| Location: | North Carolina |
|---|---|
| Posted: | May 20, 2026 |
| Due: | Jun 16, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY27-ITBCON-05 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Bonlyn Storm Drainage Improvement Project consists of the removal and replacement of approximately 720 LF of existing CMP/RCP. A secondary drainage system consisting of 840 LF of RCP shall be installed, primarily located on the Brookridge Apartment complex. The estimated cost of the project is $2,509,660.

With GovernmentContracts, you can:
...DD00529 BP4.R045.3 POC GRADING, PAVING, DRAINAGE AND STRUCTURE 970023_970023014....tif_08011940_plans.pdf Doc. Type: Letting Support ...
Division of Highways
Bid Due: 9/08/2026
...DD00529 BP4.R045.3 POC GRADING, PAVING, DRAINAGE AND STRUCTURE BR0150_Final Plans- Signed.pdf Doc.... Type: ...
Division of Highways
Bid Due: 9/08/2026
...ITB - Sessoms Street Drainage Improvements Reference number: COF1517023 Closing date October 01..., ...
City of Fayetteville
Bid Due: 10/01/2026
...DD00529 BP4.R045.3 POC GRADING, PAVING, DRAINAGE AND STRUCTURE 970023_970023014....tif_08011940_plans.pdf Doc. Type: Letting Support ...
Division of Highways
Bid Due: 9/08/2026