| Location: | California |
|---|---|
| Posted: | Feb 7, 2025 |
| Due: | Feb 25, 2025 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Improvements for this project will generally include replacing the existing retaining wall on Madrone Park Circle near North Ferndale with new soldier pile and lagging wall (approximately 45’ in length) including backfill of wall and roadway patching to replace pavement removed as necessary for construction under this contract. Bidder shall be responsible for traffic control, planned road closures and staging as location of construction has limited access. Madrone Park Circle is a private dead end road. Alternate Bid Items are included for 1) extending the wall; 2) additional roadway patching in area of existing retaining wall; and, and 3) additional roadway patching in other areas of Madrone Park Circle.
See 2025 Madrone Park Circle Retaining Wall Replacement Project for full details.

With GovernmentContracts, you can:
..., Access Control, and Badging Office. The purpose of the IDMS is to ...
Sacramento County
Bid Due: 6/23/2026
...), control valve, bypass assembly, and all required accessories. -Brine tank and associated ...
JUSTICE, DEPARTMENT OF
Bid Due: 6/17/2026
...requirements. -Include resin tank(s), control valve, bypass assembly, and all required accessories..., to ...
JUSTICE, DEPARTMENT OF
Bid Due: 6/17/2026
...staff member; * Provide centralized access to accreditation documentation, policies, procedures...; * Support ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 7/18/2026