SECTION011000-SUMMARY
PART1 GENERAL
1.1 PROJECT
A. ProjectName:TheWallaceCenter.
B. Architect'sName:QA+MArchitecture.
C. TheProjectconsistsofrenovationstotheWallaceCenterasmorecompletelydescribedinthe
ContractDocuments.
1.2 CONTRACTDESCRIPTION
A. ContractType:Asingleprimecontractbasedonastipulatedpriceasdescribedinthecontract
forconstruction.
B. ConstructionManagerforthisProjectisProject'sconstructor.Theterms"Construction
Manager"and"Contractor"aresynonymous.
1.3 DIVISION01SPECIFICATIONS
A. Division01GeneralRequirementsexpandonthebroadprovisionsoftheConditionsofthe
Contract,andgoverntheexecutionoftheworkofallSectionsofthespecifications. Division01
GeneralRequirementsspecifyadministrativeandproceduralrequirementsrelatingtoexecution
oftheWork,andtemporaryfacilitiesforuseduringtheconstructionperiod.
B. IfConstructionManagerprovidesadditionalDivision01sectionsandthestandardsor
requirementsestablishdifferentorconflictingrequirementsforminimumquantitiesorquality
levels,complywiththemoststringentrequirement.Referconflictingrequirementsthatare
different,butapparentlyequal,toArchitectfordirectionbeforeproceeding.
1.4 PROJECTWARRANTY
A. RefertoGeneralConditionsforwarrantyprovisionsapplicabletothisContract.
1. ProjectwarrantyperiodisgovernedbythecodesandstatueswithintheStateinwhich
theProjectislocated,andotherprovisionsoftheContract.
B. GuaranteeofMaterialsandWorkmanship:
QAM24076 SUMMARY 011000-1
InteriorFit-OutFor: IssuedFor
TheWallaceCenter ConstructionDocuments
Greenwich,CT 08-03-2026
1. GuaranteeinwritingtoOwnerthatallworkperformedandallmaterialsandequipment
furnishedunderthisContractarenewandinaccordancewiththeContractDocuments,
arefreefromdefectsinequipment,materialsordesignfurnished,orworkmanship
performedbyContractororanyofhissubcontractorsorsuppliersatanytier.Such
guaranteeshallcontinueforaperiodnotlessthanone(1)yearfromthedateof
SubstantialCompletionoftheWork,orasotherwiserequiredbythecodesandstatutes
withintheStateinwhichtheProjectislocatedorotherprovisionsoftheContract.
2. Underthisguarantee,Contractoragreestoremedyathisownexpenseanyinferioror
defectiveequipment,materials,workmanship,ordesignthatshoulddevelopduringthe
guaranteeperiod,orinrestoringanyotherworkdamagedinfulfillingthetermsofthe
guarantee.
3. Donotperformanyworkthatshallvoidanymanufacturerguaranteeorwarranty.
C. Manufacturer'sGuaranteeandWarranty:
1. AsidentifiedinotherSectionsofthespecifications,providewrittenmanufacturer's
guaranteesandwarrantiesforspecificmaterials,products,andequipmentfurnishedand
installedunderthisContract.
2. GuaranteesandWarrantiesPeriod:Validfortheperiodoftimestatedineachapplicable
specificationSectionfromthedateofSubstantialCompletionoftheWork,butnotless
thantwelve(12)months.
D. ExtendedWarranties:
1. AsidentifiedinotherSectionsofthespecifications,providewrittenmanufacturer's
guaranteesandwarrantiesforspecificmaterials,products,andequipmentfurnishedand
installedunderthisContract.
2. GuaranteesandWarrantiesPeriod:Validforthestatedextendedperiodbeyondtwelve
(12)monthsfromthedateofSubstantialCompletionoftheWork.
E. Exclusions:
1. Warrantyrequirementscontainedinthespecificationstakeprecedence. These
exclusionsaresupersededbywarrantycoveragerequirementsofthespecifications.
2. NotifyArchitectofdesignconditionswhichcannotbefullywarranted. Submitnoticein
writingpriortopurchaseoftheaffectedproductorsystem.
3. Failuretoprovidesuchnoticewillnotbegroundsforwaiverofwarrantyrequirements
containedinthespecifications.
