Purchase of 108-inch Slide Gates for the Lanier Filter Plant

Location: Georgia
Posted: Apr 27, 2026
Due: May 1, 2026
Agency: Gwinnett County
Type of Government: State & Local
Category:
  • 30 - Mechanical Power Transmission Equipment
  • 46 - Water Purification and Sewage Treatment Equipment
  • 56 - Construction and Building Materials
Solicitation No: BL044-26 INV
Publication URL: To access bid details, please log in.
  • BL044-26 INV

    Purchase of 108-inch Slide Gates for the Lanier Filter Plant

    Buyer Contact : Anna.West@GwinnettCounty.com

    Opening Date : 05/01/2026 03:00 PM EST

    Virtual Bid Opening

    Addendum : BL044-26 ADD4 , BL044-26 ADD2 , BL044-26 ADD 01 , BL044-26 ADD3

  • Attachment Preview

    BL044-26
    PAGE 1
    February 9, 2026
    INVITATION TO BID
    BL044-26
    The Gwinnett County Board of Commissioners is soliciting competitive sealed bids from qualified
    suppliers for the Purchase of 108-inch Slide Gates for the Lanier Filter Plant.
    Bid Submittal Date and Location:
    Bids should be typed or submitted in ink and returned in a sealed container marked on the outside
    with the BL# and Company Name. Sealed Bids will be received until 2:50 P.M. local time on April
    22, 2026, at the Gwinnett County Financial Services - Purchasing Division – 4th Floor Charlotte J.
    Nash Building, 75 Langley Drive, Lawrenceville, Georgia 30046. NOTE THAT THE PURCHASING
    DIVISION HAS TEMPORARILY RELOCATED. ALL BIDS MUST BE SUBMITTED AT THIS LOCATION.
    Any bid received after this date and time will not be accepted. Bids will be publicly opened and read
    at 3:00 P.M. The bid opening will be virtual ONLY. To access the bid opening virtually, visit the
    following link
    https://gwinnettgov.webex.com/gwinnettgov/j.php?MTID=mc697592cf9527509cef259e80be92f46
    or dial 1-408-418-9388, and enter Conference ID 2333 019 2099. Apparent bid results will be
    available the following business day on our website www.GwinnettCounty.com.
    Pre-Bid Substitutions:
    Submit requests to include products of Manufacturer’s not listed as approved Manufacturers in Section
    01 3300 “Submittal Procedures” to Purchasing no later than 3:00PM, February 26, 2026. Provide all the
    information required for a substitution including but not limited to technical data sheets, proof of valves
    performance in wastewater treatment environment, and any other documentation to show equivalence.
    Gwinnett County Purchasing will issue Addenda as appropriate if any of the proposed substitutions to
    the Manufacturer’s list are accepted or denied. A Bid submitted with manufacturers not included in the
    manufacturers list, except as modified by Addenda, will be considered nonresponsive.
    Instruction on Submitting Questions:
    Questions regarding bids should be directed to Anna West, Purchasing Associate II, at
    Anna.West@GwinnettCounty.com or by calling 770-822-7862, no later than 3:00 P.M. on April 3, 2026.
    Bids are legal and binding upon the vendor when submitted. All bids should be submitted in duplicate.
    Successful contractors will be required to meet insurance requirements. The Insurance Company
    should be authorized to do business in Georgia by the Georgia Insurance Department and must have an
    A.M. Best rating of A-7 or higher.
    Gwinnett County does not discriminate on the basis of disability in the admission or access to its
    programs or activities. Any requests for reasonable accommodations required by individuals to fully
    participate in any open meeting, program or activity of Gwinnett County Government should be directed
    to the ADA Coordinator at the Gwinnett County Justice and Administration Center, 770-822-8165.
    BL044-26
    PAGE 2
    The written bid documents supersede any verbal or written prior communications between the parties.
    Award will be made to the contractor(s) submitting the lowest responsive and responsible bid.
    Gwinnett County reserves the right to reject any or all bids to waive technicalities and to make an award
    deemed in its best interest. Bids may be split or awarded in entirety. Gwinnett County reserves the
    option to negotiate terms, conditions and pricing with the lowest responsive, responsible vendor(s) at
    its discretion.
    Award notification will be posted after award on the County website, www.GwinnettCounty.com and
