| Location: | Indiana |
|---|---|
| Posted: | Mar 31, 2026 |
| Due: | Apr 10, 2026 |
| Agency: | City of Bloomington |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Grimes Lane, Kirkwood Avenue, Patterson Drive, and Rogers Street Maintenance Project
Addenda: 1
Release Date: 3/23/2026
Due Date: 4/10/2026
NOTICE IS HEREBY GIVEN THAT THE BOARD OF PUBLIC WORKS OF THE CITY OF BLOOMINGTON, INDIANA, WILL RECEIVE SEALED Bid s FOR Grimes Lane, Kirkwood Avenue, Patterson Drive, and Rogers Street Maintenance Project , THROUGH THE CITY'S PROCUREMENT PORTAL AT https://procurement.opengov.com/portal/bloomingtonin There are multiple road sections included in this project; West Kirkwood Ave, Rogers St, Patterson Dr, and Grimes Ln. There will be work on W Kirkwood Ave between Pine Street and Rogers Street which includes replacing existing traffic signal equipment at the Rogers Street intersection, resurfacing the asphalt roadway, and upgrading pedestrian curb ramps and crosswalks to enhance walkability. Additionally, stormwater drainage improvements will be constructed. The other road sections for this project consist of asphalt pavement resurfacing (mill and overlay) of South Patterson Drive, West Patterson Drive, and West Grimes Lane between West 3rd Street and South Walnut Street. The project also includes South Rogers Street from West Patterson Drive to West 3rd Street (omitting the section between West 1st Street and West 2nd Street). Other work on these sections includes curb ramp replacement, sidewalk repair, pavement patching, sign replacement/installation, traffic signal maintenance, crosswalk improvements, and other maintenance and safety improvements.
*IMPORTANT NOTE : The Schedule of Items, and the Special and Supplementary Provisions are separated by project road sections as described above*
This project shall include, but is not limited to, the resurfacing and restriping of Grimes Ln (S Morton St to S Walnut St), Kirkwood Ave (N Pine St to N Rogers St), S Patterson Dr (W 3rd to S Fairview St), W Patterson Dr (S Fairview St to S Morton St), and S Rogers St (W Patterson Dr to W 3rd St); replacement of the existing traffic signal equipment at the intersection of W Kirkwood Ave and Rogers Street; reconstruction of pedestrian curb ramps and crosswalks; and other related maintenance work within the project limits.

With GovernmentContracts, you can: