| Location: | North Carolina |
|---|---|
| Posted: | Mar 19, 2025 |
| Due: | Apr 17, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 460-278-21 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 460-278-21 |
| Project Title: | MASON FARM PRIMARY EFFLUENT IMRPOVEMENTS PROGRESSIVE DESIGN-BUILD PROJECT |
| Description: | This Request for Proposals (RFQ) for Progressive Design-Build Services for the design and construction of the Mason Farm Primary Effluent Upsizing (Project) is issued by Orange Water and Sewer Authority (Owner) to invite the submittal of Proposals according to the requirements set forth in this RFQ. This project is expected to evaluate the addition of a new primary effluent line and/or modifications to the existing lines with construction to immediately follow. Maintaining plant operations will be essential to this project. Furthermore, an understanding of the future use of the site in the areas where the primary effluent lines and trickling filters are respective to the 2023 WWTP master plan will be essential for creating a long-term solution. The Project will include the planning, design, and construction necessary to place the Project in full operation according to requirements contained herein. The Project is to be delivered in two phases, using the progressive design-build delivery method, as follows: · Phase 1 Services (preconstruction phase): Prepare design to 60-percent complete, as described in Draft Progressive Design-Build Agreement (Agreement) (Scope of Design-Builder Services), and prepare a Phase 2 Services Proposal including a Guaranteed Maximum Price (GMP) for consideration by the Owner; and · Phase 2 Services (final design and construction phase): Complete design, construction, and post-construction tasks, including required testing, and any applicable operator training and support. |
| Opening Date: | 4/17/2025 2:00 PM |
| Posted Date: | 3/19/2025 |
| Status: | Open |
| Department: | ORANGE WATER & SEWER AUTHORITY |
|
Solicitation Number
*
460-278-21
|
Department
ORANGE WATER & SEWER AUTHORITY
|
Status Reason
Open
|
|
|
Opening Date
2025-04-17T14:00:00.0000000
|
Posted Date
*
2025-03-19T11:15:53.0000000Z
|
Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
This Request for Proposals (RFQ) for Progressive Design-Build Services for the design and construction of the Mason Farm Primary Effluent Upsizing (Project) is issued by Orange Water and Sewer Authority (Owner) to invite the submittal of Proposals according to the requirements set forth in this RFQ. This project is expected to evaluate the addition of a new primary effluent line and/or modifications to the existing lines with construction to immediately follow. Maintaining plant operations will be essential to this project. Furthermore, an understanding of the future use of the site in the areas where the primary effluent lines and trickling filters are respective to the 2023 WWTP master plan will be essential for creating a long-term solution. The Project will include the planning, design, and construction necessary to place the Project in full operation according to requirements contained herein. The Project is to be delivered in two phases, using the progressive design-build delivery method, as follows: · Phase 1 Services (preconstruction phase): Prepare design to 60-percent complete, as described in Draft Progressive Design-Build Agreement (Agreement) (Scope of Design-Builder Services), and prepare a Phase 2 Services Proposal including a Guaranteed Maximum Price (GMP) for consideration by the Owner; and · Phase 2 Services (final design and construction phase): Complete design, construction, and post-construction tasks, including required testing, and any applicable operator training and support.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...RFQ Hay Street Parking Deck Elevator Design Build Reference number: COF1516867.2 Closing date... ...
City of Fayetteville
Bid Due: 11/24/2026
...Request for Qualifications for Progressive Design-Build Services for NC I-85 Pump Station.../2026 3:00 ...
Lexington city
Bid Due: 12/07/2026
...Design-Build Services for I-85 Center Pump Station and Sewer Extension Description: The City... ...
State Government of North Carolina
Bid Due: 12/07/2026
.../Bldg S - Downtown Campus Description: HVAC Renovations Phase 4 - Building S ...
State Government of North Carolina
Bid Due: 12/08/2026