Swift Creek Pump Station PLC Improvements

Location: North Carolina
Posted: Oct 15, 2026
Due: Nov 5, 2026
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 354-UT27-17
Publication URL: To access bid details, please log in.
Solicitation Number: 354-UT27-17
Project Title: Swift Creek Pump Station PLC Improvements
Description: The Town of Cary is seeking proposals from qualified control system integrators to design, furnish, program, install, test, and commission improvements to the supervisory and control system at the Swift Creek Pump Station. All proposers are encouraged, but not required, to attend the preproposal conference at the Swift Creek Pump Station on October 22, 2026 at 2:00 PM ET. Questions are due October 26, 2026 by 5:00 PM ET. Final proposals are due November 5, 2026.
Opening Date: 11/5/2026 10:00 AM
Posted Date: 10/15/2026
Status: Open
Department: TOWN OF CARY
Solicitation Number
*
354-UT27-17
Department
TOWN OF CARY
Status Reason
Open
Opening Date
2026-11-05T10:00:00.0000000
Posted Date
*
2026-10-15T14:56:32.0000000Z
Primary Commodity Code
Process control or packaged automation systems
Mandatory Conference/Site Visit
—
—
Special Instructions
—
Solicitation Type
*
RFP
Owner
Kathryn McMillan
Description
The Town of Cary is seeking proposals from qualified control system integrators to design, furnish, program, install, test, and commission improvements to the supervisory and control system at the Swift Creek Pump Station. All proposers are encouraged, but not required, to attend the preproposal conference at the Swift Creek Pump Station on October 22, 2026 at 2:00 PM ET. Questions are due October 26, 2026 by 5:00 PM ET. Final proposals are due November 5, 2026.

Attachment Preview

REQUEST FOR PROPOSALS
RFP #354-UT27-17
Project Title: Swift Creek Pump Station PLC Improvements
Issue Date: October 14, 2026
Due Date: November 5, 2026 ET ET
Issuing Department: Utilities Department
Direct all inquiries concerning this RFP to:
Yang Song
Senior Project Manager, Utilities Engineering
Email: Yang.Song@carync.gov
v.04.15.24

Table of Contents
1 REQUEST FOR PROPOSALS ....................................................................... 2
1.1 Introduction ...................................................................................................................... 2
1.2 Purpose and Background .............................................................................................. 2
1.3 Notice to Vendors Regarding RFP Terms and Conditions ...................................... 2
1.4 RFP Response Timeline................................................................................................ 3
1.5 Pre-Proposal Conference/Site Visit ............................................................................. 3
1.6 Proposal Questions ........................................................................................................ 3
1.7 Proposal Submission Requirements and Contact Information ................................ 3
1.8 Rights to Submitted Material ......................................................................................... 4
2 PROPOSALS .................................................................................................. 4
2.1 Request for Proposal Document .................................................................................. 5
2.2 Evaluation Criteria .......................................................................................................... 5
2.3 Proposal Evaluation Process ........................................................................................ 6
2.4 Final Selection ................................................................................................................. 6
2.5 Contract Term ................................................................................................................. 6
2.6 Invoices ............................................................................................................................ 7
2.7 Notice to Proposers Regarding RFP Terms and Conditions ................................... 7
3 SCOPE OF SERVICES................................................................................... 7
4 COST PROPOSAL/EXECUTION OF PROPOSAL ....................................... 17
5 REFERENCES .............................................................................................. 18
INSTRUCTIONS TO VENDORS ........................................................................ 19
TOWN OF CARY PRINCIPAL CONTRACT ....................................................... 21