    companies submitting a bid will be notified via email.
    We look forward to your bid and appreciate your interest in Gwinnett County.
    Anna West
    Purchasing Associate II
    The following pages should be returned in duplicate as your bid:
    Bid Schedule, Pages 6-8
    References, Page 9
    Contractor Affidavit and Agreement, Page 10
    Code of Ethics, Page 11
    BL044-26
    PAGE 3
    The intent of this solicitation is to procure four (4) replacement 108-inch slide gates for the Clearwell junction box,
    flow diversion structure, and overflow structure at the Lanier Filter Plant (LFP).
    The Department of Water Resources (DWR) has been experiencing issues with several large 108” slide gates in the
    finished water storage system at LFP that do not sufficiently seal when closed. This has resulted in an inability to
    isolate several major pieces of equipment for operational and maintenance purposes. DWR has performed an
    assessment of the existing equipment and identified the following slide gates as needing replacement:
    Clearwell Junction Box –The Clearwell junction box has one 108” Rodney Hunt slide gate on the header
    leading to Clearwells No. 1 and No. 2 and is used to divert finished water to the different clearwells.
    Flow Diversion Structure – Two HydroGate 108” slide gates, one on the line leading to the Clearwell junction
    box and one on the line leading to Clearwell No. 5.
    Overflow Structure – One HydroGate 108” slide gate on the line leading from Clearwell No. 5.
    The gates will be installed by a contractor yet to be determined.
    SCOPE:
    1. The replacement gates should meet the AWWA standards and design criteria and be able to be installed in the
    locations of the existing gates after they have been removed with minimal structural or anchor bolt
    modifications and minimal modifications to the existing operators. Acceptable manufacturers are:
    Rodney Hunt Co.
    H. Fontaine, Ltd.
    HydroGate Corp.
    Waterman.
    BNW Zero-Leakage.
    Or Pre-Approved Equal.
    2. The following gates are to be procured:
    a.
    One 108” slide gate on the Clearwell junction box.
    b.
    Two 108” slide gates on the flow diversion structure.
    c.
    One 108” slide gate on the overflow structure.
    3. The replacement gates should be operated by the existing electrical operators.
    4. Drawings showing the location of the gates and the installation details are provided in Attachment 1.
    5. The gate manufacturer should design the gates, frames, seals, supports and stems to withstand the full water
    pressure on either side of the gate when only one side is drained.
    6. The gate manufacturer should review and confirm that the existing anchor bolts can be reused. The new
    stems (diameter, thread and pitch) should be compatible with the existing actuators and existing stems can
    be attached to the replacement gates.
    BL044-26
    PAGE 4
    7. The gate manufacturer should provide confirmation that the existing gate and stem support arrangements
    have been checked and are adequate for installation of the replacement gates and can be operated using the
    existing electrical operators without having to move them.
    8. Replacement gates should not exceed the allowable leakage as per AWWA C560.
    9. Shop drawings showing locations and details of anchor bolts should be provided.
    10. The gate manufacturer should provide all support/bracing elements and materials necessary for the proper
    installation, support and performance of the gates with exception of the anchor bolts. Any new anchor bolts
    should be supplied and installed by the installation contractor in accordance with the gate and anchor
    manufacturers’ requirements.
    11. If required, the Owner may be able to facilitate a post bid inspection to enable the manufacturer to undertake
    any onsite measurements necessary for the design and support of the replacement gates prior to preparing
    the shop drawings. Note that access into the facility vaults/structures are considered as confined spaces.
    Manufacturers will be required to provide appropriate PPE for their staff. Confined space access and
    monitoring equipment will be provided by the Owner.
    12. Drawings of the facilities, existing gate locations and gates shop drawings are provided in Attachments 1, 2
    and 3 to assist the equipment manufacturer in assessing the design and installation requirements of
