VILLAGE OF PARK FOREST
350 VICTORY DRIVE
PARK FOREST, IL 60466
ITEM
NO.
DESCRIPTION
1 MOBILIZATION
2 CONSTRUCTION LAYOUT
3 TRAFFIC CONTROL AND PROTECTION
4 TEMPORARY ACCESS (PRIVATE ENTRANCE)
5 TEMPORARY ACCESS (ROAD)
6 DUST CONTROL WATERING
7 SUPPLEMENTAL WATERING
8 INLET FILTERS
9 TREE REMOVAL (6 TO 15 UNITS DIAMETER)
10 TREE REMOVAL (OVER 15 UNITS DIAMETER)
11 REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL
12 NON-SPECIAL WASTE DISPOSAL
13 SOIL DISPOSAL ANALYSIS
14 REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN
15 REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT
16 REGULATED SUBSTANCES MONITORING
17 EARTH EXCAVATION
18 PAVEMENT REMOVAL
19 DRIVEWAY PAVEMENT REMOVAL
20 REMOVE BRICK PAVERS
21 SIDEWALK REMOVAL
22 COMBINATION CURB AND GUTTER REMOVAL
23 GEOTECHICAL FABRIC FOR GROUND STABILIZATION
24 AGGREGATE SUBGRADE IMPROVEMENT
25 PREPARATION OF BASE
26 AGGREGATE OF BASE REPAIR
27 AGGREGATE BASE COURSE, TYPE B 4"
28 BITUMINOUS MATERIALS (TACK COAT)
29 LONGITUDINAL JOINT SEALANT
30 HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50
31 HOT-MX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50
32 PROTECTIVE COAT
33 HOT-MIX DRIVEWAY PAVEMENT, 3-INCH
34 PORTLAND CMENET CONCRETE DRIVEWAY PAVEMENT, 6-INCH
PROJECT: TALALA STREET RECONSTRUCTION
Engineers Estimate
ENGINEER'S
ESTIMATED
QUANTITY
UNIT
PRICE
EXTENDED
AMOUNT
1.00 LSUM $95,000.00
1.00 LSUM $35,000.00
1.00 LSUM $35,000.00
66.00 EACH
$100.00
8.00 EACH
$250.00
4.00 UNIT
$1,000.00
64.00 UNIT
$50.00
41.00 EACH
$250.00
146.00 UNIT
$100.00
348.00 UNIT
$110.00
499.00 C.Y.
$75.00
81.00 C.Y.
$150.00
2.00 EACH $1,500.00
1.00 LSUM $5,000.00
1.00 LSUM $5,000.00
10.00 CAL DA $1,000.00
496.00 C.Y.
$50.00
9,493.00 S.Y.
$5.00
689.00 S.Y.
$20.00
30.00 S.F.
$40.00
17,800.00 S.F.
6,456.00 FOOT
1,726.00 S.Y.
580.00 C.Y.
8,630.00 S.Y.
951.00 TON
4,161.00 S.Y.
3,900.00 POUND
3,329.00 FOOT
1,209.00 TON
967.00 TON
3,757.00 S.Y.
