERABLES
The project schedule will be developed and negotiated prior to executing the contract agreement.
At this time, it is anticipated that deliverables will generally follow those described in MDT’s
Consultant Activity Descriptions (as applicable):
http://www.mdt.mt.gov/other/webdata/external/cdb/ACTIVITY_DESCRIPTIONS/CONSULTA
NT_DESIGN_2500_MU.PDF
STANDARDS, SPECIFICATIONS, AND POLICIES
Work is expected to follow MDT’s various Manuals, Guides, and Policies. These items may be
found on MDT’s Design Consulting web page at: http://www.mdt.mt.gov/business/consulting/.
PROPOSAL SUBMITTAL
Submit one (1) electronic version (Adobe© PDF format) of the proposal. Hard copy
proposals will not be accepted.
Submit the electronic version by uploading to the State of Montana File Transfer Service (FTS)
site, which can be accessed at this link: https://transfer.mt.gov. To upload to FTS, an account
must be created unless the person who is uploading already has an account. Uploading
instructions can be accessed at https://transfer.mt.gov/Home/Instructions. When your proposal
Page 2 of 7
has been uploaded, the FTS system will prompt you for an email address to send to. Please send
this email of your uploaded proposal to the following individuals:
Sheryl Tangen: stangen@mt.gov
Kelly Williams: kwilliams@mt.gov
J.R. Taylor: jertaylor@mt.gov
The Department must receive the proposals for this RFP no later than 3:00 PM MST,
December 9, 2026.
Regardless of cause, late proposals will not be accepted and will automatically be disqualified
from further consideration. It shall be solely the vendor's responsibility to assure delivery at the
specified office by the specified time. Offeror may request the State return late proposals at
vendor’s expense or the State will dispose of late proposals if requested by the offeror. (See
Administrative Rules of Montana (ARM) 2.5.509.). If no request is made, late proposals become
the property of the Department. All proposals submitted on time become the property of the
Department.
The costs for developing and delivering responses to this solicitation are entirely the
responsibility of the offeror. The State is not liable for any expense incurred by the offeror in the
preparation and presentation of this submittal.
TENTATIVE RFP/SELECTION SCHEDULE
The anticipated schedule for consultant solicitation and selection for this contract is as follows
(subject to change):
November 10, 2026: RFP released
December 9, 2026: Proposals due to be submitted to MDT Consultant Design
January 6, 2027: Consultant Selection Board meeting to select consultant
February 17, 2027: Scoping meeting with selected consultant
There are three (3) members on the evaluation committee for this RFP (subject to change):
1. MDT Butte District Project Design Engineer
2. MDT Hydraulics Design Engineer
3. MDT Hydraulics Civil Engineering Specialist
PROPOSAL CONTENTS
The proposal must contain the information listed in this section. The proposal is limited to five
(5) pages, not including the required Appendices. A single cover jacket/title page is allowed if
desired and will not count in the page limit. Each page is defined as one side of a letter size sheet
(no larger than 8 ½” x 11”), minimum font size of 10 (any information that is not font size 10 or
larger will not be evaluated or considered for scoring purposes, including tables, charts, etc.).
Evaluation of information will begin with the first page immediately following the cover
jacket/title page, and every page will be counted, in order, from that point forward, including any
table of contents or divider pages the firm wishes to include. Once the page limit is reached, any
information included thereafter will be removed and not considered or scored. Please organize
your proposal in the same order and numbering format as shown below, which will assist MDT
in reviewing your proposal:
Page 3 of 7
Questions
1) Team Qualifications
Provide a discussion on how the team you propose to use for this project (including
subconsultants, if used) is best qualified to respond to the requirements of this project.
Discussion should focus on the requirements for this specific project, particularly your
team’s expertise and experience, as it relates to the work described in the “Scope of
Work” section above. Provide examples of previous related project experience as it
relates to these services. Identify professional licensure of staff that satisfy the
requirements for this contract. Include an organizational chart of your team for this
project. Also briefly discuss your compatibility of systems, software, and equipment (i.e.
CADD software, word processing software, etc.), and experience with these systems,
software, and equipment. The Department’s standard design software is Autodesk®
technology included in the Architecture, Engineering & Construction (AEC) Collection.
Describe any special equipment or software you intend to use. Resumes may be
considered as supporting documentation to verify / supplement the qualifications
described in the proposal. However, scoring will be based solely on the narrative
response included in the Team Qualifications section of the proposal.
2) Project Approach
Transportation work has many challenging aspects, and the development and delivery of
a successful project that addresses and mitigates specific project challenges is of utmost
