| Location: | Washington |
|---|---|
| Posted: | Apr 14, 2025 |
| Due: | May 21, 2025 |
| Agency: | State Government of Washington |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | XE3618 |
| Publication URL: | To access bid details, please log in. |
Requires rehabilitating the existing roadway by planing bituminous pavement, excavating pavement repair areas, paving with hot mix asphalt, bridge deck repair and placing waterproof membrane for bridges, replacing existing pavement markings, traffic control and other work. Involves 47 items and 50 working days. Work class 4 - asphalt paving.
Join Team Meeting or dial in +1 (206) 531-0324 Access Code 524-008-947# (available 10:30 a.m. on bid day - bids opened after 11:00 a.m.) New to Teams? Learn more here .
Project information availableYou can find plans and specifications, plan holder lists, addenda, reference information, questions and answers and other contract documents in the Kitsap Vicinity - Paving archive.
Learn how to bid on a highway, ferry terminal or facility contract from getting prequalified to submitting your request to bid and learn how to bid electronically using BidX.com .

With GovernmentContracts, you can:
...of dewatering the site, providing erosion control, excavating the existing dike soil and ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/21/2026
...-84-Scrapers 760-90-Shovels, Power; and Excavating Machines, Telescoping and Hinged Boom Type...
State Government of Washington
Bid Due: 10/08/2026
..., excavating the existing dike soil and stockpiling, removing the 36" diameter dike ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/21/2026
.... 4. Furnishing and installing the upper and lower Fiber Optic Sensing Cables. ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/30/2026