| Location: | Colorado |
|---|---|
| Posted: | Oct 6, 2025 |
| Due: | Sep 24, 2025 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF25B000024 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
CO NP MEVE 201(1) CEDAR TREE TOWER ROAD AND PARKING
PROJECT DESCRIPTION: Project improvements are within Mesa Verde National Park in Cortez, Colorado. This resurfacing, restoration, and rehabilitation (3R) roadway, parking lot, and lagging wall improvement project spans spanning across 11 locations in Mesa Verde. The elevations range from 6954 to 8062-feet. The project has one Schedule A (4.7 miles total) and Option X (0.2 miles).
PRE-BID SITE VISIT: OCTOBER 9, 2025 - See link below for details
SCOPE OF THE WORK: The 11 identified project locations and proposed improvements are as follows:
Schedule A Improvements:
Option X Improvements:
PRINCIPAL WORK ITEMS:
Schedule A
Pay Item / Description / Quantity
30402-5200 Full Depth Reclamation, Method 2, 4-inch depth 10,000 square yards
30402-5200 Full Depth Reclamation, Method 2, 6-inch depth 14,000 square yards
40301-0100 Asphalt Concrete Pavement, Type 1 4,700 tons
40702-0200 Chip Seal, Type 1B 58,500 square yards
40711-0000 Emulsified Asphalt 58,500 square yards
41801-1000 Asphalt Concrete Pavement Patch, Type 1 750 square yards
55502-0000 Structural Steel, Furnished, Fabricated, and Erected 12,219 pounds
60901-0000 Curb, Concrete 3,000 linear feet
Option X:
Pay Item / Description / Quantity
30202-2000 Roadway Aggregate, Method 2 70 tons
30402-5200 Full Depth Reclamation, Method 2, 4-inch depth 2,200 square yards
40301-0100 Asphalt Concrete Pavement, Type 1 500 tons
60707-0300 Lining 18-inch Pipe Culvert 2 each
60901-2900 Curb, Stone, Type 1, 6-inch 40 linear feet
63501-0000 Temporary Traffic Control Lump Sum
ANTICIPATED SCHEDULE:
ESTIMATED COST RANGE: Schedule and all Options are between $5,000,000 and $10,000,000.
| Sep 10, 2025 | [Presolicitation (Original)] CO NP MEVE 201(1) , Cedar Tree Tower Road and Parking |
| Oct 3, 2025 | [Presolicitation (Updated)] CO NP MEVE 201(1) , Cedar Tree Tower Road and Parking |
| Oct 14, 2025 | [Solicitation (Updated)] CO NP MEVE 201(1) , Cedar Tree Tower Road and Parking |
| Oct 30, 2025 | [Solicitation (Updated)] CO NP MEVE 201(1) , Cedar Tree Tower Road and Parking |
| Nov 13, 2025 | [Solicitation (Updated)] CO NP MEVE 201(1) , Cedar Tree Tower Road and Parking |
| Dec 30, 2025 | [Solicitation (Updated)] CO NP MEVE 201(1) , Cedar Tree Tower Road and Parking |

With GovernmentContracts, you can:
Engineering - The Eagle County Engineering Department is soliciting proposals from contractors to
Eagle County
Bid Due: 6/26/2026
Description: FY27 PMAA 4291 Bulk Oxygen Department: DNR - Division of Parks &
State Government of Colorado
Bid Due: 6/11/2026
Description: TSC IFB2026000194 Department: Trinidad State Junior College Buyer: Penny Bueno Solicitation Number:
State Government of Colorado
Bid Due: 6/17/2026
Follow Pest Control (Geese Mitigation) Services, Ft Logan National Cemetery Active Contract Opportunity
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/05/2026