4. Uponreceiptofsuchnotice,Architectwillconsidermodificationsnecessarytoassurethat
finalconstructioniswarrantabletothefullextentofContractrequirements.
1.5 WORKBYOWNER
A. Certainelements,materials,andtasksfortheprojecthavebeenidentifiedasbeing"Notin
Contract"(N.I.C.),"ByOthers,"or"ByOwner." Suchmaterialsandlaborwillbeprovidedby
othersinamannerandschedulewhichisnotintendedtoimpedetheprogressoftheWork
underthiscontract.
QAM 24076 SUMMARY 011000-2
InteriorFit-OutFor: IssuedFor
TheWallaceCenter ConstructionDocuments
Greenwich,CT 08-03-2026
1. CoordinateconstructionschedulewithOwner,andgiveadequatenoticeastowhenother
workshouldbeundertaken. ReviewwithOwner'sthetimerequiredforvariouswork
requiringcoordination. IncludeworkunderothercontractsinContractor'sproject
schedule.
B. Ownerwillsupplyandinstallthefollowing:
1. Furnishings.
2. Artwork.
C. OwnerwillsupplythefollowingforinstallationbyContractor:
1. Monitors.
2. Kiosks.
3. Otheritemsnotedinthedrawings.
1.6 OWNEROCCUPANCY
A. Ownerintendstooccupyportionsoftheexistingbuildingduringtheentireconstructionperiod.
1. ConstructionOperations: Minimizeinterferencewithnormalfunctioningofbuildingand
occupants.
2. Limitnoise. Radiosarenotpermitted. Ifconstructionactivitieswillproducenoisewhich
isdetrimentaltotheoperationofthefacility,scheduletheseactivitiesduringnon-
occupiedhours.
3. Protectentrances,exits,walkways,andotherareasinthevicinityoftheconstruction
subjecttousebythepublicfromfallingobjects,orappropriatelybarricadeaccordingto
governingregulations.
B. OwnerintendstooccupytheProjectuponSubstantialCompletion.
C. CooperatewithOwnertominimizeconflictandtofacilitateOwner'soperations.
D. ScheduletheWorktoaccommodateOwneroccupancy.
1.7 CONTRACTORUSEOFSITEANDPREMISES
A. ConstructionOperations: LimitedtoareasapprovedbyOwner.
B. Arrangeuseofsiteandpremisestoallow:
1. Owneroccupancy.
2. WorkbyOthers.
3. WorkbyOwner.
4. Useofsiteandpremisesbythepublic.
C. ProvideaccesstoandfromsiteasrequiredbylawandbyOwner:
1. EmergencyBuildingExitsDuringConstruction: Keepallexitsrequiredbycodeopen
duringconstructionperiod;providetemporaryexitsignsifexitroutesaretemporarily
altered.
QAM 24076 SUMMARY 011000-3
InteriorFit-OutFor: IssuedFor
TheWallaceCenter ConstructionDocuments
Greenwich,CT 08-03-2026
2. Donotobstructroadways,sidewalks,orotherpublicwayswithoutpermit.
D. Existingbuildingspacesandsitemaynotbeusedforstorage,exceptaspermittedbyOwner.
E. TimeRestrictions:
1. Limitconductofespeciallynoisyworktothehoursof8amand5pm.
F. UtilityOutagesandShutdown:
1. ExceptasspecificallyindicatedintheContractDocuments,donotpermitinterruptionof
mechanicalandelectricalservices,shutdownofbuildingsystems,services,andutilities
withoutpriorapprovalofOwner.
2. Limitdisruptionofutilityservicestohoursthebuildingisunoccupied.
3. Donotdisruptorshutdownlifesafetysystems,includingbutnotlimitedtofiresprinklers
andfirealarmsystem,without7daysnoticetoOwnerandauthoritieshavingjurisdiction.
4. Preventaccidentaldisruptionofutilityservicestootherfacilities.
G. SpecialRestrictions:
1. Contractorpersonnelareprohibitedfromexistingbuildinginteriorsexceptasrequiredto
executespecificworkindicatedonDrawings.
2. Contractorisprohibitedfromutilizingthebuilding'scomputers,phonesandinternet
access.
3. Contractorandassociatedpersonnelandsubcontractorsarenotpermittedtouse
existingandnewtoiletfacilitiesandservicesinksinthebuildingforpersonaluse,for
cleaningtools,orfordisposingofconstructionwastematerials.
