| Location: | Washington |
|---|---|
| Posted: | Feb 15, 2026 |
| Due: | Mar 4, 2026 |
| Agency: | City of Seattle |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PW#2023-063 |
| Publication URL: | To access bid details, please log in. |
Project ID: PW#2023-063
Title: A.B. Ernst Park Addition
Addenda: 0
Release Date: 2/11/2026
Due Date: 3/4/2026
Project Description: Park addition project incorporating new play area features and revising existing paving to provide an accessible entrance to the Seattle Public Library. Project includes tree vegetation and soil protection; demolition of existing pavement and walls; clearing and grubbing of site; tree removal; site regrading; removal, protection and replacement of existing artwork. Removal and haul of contaminated rubble, vegetation and soil, loading onto trucks or bins to an approved Waste Management facility, truck and bin availability to be coordinated by contractor, soil disposal by others. Import fill; accessible concrete paving; cast-in-place concrete curbs and walls; installation of new play equipment and surfacing; handrails; plantings and site furnishings. New trees, shrubs and vegetation; new storm and irrigation utilities, connections, and appurtenances. This project includes one alternate and two additives: Alternate 1 – Play Pavement Band, Additive 1 – Second Café Table, and Additive 2 – Second Trash and Recycling.
Engineer's Estimate: Base Estimate: $760,000.00, Alternate#1: $1,331.00, Additive#1: $3,651.00, Additive#2: $1,956.00.
Project Location: 723 N 35th St, Seattle, WA 98103

With GovernmentContracts, you can: