Bid Solicitation: BD-25-1334-SWNHW-SWNHW-119153
|
|
Header Information
|
|
Bid Number:
|
BD-25-1334-SWNHW-SWNHW-119153
|
Description:
|
SEWER COLLECTION SYSTEM
|
Bid Opening Date:
|
08/21/2025 10:00:00 AM
|
|
Purchaser:
|
Melissa Heilborn
|
Organization:
|
Town of Swansea
|
|
Department:
|
SWNHW - Swansea Highway Department
|
Location:
|
SWNHW - Swansea Highway Department
|
|
Fiscal Year:
|
25
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
07/22/2025
|
Available Date
:
|
07/23/2025 12:00:00 AM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
ROUTE 6 CORRIDOR SEWER COLLECTION SYSTEM CWSRF 16705 Thursday, August 21, 2025, at 10:00 AM local time. Information is ONLY available at website: www.wright-pierce.com/projects
|
|
Bulletin Desc:
|
The first is constructing the Assonet Pump Station, Cole River Pump Station, RK Pump Station, and Swansea Mall Pump Station; including precast concrete wet well, valve vault, meter vault, sewer force mains, gravity sewer, water service, electrical and control equipment, paving, fencing, site lighting, site grading and restoration, equipment start-up and pump station commissioning. The second is, the installation of gravity sewer mains, manhole structures, force mains, air release valves.
|
|
|
Ship-to Address:
|
Melissa Heilborn
81 Main Street
Swansea, MA 02777
US
Email: mheilborn@swanseama.gov
Phone: (508) 678-2981 Ext. 5
|
Bill-to Address:
|
Melissa Heilborn
81 Main Street
Swansea, MA 02777
US
Email: mheilborn@swanseama.gov
Phone: (508) 678-2981 Ext. 5
|
Print Format:
|
Bid Print
|
|
Required Quote Attachments
|
|
|
|
Item # 1:
(
72-13
-
17
)
|
The first is constructing the Assonet Pump Station, Cole River Pump Station, RK Pump Station, and Swansea Mall Pump Station; including precast concrete wet well, valve vault, meter vault, sewer force mains, gravity sewer, water service, electrical and control equipment, paving, fencing, site lighting, site grading and restoration, equipment start-up and pump station commissioning.
The second is, the installation of gravity sewer mains, manhole structures, force mains, air release valves and structures, force main cleanout structures, sewer laterals, directional drilling of force main, trench paving and site restoration, and all performance testing to construct the sewer collection system in the area generally described as the Route 6 Corridor and as shown on the plans.
The work of this project shall be substantially complete within 540 calendar days and ready for final completion within 600 calendar days from the date of award.
|
|
U N S P S C Code:
|
72-13-17
Infrastructure construction
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|