Fraser Public Schools 2023 Bond -
BP6B: FHS Industrial Sewing Space
SECTION 001113
ADVERTISEMENT FOR BIDS
34270 Garfield Road
Fraser, Michigan
232013
FROM:
1.01 CONSTRUCTION MANAGER (HEREINAFTER REFERRED TO AS BARTON MALOW
BUILDERS): A. Address:
26500 American Drive
Southfield, MI 48034
1.02 AND THE ARCHITECT/ENGINEER (HEREINAFTER REFERRED TO AS WAKELY ASSOCIATES
ARCHITECTS ):
A. Address:
30500 Van Dyke Ave. Warren,
MI 48093
1.03 AND THE OWNER (HEREINAFTER REFERRED TO AS FRASER PUBLIC SCHOOLS):
A. Address:
1. 33466 Garfield
2. Fraser, MI, 48026
1.04 DATE: June 18, 2026
1.05 TO: POTENTIAL BIDDERS
A. Barton Malow Builders requests Bid Proposals on behalf of the Owner for the construction of
Fraser Public Schools 2023 Bond – BP6B: FHS Industrial Sewing Space work. Bid Proposals
will be received:
1. By electronic delivery by 12 pm local standard time on 7-8-2026.
2. Electronic bids are to be submitted via Building Connected.
3. The public bid opening may be attended virtually at 12 pm local standard time on
7/8/2026. Copy and paste the following Microsoft Teams Live Event Link: a.
http://bit.ly/4gzyWW6
B. Proposals shall be based on the requirements set forth in the Barton Malow Builders project
manual dated June 19th, 2026, and construction bidding documents prepared by Wakely
Associates Architects, project drawings and specifications dated June 1, 2026, for:
1. Bid Category: General Trades
C. Bidding Documents will be available for examination and distribution on or after 5 pm local
standard time on Monday, June 22nd, 2026. Examination may be made at: Barton Malow
Builders' Site office, Building Connected, & CAM/Plan rooms.
D. Building Connected Link to copy & paste:
https://app.buildingconnected.com/public/55a1292ff1a96708004a19dc
E. BuildingConnected Link Click Here
F. Accepted Bidders will be required, as a condition precedent to award of Contract, to furnish,
satisfactory Performance Bond and Payment Bond and Certificates of Insurance as required in
the Project Manual
G. Project is subject to state sales and/or use taxes and Bidder is required to include such taxes
in its Bid Proposal.
H. Project is not subject to prevailing wage rates.
I. Barton Malow Builders has been contracted by the Owner in the capacity of Construction
Manager for the Project, and shall act as representative of the Owner to the extent
required/allowed under its Owner contract.
Advertisement for Bids
1 of 2
001113
Fraser Public Schools 2023 Bond -
BP6B: FHS Industrial Sewing Space
34270 Garfield Road
Fraser, Michigan
232013
J. A pre-bid conference and site visit/tour will be held for all trades at 8:00 a.m. local standard
time for all bid categories on Tuesday, June 30th at 34270 Klein Road, Fraser, MI. All Bidders
are responsible for attendance at the pre-bid conference. Pre-bid conference minutes will be
distributed to all attendees and invited bidders. Information disclosed in the pre-bid conference
minutes will be considered part of the Bidding and Contract Documents.
K. Barton Malow Builders Project Number: 230118
L. Bidders may be required to be pre-qualified to the requirements described in Document
002113 - Instructions to Bidders for this bid package by Barton Malow Builders before
document distribution or receipt of bids per the Instructions to Bidders. Barton Malow Builders
reserves the right to request qualification forms or additional information from any Bidder
before issuing Bidding Documents, receiving Bid Proposals or awarding the Agreement.
M. Refer to other bidding requirements described in Document 002113 - Instructions to Bidders
and Document 003100 - Available Project Information.
N. Bid Proposals shall be on electronic forms furnished by Barton Malow Builders via Building
Connected. Bidders shall not withdraw or revoke Bid Proposals for a period of 90 Days after
date for receipt of Bid Proposals.
O. Bidders will be required to submit with their Bid Proposals a Bid Security, in the amount of 5%
of base bid, by a qualified surety authorized to do business in the state where the Project is
located.
P. Bidders with an Experience Modification Rate (EMR) greater than 1.0 may not be considered
for contract award.
Q. The successful bidder will be required to enter into a contract with Fraser Public Schools on
the AIA Document A132-2019 Standard Form of Agreement between Owner and Contractor,
Construction Manager as Advisor Edition.
R. The Owner reserves the right to accept or reject any or all offers.
1.06 SIGNATURE
A. For: Fraser Public Schools
END OF SECTION
Advertisement for Bids
2 of 2
001113
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.