4. NoconstructionwastematerialsmaybedisposedofinOwner'sdumpstersorother
Ownercontainers.
5. Controlsmoke,dust,dirt,odorsandotherobjectionableeffects,andlimittothe
immediateareaofconstruction. Contractorisresponsibleforcleaningotherareas
affectedbynoncompliancewiththisrequirement,includingcontentsofaffectedareas.
6. Cleanworkareasofdebris,and"broomclean"nolessfrequentlythanattheendofeach
workday. Removealldebrisfromexteriorsiteareaswhichcouldbewindblown. See
Section017000foradditionalrequirements.
1.8 DELEGATEDDESIGNWORK
A. Designofproductsandsystems,orcomponentsofproductsandsystems,specifiedtobe
providedbyContractorareidentifiedinindividualspecificationSections.
B. Contractor'sResponsibilities:
1. Complywithspecifieddesignrequirementsforeachapplicableproductorsystem.
2. CoordinatedesignandspacerequirementswithotheraffectedworkandArchitect.
3. ReviewapplicablesubmittalsandcoordinateselectionswithArchitect.
4. Receiveandunloadproductsandsystemsatthesite;inspectforcompletenessandfor
damage.
5. Handle,store,install,andfinishproductsandsystems.
6. Repairorreplacedamaged,defective,ormissingitems.
QAM 24076 SUMMARY 011000-4
InteriorFit-OutFor: IssuedFor
TheWallaceCenter ConstructionDocuments
Greenwich,CT 08-03-2026
7. Arrangeformanufacturer'swarranties,inspections,andservice.
8. ComplywithapplicableprovisionsofDivision01-GeneralRequirements,specifically
includingadministrativerequirements,coordination,quality,regulatory,andproduct
requirements.
PART2 PRODUCTS-NOTUSED
PART3 EXECUTION-NOTUSED
ENDOFSECTION 011000
QAM 24076 SUMMARY 011000-5
This page intentionally left blank
InteriorFit-OutFor: IssuedFor
TheWallaceCenter ConstructionDocuments
Greenwich,CT 08-03-2026
SECTION012000-PRICEANDPAYMENTPROCEDURES
PART1 GENERAL
1.1 SECTIONINCLUDES
A. Proceduresforpreparationandsubmittalofapplicationsforprogresspayments.
B. DocumentationofchangesinContractSumandContractTime.
C. Modificationprocedures.
D. CorrelationofContractorsubmittalsbasedonContractmodifications.
E. Proceduresforpreparationandsubmittalofapplicationforfinalpayment.
1.2 RELATEDREQUIREMENTS
A. Section017800-CloseoutSubmittals: Projectrecorddocuments.
1.3 SCHEDULEOFVALUES
A. UseScheduleofValuesForm: AIAG703,editionstipulatedintheAgreement.
B. Electronicmediaprintoutincludingequivalentinformationwillbeconsideredinlieuofstandard
formspecified;submitdrafttoArchitectforapproval.
C. Formsfilledoutbyhandwillnotbeaccepted.
D. SubmitScheduleofValuesinduplicatewithin15daysafterdateofOwner-Contractor
Agreement.
E. Format: UtilizetheTableofContentsofthisProjectManual. Identifyeachlineitemwith
numberandtitleofthespecificationSection. Identifysitemobilization.
F. RevisescheduletolistapprovedChangeOrders,witheachApplicationForPayment.
1.4 APPLICATIONSFORPROGRESSPAYMENTS
A. PaymentPeriod: SubmitatintervalsstipulatedintheAgreement.
B. Form: AIAG702andG703.
C. UseFormAIAG702andFormAIAG703,editionstipulatedintheAgreement.
QAM 24076 PRICEANDPAYMENTPROCEDURES 012000-1
InteriorFit-OutFor: IssuedFor
TheWallaceCenter ConstructionDocuments
Greenwich,CT 08-03-2026
D. Electronicmediaprintoutincludingequivalentinformationwillbeconsideredinlieuofstandard
formspecified;submitsampletoArchitectforapproval.
