Procurement #: 54501
CITY OF PROVIDENCE, RHODE ISLAND
Department: Public Property
RFP Title: Classical High School Campus Electrical Upgrades
Opening Date: 19 Oct 2026
Addendum #: 2
Issuing Date: 25 Sep 2026
The purpose of this addendum is: Provide updates see attachment.
Providence City Hall
25 Dorrance Street
Providence, RI 02903
| 1 |
42 Weybosset Street | Suite 403 | Providence, RI 02903
Phone 401.648.0884 | Fax 401.331.0923 | studiojaed.com
Addendum #2 Addendum Date: September 24, 2026
Project: Classical High School 770 Westminster St., Providence, RI 02903
Campus Electrical Upgrades
The work herein shall be considered part of the bid documents for the referenced project and carried
out in accordance with the following supplemental instructions issued in accordance with the Contract
Documents without change in Contract Sum or Contract Time. Acknowledge receipt of addendum on
the bid form as indicated.
Clarifications:
1. See attached Pre-bid Agenda.
2. See attached Pre-bid Sign-in Sheet.
3. Additional scope of work will include hazardous material abatement. See attached Asbestos
Removal Specification.
4. Additional scope of work will include Power Conditioning and additional Switchgear. See
attached drawings and single line.
5. Preliminary Phasing Duration - 16 to 23 weeks total (Some activities may be concurrent).
See breakdown below of activities and durations:
a. Underground distribution at 3 locations (2 Transformers, 1 Manhole Switch)
i. 3 to 4 weeks
b. Abatement in Building 1 to facilitate new Power Conditioning equipment
i. 3 to 4 weeks
c. 2 Transformers and 1 Manhole Switch preparation
i. 1 to 2 weeks
d. Install new Power Conditioning equipment in Building 1
i. 1 week
e. Install new 480V switchgear in Building 2
i. 1 to 2 weeks
f. Distribute wire and conduit to existing 208V switchgear (That is being replaced) in
Building 2
i. 1 to 2 weeks
g. Building 1 coordinate switch over and install splice box at existing exterior pad
mounted transformer location. INVOLVES BUILDING SHUTDOWN.
i. 1 to 2 weeks
h. Building 2 coordinate switch over and energize new 480V Switchgear
i. 1 to 2 weeks
1
| 2 |
42 Weybosset Street | Suite 403 | Providence, RI 02903
Phone 401.648.0884 | Fax 401.331.0923 | studiojaed.com
i. Building 2 Demolish existing 208V Switchgear and Install new 208V Switchgear.
INVOLVES BUILDING SHUTDOWN.
i. 1 to 2 weeks
j. Install new 480V feed from Building 2 to new indoor dry type transformer and new
208V switchgear inside Building H. Refeed existing subpanels. INVOLVES BUILDING
SHUTDOWN.
i. 1 to 2 weeks
6. The above activities do not represent the entire scope of work. Contractors to provide a
detailed phasing schedule.
7. At this time, temporary power is not required for building shutdowns.
8. Contractor is responsible to replace and / or restore hardscape, concrete paving, asphalt
paving, and landscape to match existing conditions at all areas of trenching and backfill.
9. Contractors to avoid drilling into 1x1 ceiling tiles.
10. Contractor to assume all thermal piping insulation as positive until told otherwise.
11. Contractor to include an allowance of $10,000 for unforeseen conditions.
Changes to Drawings:
General
1. Drawing G-000
a. Added the new sheets to the sheet index.
Electrical
1. Drawing E-101
a. Identified additional scope in Building H.
2. Drawing E-102
a. Moved enlarged plans associated with Building 2 to sheet E-103.
b. Added a demolition plan of the basement of Building 1.
c. Added a DVR and a new 1200A panel PH1 to the new plan of the basement of
Building 1.
3. Drawing E-103
a. Added this sheet.
b. Moved enlarged plans of Building 2 to this sheet from E-102.
c. Added Building H demolition and construction plans.
d. Added pullbox locations to Building 2 plans.
e. New housekeeping pad added.
f. Added new Distribution Section to (N) SWBD-1.
