Sewershed E Wastewater Flow Monitoring Project
| Location: |
Massachusetts |
| Posted: |
Jul 23, 2025 |
| Due: |
Aug 20, 2025 |
| Agency: |
Commonwealth of Massachusetts |
| Type of Government: |
State & Local |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
BD-26-1712-ELDPW-ELDPW-119055 |
| Publication URL: |
To access bid details, please log in. |
Bid Solicitation: BD-26-1712-ELDPW-ELDPW-119055
|
|
Header Information
|
|
Bid Number:
|
BD-26-1712-ELDPW-ELDPW-119055
|
Description:
|
Sewershed E Wastewater Flow Monitoring Project
|
Bid Opening Date:
|
08/20/2025 11:00:00 AM
|
|
Purchaser:
|
Robert Taddia
|
Organization:
|
Town of East Longmeadow
|
|
Department:
|
ELDPW421 - Department of Public Works
|
Location:
|
ELDPW - Dept of Public Works
|
|
Fiscal Year:
|
26
|
Type Code:
|
NS
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
07/23/2025 08:00:00 AM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
Yes
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
|
|
Bulletin Desc:
|
The work consists of installing a flow metering device over an existing 6-inch Parshall flume in an existing precast concrete vault, electrical/power conduits and wire, a SCADA control panel and antennae, and a utility pole. The work also includes replacing the vault access hatch. Although the work is for the Town of East Longmeadow the work is actually located at the east end of Oak Hollow Road in Springfield, Massachusetts. Bids shall be on a lump sum basis.
|
|
|
Ship-to Address:
|
DPW - Bruce Fenney
60 Center Square
DPW
East Longmeadow, MA 01028
US
Email: bruce.fenney@eastlongmeadowma.gov
Phone: (413) 525-5400 Ext. 1201
|
Bill-to Address:
|
DPW - Bruce Fenney
60 Center Square
DPW
East Longmeadow, MA 01028
US
Email: bruce.fenney@eastlongmeadowma.gov
Phone: (413) 525-5400 Ext. 1201
|
Print Format:
|
Bid Print
|
|
Required Quote Attachments
|
|
|
|
Item # 1:
(
83-10
-
15
)
|
Sewershed E Wastewater Flow Monitoring Project
|
|
U N S P S C Code:
|
83-10-15
Water and sewer utilities
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...displays, new AV equipment such as speakers, microphones, touch controls, control panel removal... ...
Massachusetts Convention Center Authority
Bid Due: 6/29/2026
...displays, new AV equipment such as speakers, microphones, touch controls, control panel removal... ...
Massachusetts Convention Center Authority
Bid Due: 6/29/2026
...control panel, removal and replacement of two variable frequency drives, two new sine ...
Wright-Pierce
Bid Due: 6/23/2026
..., new AV equipment such as speakers, microphones, touch controls, control panel removal, ...
Commonwealth of Massachusetts
Bid Due: 6/29/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.