interest to MDT. Discuss the challenges you foresee as they relate to this project and its
requirements, your strategy for addressing these challenges, and your specific experience
in implementing the strategies identified. Describe your quality assurance/quality control
process. Include a discussion on your overall plan for delivering this project in a timely
manner.
Appendix A: Resumes
Include brief resumes for the key personnel to be assigned to the contract. Resumes are
limited to one (1) page per person.
Appendix B: Cover Page Form
Include a completed version of MDT’s standard cover page form, available at the following
location:
http://www.mdt.mt.gov/other/webdata/external/cdb/MDT-CDB-002-Proposal-SOQ-Cover-Sheet.pdf
Information presented in the cover page form will not be considered in proposal scoring.
Appendix C: References
Submit references that includes a minimum of five (5) separate contracts from the past
three (3) years. If applicable, you may submit multiple contracts for a single client. Each
contract must pertain to work similar to the proposed scope of services. Include client
name, a currently employed primary contact person, an alternative contact person,
corresponding valid phone numbers and emails for both contacts, a range of contract value,
and a brief description of the work performed. If MDT needs to use these references for the
Past Performance Score (as described in the “Evaluation of Proposals” section below) and
is unable to contact the required number of references after a reasonable effort, the firm
will receive a zero for the missing reference(s).
Page 4 of 7
EVALUATION OF PROPOSALS
All proposals will be evaluated in accordance with the following factors:
1) Team Qualifications (50 points possible)
2) Project Approach (100 points possible)
3) Record of past performance (30 points possible)
a) If two (2) or more MDT evaluations specific to the discipline for this contract are
available for the consultant, the average score of these evaluations will be used.
Evaluations for Project Management & Overall Performance will also be included.
b) If fewer than two (2) MDT evaluations specific to the discipline for this contract are
available for the consultant, but there are two (2) or more MDT evaluations are
available for other work disciplines, the consultant’s current overall past performance
score from MDT evaluations will be used.
c) If there is only one (1) MDT evaluation available for the consultant, the record of past
performance score will be an average of the MDT evaluation and one (1) reference
check from the references provided in the unbound attachment.
d) If no MDT evaluations are available, the average score of two (2) reference checks
from the references provided in the unbound attachment will be used for this score.
Regardless of partnership/teaming relationships, the past performance of the prime
consultant will be the past performance scored that will be used for this score.
All Proposals will be evaluated using the following basic scoring methodology:
o Outstanding/Exceptional response: 90-100% of the available points
o Good response: 70-90% of the available points
o Average response: 50-70% of the available points
o Poor response: 30-50% of the available points
o Qualifications not clearly met: 0-30% of the available points
Following the review, evaluation, and rating of all proposals, the final results will be presented to
the Consultant Selection Board (Board) at the MDT Headquarters Building. At this time, the
Board will select the most qualified firm(s) to perform the work. The Board may consider any
proposal scoring within 2% of the highest-scoring proposal as equally qualified and take into
account its knowledge of the firms’ workload, past performance, and familiarity with the project
area and local entities in selecting the most-qualified consultant. In the event that a firm cannot
be identified as the most qualified through an evaluation of these proposals, MDT reserves the
right to narrow down the list of responding firms to an appropriate short list. Short-listed firms
will either be asked to provide a supplemental proposal or asked to be interviewed or provide a
presentation. Scores from the proposals, supplement project proposals (if used), and interviews
(if used) will be carried forward to determine final consultant score. Consultant selection is
finalized by MDT at the Consultant Selection Board meeting.
INDIRECT COST RATE REQUIREMENTS
Proof of the firm’s Indirect Cost Rate (overhead rate) is not required with this proposal
submittal. However, an Indirect Cost Rate may be required prior to executing a contract
according to MDT’s Indirect Cost Rate Requirements:
Page 5 of 7
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Software to assist University of Montana researchers locate potential grant funding sources. Software

State Government of Montana

Bid Due: 11/16/2026

Bid Title: RIVERFRONT TRAIL RECONSTRUCTION Category: Construction Services Status: Open Description: CALL FOR

City of Billings

Bid Due: 12/01/2026

MSU Northern Janitorial Paper Products MSU Northern is seeking janitorial paper product supplier

State Government of Montana

Bid Due: 11/19/2026

Title Closes Yellowstone River - 4m S Livingston 12/09/2026 Larry Flynn, Director 2701

State Government of Montana

Bid Due: 12/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.