47.00 S.Y.
642.00 S.Y.
$4.00
$10.00
$3.00
$30.00
$2.00
$35.00
$15.00
$0.50
$4.00
$85.00
$95.00
$1.00
$40.00
$100.00
$95,000.00
$35,000.00
$35,000.00
$6,600.00
$2,000.00
$4,000.00
$3,200.00
$10,250.00
$14,600.00
$38,280.00
$37,425.00
$12,150.00
$3,000.00
$5,000.00
$5,000.00
$10,000.00
$24,800.00
$47,465.00
$13,780.00
$1,200.00
$71,200.00
$64,560.00
$5,178.00
$17,400.00
$17,260.00
$33,285.00
$62,415.00
$1,950.00
$13,316.00
$102,765.00
$91,865.00
$3,757.00
$1,880.00
$64,200.00
TABULATION OF BIDS
Iroquois Paving
1889 E. US Highway 24
Watseka, Il 60970
M/J Underground
26603 S. Governors Hwy
Monee, Il 60449
UNIT
PRICE
EXTENDED
AMOUNT
UNIT
PRICE
EXTENDED
AMOUNT
$90,000.00
$25,000.00
$25,000.00
$63.35
$0.01
$0.01
$82.50
$262.00
$46.35
$56.50
$0.01
$175.00
$1,500.00
$2,485.00
$2,485.00
$1,490.00
$0.01
$0.01
$24.75
$13.00
$3.50
$10.40
$0.01
$0.01
$4.25
$0.01
$15.40
$0.01
$4.60
$84.00
$85.00
$0.01
$109.00
$78.75
$90,000.00
$25,000.00
$25,000.00
$4,181.10
$0.08
$0.04
$5,280.00
$10,742.00
$6,767.10
$19,662.00
$4.99
$14,175.00
$3,000.00
$2,485.00
$2,485.00
$14,900.00
$4.96
$94.93
$17,052.75
$390.00
$62,300.00
$67,142.40
$17.26
$5.80
$36,677.50
$9.51
$64,079.40
$39.00
$15,313.40
$101,556.00
$82,195.00
$37.57
$5,123.00
$50,557.50
$22,992.00
$20,896.00
$11,363.00
$233.00
$218.00
$800.00
$58.00
$253.00
$42.00
$79.00
$127.00
$122.00
$1,659.00
$1,995.00
$2,415.00
$998.00
$77.00
$5.00
$19.00
$55.00
$3.00
$12.00
$3.00
$0.01
$3.00
$0.01
$9.00
$0.01
$5.00
$84.00
$88.00
$2.00
$83.00
$99.00
$22,992.00
$20,896.00
$11,363.00
$15,378.00
$1,744.00
$3,200.00
$3,712.00
$10,373.00
$6,132.00
$27,492.00
$63,373.00
$9,882.00
$3,318.00
$1,995.00
$2,415.00
$9,980.00
$38,192.00
$47,465.00
$13,091.00
$1,650.00
$53,400.00
$77,472.00
$5,178.00
$5.80
$25,890.00
$9.51
$37,449.00
$39.00
$16,645.00
$101,556.00
$85,096.00
$7,514.00
$3,901.00
$63,558.00
Gallagher Asphalt
18100 South Indiana Ave
Thorton, Il 60476
UNIT
PRICE
EXTENDED
AMOUNT
$78,000.00
$30,000.00
$46,000.00
$0.01
$0.01
$0.01
$21.00
$180.00
$31.00
$42.00
$30.00
$100.00
$1,580.00
$2,300.00
$1,900.00
$950.00
$0.01
$3.00
$28.00
$9.60
$3.10
$12.00
$1.00
$30.00
$1.00
$18.00
$0.01
$0.01
$4.65
$89.00
$99.00
$0.01
$75.00
$92.00
$78,000.00
$30,000.00
$46,000.00
$0.66
$0.08
$0.04
$1,344.00
$7,380.00
$4,526.00
$14,616.00
$14,970.00
$8,100.00
$3,160.00
$2,300.00
$1,900.00
$9,500.00
$4.96
$28,479.00
$19,292.00
$288.00
$55,180.00
$77,472.00
$1,726.00
$17,400.00
$8,630.00
$17,118.00
$41.61
$39.00
$15,479.85
$107,601.00
$95,733.00
$37.57
$3,525.00
$59,064.00
"D" Construction
1488 S. Broadway
Coal City, Il 60416
UNIT
PRICE
EXTENDED
AMOUNT
$25,000.00
$15,000.00
$10,000.00
$11.00
$500.00
$0.01
$220.00
$275.00
$33.00
$42.90
$30.00
$100.00
$1,500.00
$2,500.00
$2,500.00
$800.00
$55.00
$4.40
$19.80
$11.00
$1.65
$11.00
$5.00
$45.00
$2.00
$25.00
$3.96
$0.01
$6.00
$75.50
$77.65
$1.10
$40.00
$88.00
$25,000.00
$15,000.00
$10,000.00
$726.00
$4,000.00
$0.04
$14,080.00