1 REQUEST FOR PROPOSALS
1.1 Introduction
Cary is seeking proposals from qualified control system integrators to design, furnish, program,
install, test, and commission improvements to the supervisory and control system at the Swift
Creek Pump Station.
1.2 Purpose and Background
The Swift Creek Pump Station consists of two pump stations located at a single facility. The
original pumping system, commissioned over 35 years ago, operates on 575-volt power and is
now in process to convert to 480-volt power. Associated with this electrical improvement, the old
pump station control and monitoring system will also need to be replaced and reprogrammed to
accommodate the voltage change. The objective of this project will be to upgrade the control
system and provide a solution for integrating existing pump station equipment with increased
operation redundancy.
1.3 Notice to Vendors Regarding RFP Terms and Conditions
It shall be the Vendor's responsibility to read the Instructions, the Town's terms and conditions
contained within the Town's Principal Contract, all relevant exhibits and attachments, and any
other components made a part of this RFP and comply with all requirements and specifications
herein. Vendors also are responsible for obtaining and complying with all Addenda and other
changes that may be issued in connection with this RFP.
If Vendors have questions, issues, or exceptions regarding any term, condition, or other
component within this RFP, those must be submitted as questions in accordance with the
instructions in Section 1.6 Proposal Questions. If the Town determines that any changes will be
made as a result of the questions asked, then such decisions will be communicated in the form
of an RFP addendum. The Town may also elect to leave open the possibility for later negotiation
and amendment of specific provisions of the Principal Contract that have been addressed during
the question submission period. Other than through this process, the Town rejects and will not
be required to evaluate or consider any additional or modified terms and conditions submitted
with Vendor's proposal. This applies to any language appearing in or attached to the document
as part of the Vendor's proposal that purports to vary any terms and conditions or Vendors'
instructions herein or to render the proposal non-binding or subject to further negotiation. Vendor's
proposal shall constitute a firm offer. By execution and delivery of this RFP Response, the
Vendor agrees that Vendor is prepared to enter into a contract in the form of the Principal
Contract should Town selects Vendor's proposal and that any additional or modified terms
and conditions, whether submitted purposely or inadvertently, shall have no force or
effect, and will be disregarded. Noncompliance with, or any attempt to alter or delete, this
paragraph shall constitute sufficient grounds to reject Vendor's proposal as
nonresponsive.
If a Vendor desires modification of the terms and conditions of this solicitation, including any term
or condition contained in the Principal Contract, it is urged and cautioned to inquire during the
question period, in accordance with the instructions in this RFP, about whether specific language
proposed as a modification is acceptable to or will be considered by the Town. Identification of
objections or exceptions to the Town's terms and conditions in the proposal itself shall not be
allowed and shall be disregarded or the proposal rejected.
2

RFP Process Date and time
RFP posted October 15, 2026 R
Pre-Proposal Conference October 22, 2026 2:00 p.m.
Proposers Written Questions Due October 26, 2026 5:00 p.m.
Town Responses to Proposers questions October 28, 2026
Proposal Submission Deadline November 5, 2026 10:00 a.m.
Contract Award November, 2026
Contract Effective Date November/ December 2026
Reference Vendor Question
RFP Section, Page Number Vendor question ...?

1.4 RFP Response Timeline
The RFP process shall adhere to the following schedule:
RFP Process Date and time
RFP posted October 15, 2026 R
Pre-Proposal Conference October 22, 2026 2:00 p.m.
Proposers Written Questions Due October 26, 2026 5:00 p.m.
Town Responses to Proposers questions October 28, 2026
Proposal Submission Deadline November 5, 2026 10:00 a.m.
Contract Award November, 2026
Contract Effective Date November/
December 2026
Note: All times shown as Eastern Time (ET).
1.5 Pre-Proposal Conference/Site Visit
NOTE: All Proposers are encouraged to attend a PREPROPOSAL CONFERENCE/SITE VISIT
At the Swift Creek Pump Station located at 7802 Holly Springs Rd, Cary NC 27518. A
summary of all questions and answers will be posted on the internet as an addendum, located
under the RFP # 354-UT27-17.
It is the Proposer's responsibility to assure that all addenda have been reviewed and, if
need be, signed and returned.
1.6 Proposal Questions
Upon review of the RFP documents, Vendors may have questions to clarify or interpret the RFP
in order to submit the best proposal possible. To accommodate the Proposal Questions process,
Vendors shall submit any such questions by the above due date. The Town will not entertain any
further questions after the due date. Written questions shall be emailed to
Yang.Song@carync.gov by the date and time specified above. Vendors should enter "RFP #354-
UT27-17: Questions" as the subject for the email. Questions submittals should include a reference
to the applicable RFP section and be submitted in a format shown below:
Reference Vendor Question
RFP Section, Page Number Vendor question ...?
Questions received prior to the submission deadline date, the Town's response, and any
additional terms deemed necessary by the Town will be posted in the form of an addendum to
the North Carolina Electronic Vendor Portal (eVP), https://evp.nc.gov/solicitations, and shall
become an Addendum to this RFP. No information, instruction or advice provided orally or
informally by any Town personnel, whether made in response to a question or otherwise in
connection with this RFP, shall be considered authoritative or binding. Vendors shall rely only on
written material contained in an Addendum to this RFP.
1.7 Proposal Submission Requirements and Contact Information
Submittal Requirements and Contact Information
Electronic responses ONLY will be accepted through the eVP website. Interested parties must be
logged in to submit proposals electronically. Registration information is available at NC Electronic
3

Vendor Portal evp.nc.gov (eVP). Proposals must be clearly marked with name of the submitting
company, the RFP number and RFP title. Proposers must submit one (1) electronic version,
submitted as a viewable and printable Adobe Portable Document File (PDF), on or before the
submittal due date and time provided in Section 1.3. Submissions that do not comply with the
stated submission method will be deemed non-responsive. The Town reserves the right to reject
any or all proposals for any reason and to waive any informality it deems in its best interest. Any
requirements in the RFP that cannot be met must be indicated in the proposal. Proposers must
respond to the entire Request for Proposals (RFP). An incomplete proposal may be eliminated
from consideration at the discretion of Cary.
Proposals must follow the format as defined in Section 2 PROPOSALS.
1.8 Rights to Submitted Material
All proposals, responses, inquiries, or correspondence relating to or in reference to this RFP, and
all reports, charts, and other documentation submitted by Proposers (other than materials
submitted as and qualifying as trade secrets under North Carolina law) shall become the property
of the Town when received and the entire proposal shall be subject to the public records laws of
the State of North Carolina except where a proper trade secrets exception has been made by the
Proposer in accordance with the procedures allowed by North Carolina law.
The Town reserves the right to retain all proposals submitted and to use any ideas in a proposal
regardless of whether that proposal is selected. Submission of a proposal indicates acceptance
by the Proposer of the conditions contained in this Request for Proposal.
2 PROPOSALS
Responses must follow the format outlined herein. The Town may reject as non-responsive at its
sole discretion any proposal or any part thereof that is incomplete, inadequate in its response, or
departs in any substantive way from the required format. Proposal responses shall be organized
in the following manner:
1. Cover Letter/Letter of Intent
Introduction letter with intent as it may pertain to the Request for Proposal.
2. Corporate Background and Experience
This section shall include background information on the organization and should give details
of experience with similar projects. A list of five (5) references (including contact persons and
telephone numbers) for which similar work has been performed shall be included, and the list
shall include all similar contracts performed by the Proposer in the past five years. The
evaluators will randomly select at least three of these references, but the evaluators reserve
the right to contact all the references listed, if information from the three references contacted
warrant further inquiry. The failure to list all similar contracts in the specified period may result
in the rejection of the Proposer's proposal. The evaluators may check all public sources to
determine whether Proposer has listed all contracts for similar work within the designated
period. If the evaluators determine that references for other public contracts for similar
contracts were not listed, the evaluators may contact the public entities to make inquiry into
Proposer's performance of those contracts and the information obtained may be considered
in evaluating Proposer's proposal.
3. Project Understanding, Approach and Schedule
4

Criteria (a) (b) (a) x (b)
Weight Score (0-3) Weighted Score
Corporate Background and Experience 15
Project understanding and approach 35
Team Organization, References (Past Experience) 20
Cost Proposal 30
Final Score

