| Location: | Alaska |
|---|---|
| Posted: | Mar 21, 2025 |
| Due: | May 7, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W911KB25R0002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This is a pre-solicitation notice for a two-phase, full and open Request for Proposal (RFP) for a Design-Build project for a new Alaska Army National Guard Readiness Center Additions (approx. 50,641 SF) at Camp Carroll in the Ft. Richardson side of JBER, Alaska (JBR032). The readiness center will be designed and constructed to support training, administrative, logistical, and operational requirements of three AKARNG units. Design and construction will include all utility services, systems, site improvements, drainage, parking areas to support the facility. Integral part of the facility will be a designated paved area for organizational (military equipment) parking/staging area. The readiness center will have a general-purpose training/maintenance bay, assembly area, controlled hazardous waste and POL storage area, a fully equipped commercial kitchen, heated storage spaces for each occupying unit, arms vault for each occupying unit, training/classrooms, secure room, and admin/office spaces. Comprehensive interior design services will be required. The readiness center will have a backup generator that will fully support continuous operation of the readiness center during a prolonged utility power interruption.
The contract cost limitation for contract award is approximately $54,000,000. The resulting contract will be firm-fixed priced. The procurement will be conducted using two-phase source selection procedures and the award will be based on best value tradeoff source selection procedures, considering the price and non-price factors cited in this announcement and the solicitation.
All Offerors must be registered in the System for Award Management (SAM) (https://www.sam.gov/SAM/). Joint ventures must be registered in SAM as the joint venture. Offerors are advised to begin this process when they prepare their proposal in order to ensure this registration is in place should they be selected for the award. Lack of registration in the SAM database will make an Offeror ineligible for award.
Anticipated NTP: 25 September 2025 with a 1095 calendar-day period of performance; the Davis Bacon Act will apply.
(1) PROJECT INFORMATION: AK ARMY NATIONAL GUARD READINESS CENTER (approx. 50,641 SF) at Camp Carroll in the Ft. Richardson side of JBER, Alaska. The readiness center will be designed and constructed to support training, administrative, logistical, and operational requirements of the three AKARNG units.
(2) SELECTION CRITERIA: Evaluation criteria to be listed in the solicitation are anticipated to be:
Phase 1: Proposal and Related Factors
Factor 1 – Past Performance (Confidence Assessment)
Factor 2 – Technical Approach
Phase 2: Design Technical
Factor 1 – Building Function and Aesthetics
Factor 2 – Quality of Building Systems and Materials
Factor 3 – Site Design
Factor 4 – Proposed Contract Duration and Summary Schedule
Factor 5 – Extent of Participation of Small Business
Factor 6 – Price
(3) OBTAINING THE SOLICITATION: The solicitation for this project will be provided in electronic format only and is currently scheduled to be available for download on or about 07 April 2025 at the PIEE Solicitation Module website at https://piee.eb.mil/sol/xhtml/unauth/index.xhtml via Solicitation number (W911KB25R0002). Any future amendments to the solicitation will also be available for download from this website. All responsible sources may submit an offer which will be considered by the agency. All notifications of changes to this solicitation shall be made through the internet only. It is the Offeror’s responsibility to check for any posted changes to this solicitation.
NOTE: Electronic proposal submissions will only be accepted via the PIEE Solicitation Module website at: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml. Search via Solicitation Number Search W911KB25R0002. IN ORDER TO SUBMIT A PROPOSAL, VENDORS MUST REGISTER IN THE PIEE SYSTEM AND MUST HAVE A PROPOSAL MANAGER ROLE ESTABLISHED. ADDITIONAL INFORMATION REGARDING PROPOSAL MANAGER, PROPOSAL MANAGER FUNCTIONS AND POSTING OFFERS CAN BE FOUD AT https//pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml
| Apr 16, 2025 | [Solicitation (Original)] JBR032 Alaska National Guard Readiness Center |
| Apr 30, 2025 | [Solicitation (Updated)] JBR032 Alaska National Guard Readiness Center |
| May 15, 2025 | [Solicitation (Updated)] JBR032 Alaska National Guard Readiness Center |
| May 21, 2025 | [Solicitation (Updated)] JBR032 Alaska National Guard Readiness Center |
| Jun 4, 2025 | [Solicitation (Updated)] JBR032 Alaska National Guard Readiness Center |
| Jul 31, 2025 | [Solicitation (Updated)] JBR032 Alaska National Guard Readiness Center |

With GovernmentContracts, you can:
Follow Annual Lead Dust Removal and Cleaning Services - USCG Kodiak Small Arms
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/12/2026
Bid Title: Annex Building UST Removal Re-Bid Category: Construction Services Status: Open Description:
Kodiak Island Borough
Bid Due: 6/16/2026
Request for Proposal 726DVR7531 - Full-Service Grill & Espresso Beverage Concession Business The
State Government of Alaska
Bid Due: 6/16/2026
+ 2026P031 Provide AWWU Expert Financial Services Click here to be added to
City of Anchorage
Bid Due: 6/04/2026