$11,275.00
$4,818.00
$14,929.20
$14,970.00
$8,100.00
$3,000.00
$2,500.00
$2,500.00
$8,000.00
$27,280.00
$41,769.20
$13,642.20
$330.00
$29,370.00
$71,016.00
$8,630.00
$26,100.00
$17,260.00
$23,775.00
$16,477.56
$39.00
$19,974.00
$91,279.50
$75,087.55
$4,132.70
$1,880.00
$56,496.00
J & J Newell
25350 S. State St.
Crete Il 60417
PROJECT NUMBER: 26-0117-07
DATE: MARCH 4, 2026
Davis Concrete
11244 Monee-Manhattan Rd
Monee, Il 60449
UNIT
PRICE
EXTENDED
AMOUNT
UNIT
PRICE
EXTENDED
AMOUNT
$42,000.00
$40,720.00
$10,821.00
$10.00
$20.00
$0.01
$100.00
$150.00
$30.00
$39.00
$30.00
$150.00
$1,300.00
$3,900.00
$500.00
$750.00
$50.00
$4.40
$18.00
$10.00
$2.00
$10.00
$5.00
$45.00
$2.00
$25.00
$3.00
$0.01
$6.00
$75.50
$77.65
$1.00
$77.00
$80.00
$42,000.00
$40,720.00
$10,821.00
$660.00
$160.00
$0.04
$6,400.00
$6,150.00
$4,380.00
$13,572.00
$14,970.00
$12,150.00
$2,600.00
$3,900.00
$500.00
$7,500.00
$24,800.00
$41,769.20
$12,402.00
$300.00
$35,600.00
$64,560.00
$8,630.00
$26,100.00
$17,260.00
$23,775.00
$12,483.00
$39.00
$19,974.00
$91,279.50
$75,087.55
$3,757.00
$3,619.00
$51,360.00
$20,000.00
$15,820.00
$112,180.00
$25.00
$50.00
$10.00
$20.00
$10.00
$29.00
$39.00
$20.00
$50.00
$1,310.00
$4,300.00
$4,700.00
$100.00
$20.00
$4.25
$15.00
$5.00
$2.45
$7.25
$1.00
$25.00
$3.00
$0.01
$1.60
$0.01
$4.35
$80.00
$83.00
$0.01
$79.00
$88.00
$20,000.00
$15,820.00
$112,180.00
$1,650.00
$400.00
$40.00
$1,280.00
$410.00
$4,234.00
$13,572.00
$9,980.00
$4,050.00
$2,620.00
$4,300.00
$4,700.00
$1,000.00
$9,920.00
$40,345.25
$10,335.00
$150.00
$43,610.00
$46,806.00
$1,726.00
$14,500.00
$25,890.00
$9.51
$6,657.60
$39.00
$14,481.15
$96,720.00
$80,261.00
$37.57
$3,713.00
$56,496.00
VILLAGE OF PARK FOREST
350 VICTORY DRIVE
PARK FOREST, IL 60466
35 PORTLAND CEMENT CONCRETE SIDEWALK 5-INCH
36 PORTLAND CEMENT CONCRETE SIDEWALK 6-INCH
37 DETECTABLE WARNINGS
38 COMBINATION CONCRETE CURB AND GUTTER, TYPE M-4. 12
39 STORM SEWER REMOVAL 8"
40 STORM SEWER REMOVAL 10"
41 REMOVING MANHOLES
42 REMOVING INLETS
43 TRENCH BACKFILL
44 EXPLORATION TRENCH, SPECIAL
45 STORM SEWERS, CLASS A, TYPE 2 12"
46 STORM SEWERS, TYPE 2, WATER MAIN QUALITY PIPE, 12"
47 PIPE UNDERDRAINS FOR STRUCTURES 4"
48 MANHOLES, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, CLOSED LID
49 MANHOLES, TYPE A, 6'-DIAMETER, TYPE 1 FRAME, CLOSED LID
50 MANHOLES, TYPE A, 7'-DIAMETER,TYPE 1 FRAME, CLOSED LID
51 INLETS, TYPE A, TYPE 11 FRAME AND GRATE
52 VALVE BOXES TO BE ADJUSTED
53 FRAMES AND LIDS TO BE ADJUSTED (SPECIAL)
54 DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED
55 DRAINAGE & UTILITY STRUCTURES TO BE RECONSTRUCTED
56 EXTERNAL CHIMENY SEAL REPLACEMENT
57 THERMOPLASTIC PAVEMENT MARKING - LINE 6"
58 THERMOPLASTIC PAVEMENT MARKING - LINE 12"
59 THERMOPLASTIC PAVEMENT MARKING - LINE 24"
60 PARKWAY RESTORATION - SEED
Alt 1 PARKWAY RESTORATION - SOD
PROJECT: TALALA STREET RECONSTRUCTION
Engineers Estimate
15,687.00 S.F.
$9.00
2,113.00 S.F.
$10.00
235.00 S.F.
$35.00
6,456.00 FOOT
$30.00
399.00 FOOT
$20.00
102.00 FOOT
$20.00
7.00 EACH $1,250.00
18.00 EACH
$500.00
250.00 C.Y.
$75.00
125.00 FOOT
$50.00
176.00 FOOT
$120.00
205.00 FOOT
$180.00
300.00 FOOT
$30.00
4.00 EACH $5,000.00
3.00 EACH $12,000.00
2.00 EACH $18,000.00
18.00 EACH $2,500.00
7.00 EACH
$400.00
3.00 EACH
$800.00
13.00 EACH
$550.00
1.00 EACH $2,500.00
12.00 EACH
$500.00
476.00 FOOT
$4.00
162.00 FOOT
$8.00
76.00 FOOT
$10.00
4,172.00 S.Y.
$12.00
$141,183.00
$21,130.00
$8,225.00
$193,680.00
$7,980.00
$2,040.00
$8,750.00
$9,000.00
$18,750.00
$6,250.00
$21,120.00
$36,900.00
$9,000.00
$20,000.00
$36,000.00
$36,000.00
$45,000.00
$2,800.00
$2,400.00
$7,150.00
$2,500.00
$6,000.00
$1,904.00
$1,296.00
$760.00
$50,064.00
Total
$1,650,663.00
TABULATION OF BIDS
Iroquois Paving
1889 E. US Highway 24
Watseka, Il 60970
$7.25
$113,730.75
$9.00
$19,017.00
$36.50
$8,577.50
$35.00
$225,960.00
$57.00
$22,743.00
$46.50
$4,743.00
$1,217.00
$8,519.00
$622.00
$11,196.00
$92.00
$23,000.00
$47.60
$5,950.00
$90.00
$15,840.00
$120.00
$24,600.00
$30.00
$9,000.00
$5,600.00
$22,400.00
$15,775.00
$47,325.00
$23,975.00
$47,950.00
$1,885.00
$33,930.00
$260.00
$1,820.00
$2,200.00
$6,600.00
$260.00
$3,380.00
$2,630.00
$2,630.00
$840.00
$10,080.00
$2.85
$1,356.60
$5.70
$923.40
$11.40
$866.40
$10.00
$41,720.00
M/J Underground
26603 S. Governors Hwy
Monee, Il 60449
$9.00
$141,183.00
$9.00
$19,017.00
$25.00
$5,875.00
$29.00
$187,224.00
$56.00
$22,344.00
$46.00
$4,692.00
$1,217.00
$8,519.00
$622.00
$11,196.00
$89.00
$22,250.00
$47.00
$5,875.00
$84.00
$14,784.00
$111.00
$22,755.00
$29.00
$8,700.00
$5,154.00
$20,616.00
$14,265.00
$42,795.00
$21,557.00
$43,114.00
$1,708.00
$30,744.00
$251.00
$1,757.00
$2,202.00
$6,606.00
$602.00
$7,826.00
$2,605.00
$2,605.00
$829.00
$9,948.00
$5.00
$2,380.00
$10.00
$1,620.00
$21.00
$1,596.00
$8.00
$33,376.00
Total
$1,440,135.94
Total
$1,471,753.31
Gallagher Asphalt
18100 South Indiana Ave
Thorton, Il 60476
$7.50
$117,652.50
$9.50
$20,073.50
$20.00
$4,700.00
$28.00
$180,768.00
$10.90
$4,349.10
$10.90
$1,111.80
$355.00
$2,485.00
$110.00
$1,980.00
$25.00
$6,250.00
$50.00
$6,250.00
$158.00
$27,808.00