This section shall include, in narrative, outline, and/or graph form the Proposer's approach to
accomplishing the tasks outlined in the Scope of Work section of this RFP. A description of
each task and deliverable and the schedule for accomplishing each shall be included.
4. Team Organization, Experience and Certifications/Qualifications
This section must include the proposed staffing, deployment and organization of personnel to
be assigned to this project. The Proposer shall provide information as to the qualifications and
experience of all executive, managerial, legal, and professional personnel to be assigned to
this project, including resumes citing experience with similar projects and the responsibilities
to be assigned to each person.
5. Cost Proposal (Page with Pricing)
The Cost Proposal shall be submitted and contain:
* Materials costs (refer to the recommended Bill of Material)
* Personnel costs (including hourly rates and total hours)
* Travel and Subsistence Expenses
* Subcontractor Costs (if any)
* Other Costs (e.g., office expenses)
* TOTAL COST: A total not to exceed cost representing the maximum amount for all work
to be performed must be clearly indicated under this heading.
2.1 Request for Proposal Document
The RFP is comprised of the base RFP document, any attachments, and any addenda released
before Contract award. All attachments and addenda released for this RFP in advance of any
Contract award are incorporated herein by reference.
2.2 Evaluation Criteria
This is not a bid. There will not be a public bid opening. Proposals will be evaluated based on the
following criteria:
(a) (b) (a) x (b)
Criteria
Weight Score (0-3) Weighted Score
Corporate Background and Experience 15
Project understanding and approach 35
Team Organization, References (Past
20
Experience)
Cost Proposal 30
Final Score
Score Points
0- Missing or Does Not Meet Expectation 2- Meets Expectation
1- Partially Meets Expectation 3- Exceeds Expectation
5

2.3 Proposal Evaluation Process
The Town shall review all Vendor responses to this RFP to confirm that they meet the
specifications and requirements of the RFP.
The Town will conduct a One-Step evaluation of Proposals:
Proposals will be received from each responsive Vendor in a sealed envelope or package.
All proposals must be received by the issuing agency not later than the date and time specified
on the cover sheet of this RFP.
At that date and time, the package containing the proposals from each responding firm will remain
sealed and opened at time of review. Interested parties are cautioned that these costs and their
components are subject to further evaluation for completeness and correctness and therefore
may not be an exact indicator of a Vendor's pricing position.
At their option, the evaluators may request oral presentations or discussion with any or all Vendors
for the purpose of clarification or to amplify the materials presented in any part of the proposal.
Vendors are cautioned, however, that the evaluators are not required to request presentations or
other clarification-and often do not. Therefore, all proposals should be complete and reflect the
most favorable terms available from the Vendor.
Proposals will generally be evaluated according to completeness, content, and experience with
similar projects, ability of the Vendor and its staff, and cost. Specific evaluation criteria are listed
in 2.2 EVALUATION CRITERIA, above.
Vendors are cautioned that this is a request for offers, not an offer or request to contract, and the
Town reserves the unqualified right to reject any and all offers at any time if such rejection is
deemed to be in the best interest of the Town.
2.4 Final Selection
Proposals will be reviewed after opening and will be ranked in order of choice. A recommendation
will then be presented to the Town Manager or their designee for approval to negotiate a contract
with the #1 choice and, if unsuccessful, to then pursue negotiations with the #2 choice. All
Proposers will be notified of their standing immediately following Town's decision. Price quoted
must be held firm for 90 days after the RFP is due. The Town reserves the right to make an award
without further discussion of the proposal submitted. The Town shall not be bound or in any way
obligated until both parties have executed a contract. The Town also reserves the right to delay
the award of a contract or to not award a contract. The RFP may be awarded by individual task
or total proposal, whichever is most advantageous to the Town of Cary.
The general conditions and specifications of the RFP and the selected proposal, as amended by
agreement between the Town and the selected Proposer including e-mail or written
correspondence relative to the RFP, may become part of the contract documents. Failure of the
awarded Contractor to perform as represented may result in elimination of the Contractor from
competition or in contract cancellation or termination.
2.5 Contract Term
The Contract shall have an initial term of one year, beginning on the date of contract award (the
"Effective Date").
6