4. Drawing E-502
a. Added the housekeeping pad detail.
5. Drawing ED601
2
| 3 |
42 Weybosset Street | Suite 403 | Providence, RI 02903
Phone 401.648.0884 | Fax 401.331.0923 | studiojaed.com
a. Added this sheet.
b. Added the demolition of (2) 600A breakers from the main switchboard. Added to
remove the associated feeders for extension and reconnection to the new 1200A
panel.
6. Drawing E-601
a. Revised the feeder on the primary side of the utility transformer to clarify that
conduit is by contractor and HV cabling is by RIEnergy.
b. Added a DVR (dynamic voltage restorer). Added a 1200A breaker and hardware kit
to the main switchboard. Added a feeder from the 1200A breaker to the DVR and
from the DVR to a new 1200A panel. Added feeder extensions to reconnect panels
PH3A1 and PH3B1 from the switchboard to the new 1200A panel.
c. Moved the active harmonic filter from the existing switchboard to the new 1200A
panel.
7. Drawing E-602
a. Deleted the new splice box from the single line. (New switchgear manhole is still
required, see site plan)
b. Revised the feeder on the primary side of the utility transformer to clarify that
conduit is by contractor and HV cabling is by RIEnergy.
c. Additional LEM3000 Meter identified to support Building H.
8. Drawing SK.E-602
a. Added Building H Single Line Diagram
END
3
September 8, 2026
Classical Electrical Pre-Bid Meeting Agenda
1. Introductions
2. This is a mandatory pre-bid meeting
a. Access to Bidding Documents - Any questions, comments or concerns.
b. City of Providence - BidNet,
c. City of Providence - Purchasing Department
3. Scope of Work
The Classical High School Campus Electrical Upgrades project generally consists of upgrading the
existing electrical service and power distribution systems serving Classical High School Buildings 1
and 2. The intent is to provide new electrical service and distribution infrastructure while maintaining
operation of the occupied school to the greatest extent practical.
The general scope of work includes:
* Selective demolition and removal of existing electrical service equipment, transformers,
feeders, concrete pads, and associated components as indicated.
* Coordination with Rhode Island Energy for new utility services, pad-mounted transformers,
metering, primary connections, and required utility work.
* Installation of new underground electrical infrastructure, including duct banks, conduits,
manholes, splice boxes, concrete equipment pads, and bollards.
* Installation of new main switchboards, distribution equipment, transformers, breakers,
panelboards, metering, surge protection, and power conditioners as indicated on the
drawings.
* Modification and reconnection of existing feeders and electrical loads to the new distribution
systems, including integration with existing emergency and standby power systems where
indicated.
* New grounding and bonding, raceways, conductors, equipment identification, and
associated electrical accessories required for complete and operational systems.
* Required short-circuit, protective device coordination, and arc-flash studies, along with
equipment settings, testing, commissioning, and labeling.
* Associated site and general construction work, including excavation, trenching, backfill,
concrete, asphalt and sidewalk restoration, fencing modifications, patching, and restoration
of disturbed areas.
* Maintain building access, emergency egress, existing utilities, and electrical service to
occupied portions of the campus throughout construction. Shutdowns shall be minimized
and carefully coordinated with the Owner and Rhode Island Energy.
Pre-Bid Meeting
Page 1 of 2
* Provide all labor, materials, equipment, permits, temporary services, coordination, testing,
restoration, and incidental work necessary for a complete and fully operational installation in
accordance with the Contract Documents.
