| Location: | Ontario |
|---|---|
| Posted: | Feb 25, 2025 |
| Due: | Mar 24, 2025 |
| Agency: | City of Toronto |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Doc5006610301 |
| Publication URL: | To access bid details, please log in. |
| NOIP (Notice of Intended Procurement) Type: | Notice of Intended Procurement |
| Posting Title: | Sanitary Forcemain Replacement Group 2 – Phase 2B |
| High Level Category: | Construction Services |
| Document Type: | RFT |
| Document Number: | Doc5006610301 |
| Ariba Discovery Posting Link: | https://discovery.ariba.com/rfx/22527102 |
| Publish Date: |
February 25, 2025 at 12:00 Noon |
| Issue Date: | February 24, 2025 |
| Submission Deadline: | March 24, 2025 at 12:00 Noon |
| Solicitation Document Description: |
This contract includes Work at three (3) Sewage Pumping Stations (SPS) including forcemain works in the City of Toronto, namely, Fallingbrook SPS, Greyabbey SPS, and Humber SPS. There are following Works, in general, to be performed at these SPS:
Fallingbrook SPS forcemain: • Approximately 105m of 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Fallingbrook Crescent, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Greyabbey SPS forcemain: • Approximately 310m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from 150m south of Fordover drive to 100m west of Fintona avenue. • Replacement of the existing discharge Maintenance Hole, and • Processing, Structural, Electrical, Mechanical, and Instrumentation Work inside the Pumping Station. Humber SPS forcemain: • Approximately 223m of twin 150mm diameter High Density Polyethylene (HDPE) sanitary forcemain replacement from the sewage pumping station to the existing Maintenance Hole at Brule Terrace, and • Replacement of the existing discharge Maintenance Hole. Additionally, this contract also includes in general: A pre-construction survey of all properties and CCTV inspection of existing sewers and maintenance holes prior to commencement of the Work, installation of new and/or removal of existing chambers, temporary bypassing of the SPS during the Work, testing and commissioning of the installed forcemains, and Permanent Restoration. |
| Applicable Trade Agreement: |
Chapter 19 of Comprehensive Economic and Trade Agreement (CETA)
Chapter 5 of Canada Free Trade Agreement (CFTA) Chapter 9 Trade and Cooperation Agreement between Ontario and Quebec (OQTCA) |
| Pre-Bid Meeting: | The optional site meeting will start at 10:00 AM local time on March 5, 2025, at Humber SPS (at #490 Riverside Drive, York) followed by at Fallingbrook SPS (at #7 Fallingbrook Drive, Scarborough) followed by at Greyabbey SPS (at #144 Greyabbey Trail, Scarborough). |
| Electronic Submissions to be Received: | Via City's Online Procurement |
| Division: | Toronto Water |
| Buyer Name: | Christine Sze-Louie |
| Buyer Email: | Christine.Sze-Louie@toronto.ca |
| Buyer Phone Number: | 4163920627 |