The Town shall have the option, in its sole discretion, to renew the Contract on the same terms
and conditions for up to a total of two additional one-year terms. The Town will give the Vendor
written notice of its intent whether to exercise each option by a duly authorized amendment.
2.6 Invoices
a) Invoices must be submitted to the Town of Cary Accounts Payable in email on the
Contractor's official letterhead stationery and must be identified by a unique invoice number.
All invoice backup reports and spreadsheets must be provided in electronic format.
b) Invoices must bear the purchase order number to ensure prompt payment. The Vendor's
failure to include the correct purchase order number may cause delay in payment.
c) Invoices must include an accurate description of the work for which the invoice is being
submitted, the invoice date, the period of time covered, the amount of fees due to the Vendor.
2.7 Notice to Proposers Regarding RFP Terms and Conditions
It shall be the Proposer's responsibility to read the Instructions, the Town's terms and conditions,
all relevant exhibits and attachments, and any other components made a part of this RFP, and
comply with all requirements and specifications herein. Proposers also are responsible for
obtaining and complying with all addenda and other changes that may be issued in connection
with this RFP.
3 SCOPE OF SERVICES
It is the intent of these requirements to furnish the Cary Swift Creek Pump Station control system
with all material, equipment, labor, engineering, programming, integration, testing, and other
related work necessary to complete the Cary Swift Creek Pump Station control system
improvement outlined in the Scope of Services. CONTRACTOR shall review the existing systems
and deliver a complete, functioning installation while maintaining the required pump station
operating capability throughout the work. CONTRACTOR shall utilize the most feasible, timely
and cost-effective method(s) for completing the work.
1. Scope of Work Summary
a. The scope of work includes, but is not limited to, the items below. See Section 2
through 9 for detailed technical requirements. Provide existing system verification,
detailed design, panel fabrication, programming, staged migration, integration, testing,
startup, training, and documentation.
b. Inclusions:
i. PLC hardware and programming;
ii. HMI configuration;
iii. Control panel fabrication (UL 508A);
iv. VFD integration as specified;
v. Field instrumentation as specified;
vi. Site Acceptance Test (SAT);
vii. Startup and commissioning;
viii. Training;
ix. As-built documentation;
x. Software source files delivered to Owner
c. Exclusions:
7

i. Electrical power feed to panel;
ii. PLC panel termination work,
iii. Civil/site work;
iv. Network/telecom infrastructure;
v. Instrument process taps
d. Site Location and Access
i. Site Address: 7802 Holly Springs Rd, Cary NC 27518
ii. Working hours permitted: M-F 7:00 - 17:00; no work weekends/holidays unless
approved.
e. Applicable Codes and Standards.
The work shall comply with the latest published edition of the following codes and
standards, plus all applicable state and local amendments:
i. NFPA 70 - National Electrical Code (NEC)
ii. NFPA 820 - Standard for Fire Protection in Wastewater Treatment and
Collection Facilities
iii. NFPA 70E - Standard for Electrical Safety in the Workplace (arc flash)
iv. IEEE 1584 - Guide for performing arc-flash hazard calculations
v. UL 508A / UL 698A - Industrial control panels
vi. IEC 61131-3 - Programmable controllers programming languages
vii. ISA / IEC 62443 - Industrial automation cybersecurity (OT)
2. Control System Architecture and Hardware
a. PLC Platform
i. Required platform: Allen-Bradley ControlLogix, CompactLogix, or GuardLogix
controllers
ii. Redundancy:
* The new replacement PLC cabinet in the old control room will function
as a master control system to run all six pumps across the new and old
side wet wells
* The existing PLC in the new control room will function as a CPU Level
hot-standby control system to take over the control of six pumps when
the master PLC is in fault mode
* The Master PLC shall execute the control program and control the
shared I/O. The Backup PLC shall continuously execute or monitor the
same application and remain synchronized with the Master. The
Backup PLC shall not control physical outputs while in standby.
* The Backup PLC shall be continuously synchronized with the Master
using the PLC manufacturer's standard redundancy functions.
Synchronization shall include all data required to continue process
control without restarting the process sequence.
* The redundant PLC system shall complete an automatic processor
switchover, including transfer of control authority to the shared I/O
system, within the maximum time stated by the manufacturer and
approved by the Owner. The Supplier shall state the guaranteed
maximum time separately for processor detection, controller role
transfer, shared-I/O ownership transfer, and restoration of normal
process control.
8