4. Questions during bidding are to be emailed to:
a. Philip Conte, StudioJAED contep@studiojaed.com
b. Ben Shaffer, StudioJAED shafferb@studiojaed.com
c. Paul DeMelo, Downes Construction, OPM pdemelo@downesco.com
d. Questions Due - September 15, 2026 at 4:00PM
e. Final Addendum - September 17, 2026 at 4:00PM
5. Procedures for additional site visits, who/how?
6. Schedule
a. Contractor work to start - on or about June 15, 2027 (Dependent upon lead times and
RIE Transformer delivery and coordination)
b. Substantial Completion - on or about August 15, 2027 2027 (Dependent upon lead times
and RIE Transformer delivery and coordination)
c. The Contractor is responsible for manning the job accordingly, including, but not limited to,
overtime, second shift work, and weekend work, to meet this completion date at no
additional cost to the Owner and with minimum disruptions to PPSD.
7. Lay Down Area, Security and Occupancy
a. The laydown and contractor area will be reviewed on site with the awarded Contractor.
b. This is an occupied school campus, and the work will require significant coordination of
electrical shutdowns, utility work, site access, sequencing, and potentially off-hours work.
Contractors should familiarize themselves with existing conditions and account for all
required phasing, temporary conditions, and restoration in their bids.
c. The building will be occupied. The contractor is responsible for coordinating with the City
and Administration on a daily basis. Contractor to provide all measures for site temporary
barriers, pedestrian and vehicular control, and safe occupant passage for the project
duration.
END
Pre-Bid Meeting
Page 2 of 2
e m e r y
Environmental Associates
PO Box - E * Pawtucket, RI * Office (401)-727-4941 *
Email: emeryenvironmental@icloud.com
ASBESTOS REMOVAL SPECIFICATION
ELECTRIC TRANSFORMER
REPLACEMENT PROJECT
PROJECT SITE:
CLASSICAL HIGH SCHOOL
770 WESTMINSTER STREET
PROVIDENCE, RI 02903
CLIENT:
STUDIO JAED ARCHITECTS
42 WEYBOSSET STREET; UNIT #403
PROVIDENCE, RI 02903
SPECIFICATION PREPARED BY:
MR. PATRICK A. EMERY
EMERY ENVIRONMENTAL ASSOCIATES
P.O. BOX - E
PAWTUCKET, RI 02861
DATE: 9.15.2026
PATRICK A. EMERY
RIDOH: ASB. PROJECT DESIGNER - APD0505
EEA PROJECT #: 260921-A
Environmental Consulting and Mitigation Contractors
Lead Paint * Asbestos * Mold * Indoor Air Quality
e m e r y
Environmental Associates
TABLE OF CONTENTS
APPENDIX - A: ASBESTOS ABATEMENT SPECIFICATION /
RIDOH ASB-16, ASB-16A & ASB-16B ASBESTOS
ABATEMENT APPLICATION FORMS
APPENDIX - B: ANALYTICAL SAMPLE RESULTS
APPENDIX - C: ASBESTOS CONSULTANT LICENSURE
APPENDIX - D: ASBESTOS TESTING LABORATORY LICENSURE
APPENDIX - E: ASBESTOS PROJECT DRAWING(S)
Environmental Consulting and Mitigation Contractors
Lead Paint * Asbestos * Mold * Indoor Air Quality
e m e r y
Environmental Associates
APPENDIX - A:
ASBESTOS ABATEMENT SPECIFICATION /
RIDOH ASB-16, ASB-16A & ASB-16B ASBESTOS
ABATEMENT APPLICATION FORMS
Environmental Consulting and Mitigation Contractors
Lead Paint * Asbestos * Mold * Indoor Air Quality

With GovernmentContracts, you can:
OET27007085 |MPA 388 Emergency Management and Homeland Security Services MPA 388 Open Enrollment
State Government of Rhode Island
Bid Due: 1/31/2029
Info Opening Time Solicitation Number Status Bid Title Posting Group Posting Entity Contact
State Government of Rhode Island
Bid Due: 11/17/2026
OEV27007095 |MPA 603 LITERACY AND DYSLEXIA ENDORSEMENT PROVIDERS The Rhode Island Department of
State Government of Rhode Island
Bid Due: 2/29/2028
Dental Lab At Juanita Sanchez Educational ComplexA BOARD OF CONTRACT AND SUPPLY CITY
City of Providence
Bid Due: 11/16/2026