| Location: | California |
|---|---|
| Posted: | Jan 15, 2026 |
| Due: | Jan 16, 2026 |
| Agency: | HEALTH AND HUMAN SERVICES, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | IHS1521987 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
***Submission deadline extended through January 16, 2026, at 1:00 PM EST***
The Indian Health Service (IHS), Fort Yuma Health Center (FYHC), is soliciting quotations from qualified
Small Business vendors to provide comprehensive Water Management Plan (WMP) development,
maintenance, verification, and water testing services for existing mechanical and domestic water systems.
The contractor shall develop a new, facility-wide WMP during the base year and provide ongoing
maintenance and updates during option years. Services include quarterly and semi-annual verification site
visits, cooling tower sampling, and domestic water sampling for Legionella, heterotrophic plate count
(HPC), and E. coli. The period of performance includes a base year and four option years. The WMP shall
comply with ANSI/ASHRAE Standard 188-2021, CMS QSO 17-30, CDC guidance, CDPH AFL 18-39, the
USEPA Safe Drinking Water Act, and applicable Environment of Care standards. The contractor shall
perform system identification, hazard analysis, control measure planning, monitoring, corrective action
planning, and testing for cooling towers, domestic water systems, and associated mechanical equipment.
The contractor shall provide all labor, supervision, materials, tools, travel, equipment, and expertise
necessary to ensure FYHC water systems remain compliant, safe, and effectively managed throughout
the period of performance.
| Dec 15, 2025 | [Sources Sought (Original)] Sources Sought - FYSU Water Management Plan Development, Maintenance, Verification, and Legionella Testing Services |
| Jan 7, 2026 | [Solicitation (Original)] FYSU Water Mgt Plan Development, Maint, Verification, and Legionella Testing Services |

With GovernmentContracts, you can:
...Boiler and Cooling Towers Water Treatment Status Stage Open Posted 5/26/2026 Bid Due ...
City of Los Angeles
Bid Due: 6/18/2026
...Project: Golden Gate Suspension Bridge Seismic Retrofit Contract 1 North and South Towers... ...
Golden Gate Bridge, Highway and Transportation District
Bid Due: 6/09/2026
.../Network,Communication Towers/Antennas,Conduit/Electrical/Telemetry,Construction,Control Panels...,Electrical Installation/Construction,Mechanical Systems,Miscellaneous,Tower Radio/Radar Maint/Repair..., Electrical Equipment & Supplies, Communication Towers/Antennas, ...
El Dorado County
Bid Due: 6/26/2026
..., installation of floating dead-end suspension assemblies, tower structure raises, tower replacement..., intermediate ...
San Francisco Public Utilities Commission
Bid Due: 12/31/2099