1. Formsfilledoutbyhandwillnotbeaccepted.
E. Foreachitem,provideacolumnforlistingeachofthefollowing:
1. ItemNumber.
2. Descriptionofwork.
3. ScheduledValues.
4. PreviousApplications.
5. WorkinPlaceandStoredMaterialsunderthisApplication.
6. AuthorizedChangeOrders.
7. TotalCompletedandStoredtoDateofApplication.
8. PercentageofCompletion.
9. BalancetoFinish.
10. Retainage.
F. Executecertificationbysignatureofauthorizedofficer.
G. UsedatafromapprovedScheduleofValues. Providedollarvalueineachcolumnforeachline
itemforportionofworkperformedandforstoredproducts.
H. ListeachauthorizedChangeOrderasaseparatelineitem,listingChangeOrdernumberand
dollaramountasforanoriginalitemofwork.
I. Submitoneelectronicandthreehard-copiesofeachApplicationforPayment.
J. Includethefollowingwiththeapplication:
1. TransmittalletterasspecifiedforsubmittalsinSection013000.
2. Constructionprogressschedule,revisedandcurrentasspecifiedinSection013216.
3. CurrentconstructionphotographsspecifiedinSection013000.
4. ConditionalreleaseofliensfromeachSubcontractorandvendorforthecurrentmonth's
paymentapplication,andunconditionalreleaseofliensfromeachSubcontractorand
vendorforthepreviousmonth'spaymentapplication.
5. ProjectrecorddocumentsasspecifiedinSection017800,forreviewbyOwnerwhich
willbereturnedtotheContractor.
6. Affidavitsattestingtooff-sitestoredproducts.
K. WhenArchitectrequiressubstantiatinginformation,submitdatajustifyingdollaramountsin
question. Provideonecopyofdatawithcoverletterforeachcopyofsubmittal. Show
applicationnumberanddate,andlineitembynumberanddescription.
1.5 MODIFICATIONPROCEDURES
A. Submitnameoftheindividualauthorizedtoreceivemodificationdocumentsandwhowillbe
responsibleforinformingothersinContractor'semployorsubcontractorsofmodificationstothe
ContractDocuments.
QAM 24076 PRICEANDPAYMENTPROCEDURES 012000-2
InteriorFit-OutFor: IssuedFor
TheWallaceCenter ConstructionDocuments
Greenwich,CT 08-03-2026
B. ProjectModificationForms:FormsforuseprimarilybyContractorareidentifiedinTableof
Contents.UseofContractor'stypicalformswillbeconsidered,subjecttoapprovalofArchitect.
C. Establishandmaintainaconstructioncostlog,includingthestatusofallpendingandexecuted
ChangeOrders(accepted,declined,pending,etc.),statusofrequestsforinformation,
supplementalinstructions,othermodificationdocuments,andthestatusofallowances,
includingOwner'scontingencyallowance.
D. SupplementalInstructions: ForminormodificationsnotinvolvinganadjustmenttotheContract
SumorContractTime;ArchitectwillissueinstructionsdirectlytoContractor.
1. Architect'sissuanceofsupplementalinstructionsmayconstituteamodificationofthe
ContractDocumentsinvolvinganadjustmenttotheContractSumorContractTime. If
Architect'ssupplementalinstructionsrequiresuchamodificationoftheContract
Documents,preparearequestforchangeorderorothermodificationaccordingto
applicablemodificationproceduresspecifiedinthisSection.
E. ConstructionChangeDirective: Forotherrequiredmodifications,Architectwillissuea
documentsignedbyArchitectandOwnerinstructingContractortoproceedwiththe
modification,forsubsequentinclusioninaChangeOrder.
1. Thedocumentwilldescribetherequiredchangesandwilldesignatemethodof
determininganychangeinContractSumorContractTime.
2. Promptlyexecutethechange.
F. ProposalRequest:Formodificationsforwhichadvancepricingisdesired,Architectwillissuea
documentwhichincludesadetaileddescriptionofaproposedmodificationwithsupplementary
orreviseddrawingsandspecifications.Contractorshallprepareandsubmitafixedprice
quotationwithin10days,estimatinganychangestoContractSumandContractTimefor
executingthemodification. Contractor'squotationshallstipulateanyovertimeworkrequired
andtheperiodoftimeduringwhichtherequestedpricewillbeconsideredvalid.