Device/System I/O Type Signal Description
Wet Well AI Wet Well Level Transmitter
DI High Wet Well Float
DI Lead Float
DI Lag Float
DI Low Float
Pump #1 AI Pump #1 VFD Speed Feedback
AO Pump #1 VFD Speed Command
DI Pump #1 HOA Status
DI Pump #1 Run Status
DI Pump #1 Fault Status
DI Pump #1 VFD Fault
DO Pump #1/VFD Start Command
Pump #2 AI Pump #2 VFD Speed Feedback
AO Pump #2 VFD Speed Command
DI Pump #2 HOA Status
DI Pump #2 Run Status
DI Pump #2 Fault Status
DI Pump #2 VFD Fault
DO Pump #2/VFD Start Command
Pump #3 AI Pump #3 VFD Speed Feedback
AO Pump #3 VFD Speed Command
DI Pump #3 HOA Status
DI Pump #3 Run Status
DI Pump #3 Fault Status
DI Pump #3 VFD Fault
DO Pump #3/VFD Start Command
Bar Screen DI BS 1 Running
DI BS 1 Fault

* Only one PLC shall have control authority over the shared physical
outputs at any time. The redundancy system shall provide a
manufacturer-supported method to arbitrate output ownership and
prevent simultaneous control by both PLCs.
* Because the I/O and communications equipment are shared, the
Supplier shall define the response to failure of each common
component. A shared-I/O failure shall generate a separate diagnostic
alarm and shall not automatically be treated as a Master PLC failure.
* The redundant PLC system shall prevent both PLCs from becoming
active simultaneously. Provide an authorized manual switchover
function from the HMI, engineering workstation, or local control panel.
iii. Product lifecycle: Proposed PLC/HMI must be on active (not mature/obsolete)
manufacturer lifecycle status; disclose support availability window.
b. I/O Requirements
i. Recommended I/O list as shown in the table below
Device/System I/O Type Signal Description
Wet Well AI Wet Well Level Transmitter
DI High Wet Well Float
DI Lead Float
DI Lag Float
DI Low Float
Pump #1 AI Pump #1 VFD Speed Feedback
AO Pump #1 VFD Speed Command
DI Pump #1 HOA Status
DI Pump #1 Run Status
DI Pump #1 Fault Status
DI Pump #1 VFD Fault
DO Pump #1/VFD Start Command
Pump #2 AI Pump #2 VFD Speed Feedback
AO Pump #2 VFD Speed Command
DI Pump #2 HOA Status
DI Pump #2 Run Status
DI Pump #2 Fault Status
DI Pump #2 VFD Fault
DO Pump #2/VFD Start Command
Pump #3 AI Pump #3 VFD Speed Feedback
AO Pump #3 VFD Speed Command
DI Pump #3 HOA Status
DI Pump #3 Run Status
DI Pump #3 Fault Status
DI Pump #3 VFD Fault
DO Pump #3/VFD Start Command
Bar Screen DI BS 1 Running
DI BS 1 Fault
9

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Solicitation Number: 274-605PS Project Title: EM Johnson WTP 605 High Service Pump Replacement

State Government of North Carolina

Bid Due: 12/08/2026

Solicitation Number: 274-POLNT Project Title: Poole Road Pump Station Improvements Description: Poole Road

State Government of North Carolina

Bid Due: 1/07/2027

REQUEST FOR QUALIFICATIONS PROFESSIONAL ENGINEERING SERVICES Browning Branch Booster Pump Station Project The

Waynesville town

Bid Due: 12/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.