    replacement gates to suit existing conditions.
    Bids are requested for the following:
    1. Supply of all information requested on this bid.
    2. Complete design of replacement gates, frames, stems (as applicable), supports and any minor modifications
    to enable installation after removal of the existing gates.
    3. Manufacture and assembly of gates and components.
    4. Submission of specified submittals for approval prior to commencing manufacture.
    5. Provide a manufacturing and delivery schedule and provide monthly progress updates.
    6. Coordination and delivery to Lanier Filter Plant, 2590 South Water Works Road, Buford, GA 30518.
    7. Site visit to confirm any measurements prior to preparation of the shop drawings.
    8. Assessment of the existing anchor bolt and stem mounting arrangements to confirm they are adequate for the
    replacement equipment. If in the opinion of the manufacturer the existing anchors and support are not
    considered acceptable, design of any modifications, and provision of materials (except the anchor bolts)
    necessary for the modifications. Replacement anchor bolts should be located at least 6” away for the existing
    bolts. Any replacement anchors should be supplied and installed by the installation contractor.
    BL044-26
    PAGE 5
    9. Provide start up assistance to the installation contractor (not yet appointed).
    10. Provision of Manufacturer’s Warranty.
    11. Provision of two hard copies and one electronic copy (in searchable PDF format) of Operating and
    Maintenance instructions for all components, including shop drawings of equipment, spare parts list,
    preventative maintenance schedule, and troubleshooting information.
    12. Supply of specified spare parts and special tools for future maintenance.
    Drawings and photographs of the various facilities are provided in the Attachments and the following specifications
    are applicable:
    SPECIFICATIONS:
    Equipment shall comply with the following specifications:
    Section 01 43 33 – Manufacturer’s Field Services
    Section 01 78 23 – Operation and Maintenance Data
    Section 01 88 15 – Anchorage and Bracing
    Section 01 91 14 – Equipment Testing and Facility Startup
    Section 05 05 19 – Post-Installed Anchors
    Section 35 20 16.26 – Cast Iron Slide Gates
    ATTACHMENTS
    Attachment 1: Drawings
    Attachment 2: Existing Gate Schedule and Drawings
    Attachment 3: Photographs of Existing Installation
    The following information sheets should be submitted with the bid:
    1. Make, model, and weight of each component.
    2. Manufacturer’s catalog information, descriptive literature, specifications, and materials of construction.
    3. Complete description of gates, frames, stems, gaskets and other ancillary items.
    4. Plan and section views of the gates, anchor bolt locations and dimensional tolerances required for installation.
    5. A complete listing of materials for each gate component.
    6. Drawings of each gate size.
    7. Confirmation that the design will enable the gates to withstand and seal with water on one side only.
    8. Typical anchor bolt mounting details.
    9. Manufacturer Certificate of Compliance with materials specifications should be submitted prior to shipment of the
    equipment. The certificate should certify that materials, manufacture, and final product conforms to or exceeds specified
    requirements and intent for which the product will be used. Submit supporting reference data, affidavits, and certificates
    as appropriate. The certificate may reflect recent or previous test results on material or product, acceptable to the
    Engineer.
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...Pre-Advertisement Notice for On-Call Gate Operator Atlanta, City Of May 27, 2026 @ ...

    State Government of Georgia

    Bid Due: 6/18/2026

    ...Valves, Steel: Angle, Check, Gate, Globe, etc. 67081 Valves, Stainless Steel: Angle, Ball, ...

    State Government of Georgia

    Bid Due: 6/09/2026

    ...: replacement of gates and valves and their associated actuators; electrical, instrumentation, and ...

    Cobb County

    Bid Due: 6/11/2026

    ...to the commercial gate a minimum of 30 minutes prior to the application ...

    HOMELAND SECURITY, DEPARTMENT OF

    Bid Due: 7/01/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.