$169.00
$34,645.00
$45.00
$13,500.00
$7,500.00
$30,000.00
$8,000.00
$24,000.00
$10,000.00
$20,000.00
$3,100.00
$55,800.00
$380.00
$2,660.00
$1,360.00
$4,080.00
$490.00
$6,370.00
$1,400.00
$1,400.00
$570.00
$6,840.00
$3.00
$1,428.00
$6.00
$972.00
$12.00
$912.00
$0.01
$41.72
Total
$1,304,984.39
"D" Construction
1488 S. Broadway
Coal City, Il 60416
$9.90
$155,301.30
$11.00
$23,243.00
$27.23
$6,399.05
$31.90
$205,946.40
$20.00
$7,980.00
$20.00
$2,040.00
$1,500.00
$10,500.00
$1,000.00
$18,000.00
$50.00
$12,500.00
$0.01
$1.25
$139.00
$24,464.00
$213.00
$43,665.00
$30.00
$9,000.00
$4,050.00
$16,200.00
$10,580.00
$31,740.00
$17,590.00
$35,180.00
$2,540.00
$45,720.00
$300.00
$2,100.00
$900.00
$2,700.00
$900.00
$11,700.00
$1,500.00
$1,500.00
$600.00
$7,200.00
$3.03
$1,442.28
$6.05
$980.10
$12.10
$919.60
$11.00
$45,892.00
J & J Newell
25350 S. State St.
Crete Il 60417
$9.00
$141,183.00
$10.00
$21,130.00
$25.00
$5,875.00
$29.00
$187,224.00
$20.00
$7,980.00
$20.00
$2,040.00
$1,500.00
$10,500.00
$1,000.00
$18,000.00
$50.00
$12,500.00
$0.01
$1.25
$139.00
$24,464.00
$213.00
$43,665.00
$30.00
$9,000.00
$4,050.00
$16,200.00
$10,580.00
$31,740.00
$17,590.00
$35,180.00
$2,540.00
$45,720.00
$300.00
$2,100.00
$900.00
$2,700.00
$425.00
$5,525.00
$1,200.00
$1,200.00
$600.00
$7,200.00
$2.60
$1,237.60
$5.20
*Above Error
$10.50
$842.40
$798.00
$6.50
$27,118.00
PROJECT NUMBER: 26-0117-07
DATE: MARCH 4, 2026
Davis Concrete
11244 Monee-Manhattan Rd
Monee, Il 60449
$8.05
$126,280.35
$8.55
$18,066.15
$24.00
$5,640.00
$27.45
$177,217.20
$10.00
$3,990.00
$10.00
$1,020.00
$325.00
$2,275.00
$100.00
$1,800.00
$23.00
$5,750.00
$10.00
$1,250.00
$145.00
$25,520.00
$155.00
$31,775.00
$42.00
$12,600.00
$6,995.00
$27,980.00
$16,880.00
$50,640.00
$23,850.00
$47,700.00
$2,850.00
$51,300.00
$350.00
$2,450.00
$1,250.00
$3,750.00
$450.00
$5,850.00
$1,285.00
$1,285.00
$525.00
$6,300.00
$5.50
$2,618.00
$9.50
$1,539.00
$17.00
$1,292.00
$9.75
$40,677.00
Total
$1,385,750.93
Total
$1,340,401.54
Total
$1,304,497.78
As Read
$1,348,253.54
4,172.00 S.Y.
$20.00
$83,440.00
$17.00
$70,924.00
$20.00
$83,440.00
$18.00
$75,096.00
$22.00
$91,784.00
$18.50
$77,182.00
$18.00
$75,096.00