| Location: | South Carolina |
|---|---|
| Posted: | Jun 3, 2025 |
| Due: | Jul 7, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025-06-4290 |
| Publication URL: | To access bid details, please log in. |
The work to be done consists of furnishing all material, equipment and labor necessary to structurally rehabilitate approximately 23,714 linear feet of 8-inch vitrified clay pipe, and reline 24 brick manholes. The project includes pipe cleaning, CCTV pipe inspections, temporary bypass pumping, temporary traffic control and associated work in accordance with the Specifications and Standard General Conditions of the Construction Contract Documents.

With GovernmentContracts, you can:
...Project Name: Chester County Natural Gas Authority: Dawson Drive Pipeline Replacement Project...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/15/2026
...) low water crossings over an existing 24-inch diameter effluent pipeline....
Beaufort - Jasper Water & Sewer Authority
Bid Due: 6/23/2026
...of three (3) low water crossings over an existing 24-inch diameter effluent pipeline. ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/23/2026