G. Contractormayproposeachangebysubmittingarequestforchangeorderormodificationto
Architect,describingtheproposedchangeanditsfulleffectontheWork,withastatement
describingthereasonforthechange,andtheeffectontheContractSumandContractTime
withfulldocumentationandastatementdescribingtheeffectonWorkbyseparateorother
contractors.
1. ThetimerequiredfortheOwner,Architect,and/orprojectteamtoreviewproposed
changeorderscannotbeattributedtoconstructionprojecttimeframedelayorproject
timeframeextension.
2. DocumentanyrequestedsubstitutionsinaccordancewithSection016000.
H. ComputationofChangeinContractAmount: AsspecifiedintheAgreementandConditionsof
theContract.
1. ForchangerequestedbyArchitectforworkfallingunderafixedpricecontract,the
amountwillbebasedonContractor'spricequotation.
2. ForchangerequestedbyContractor,theamountwillbebasedontheContractor's
requestforaChangeOrderasapprovedbyArchitect.
QAM 24076 PRICEANDPAYMENTPROCEDURES 012000-3
InteriorFit-OutFor: IssuedFor
TheWallaceCenter ConstructionDocuments
Greenwich,CT 08-03-2026
3. ForchangeorderedbyArchitectwithoutaquotationfromContractor,theamountwillbe
determinedbyArchitectbasedontheContractor'ssubstantiationofcostsasspecifiedfor
TimeandMaterialwork.
I. SubstantiationofCosts: Providefullinformationrequiredforevaluation.
1. Providethefollowingdata:
a. Quantitiesofproducts,labor,andequipment.
b. Taxes,insurance,andbonds.
c. Overheadandprofit.
d. JustificationforanychangeinContractTime.
e. CreditfordeletionsfromContract,similarlydocumented.
2. Supporteachclaimforadditionalcostswithadditionalinformation:
a. Originanddateofclaim.
b. Datesandtimesworkwasperformed,andbywhom.
c. Timerecordsandwageratespaid.
d. Invoicesandreceiptsforproducts,equipment,andsubcontracts,similarly
documented.
3. ForTimeandMaterialwork,submititemizedaccountandsupportingdataafter
completionofchange,withintimelimitsindicatedintheConditionsoftheContract.
J. ExecutionofChangeOrders: ContractorwillissueChangeOrdersforsignaturesofpartiesas
providedintheConditionsoftheContract.
K. AfterexecutionofChangeOrder,promptlyreviseScheduleofValuesandApplicationfor
PaymentformstorecordeachauthorizedChangeOrderasaseparatelineitemandadjustthe
ContractSum.
L. PromptlyreviseprogressschedulestoreflectanychangeinContractTime,revisesub-
schedulestoadjusttimesforotheritemsofworkaffectedbythechange,andresubmit.
M. PromptlyenterchangesinProjectRecordDocuments.
1.6 APPLICATIONFORFINALPAYMENT
A. PrepareApplicationforFinalPaymentasspecifiedforprogresspayments,identifyingtotal
adjustedContractSum,previouspayments,andsumremainingdue.
B. ApplicationforFinalPaymentwillnotbeconsidereduntilthefollowinghavebeenaccomplished:
1. AllcloseoutproceduresspecifiedinSection017000.
2. ReceiptofunconditionalreleaseofliensfromContractorandeachSubcontractorand
vendorforthepreviousmonth'spaymentapplication.
3. ReceiptoffinalCertificateofOccupancyfromjurisdictionalauthority.
4. AcceptanceofWorkbyOwnerandArchitect.
QAM 24076 PRICEANDPAYMENTPROCEDURES 012000-4

With GovernmentContracts, you can:
Follow Multiple NSNs - Collins Aerospace (multiple CAGEs} / Multiple Weapons Systems: Sole
DEPT OF DEFENSE
Bid Due: 11/02/2026
BLDG2026-2 Transfer Station Building and Property Evaluation This solicitation is being posted to
State Government of Connecticut
Bid Due: 11/03/2026
Number 8955 Title EMS Training Services Available Date 10/16/2026 10:40 AM Clarification Deadline
City of Waterbury
Bid Due: 11/03/2026
Number 8958 Title Street Sweeper Available Date 10/16/2026 10:40 AM Clarification Deadline 10/23/2026
City of Waterbury
Bid Due: 11/02/2026