| Location: | South Carolina |
|---|---|
| Posted: | Feb 15, 2026 |
| Due: | Mar 12, 2026 |
| Agency: | Greer city |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Stormwater Improvements
Addenda: 0
Release Date: 2/15/2026
Due Date: 3/12/2026
The City of Greer is requesting bids for stormwater capital improvement projects at three locations with deteriorating stormwater infrastructure. Construction documents have been developed by Civil and Environmental Consultants (CEC) for the purpose of generating bids for the capital improvements. The following project areas are outlined in the construction documents as areas in need of improvement:
EBBITT CT (Greer, SC): Remove and replace 30 feet of RCP. Install catch basin with relief piping. Replace approx. 500 sqft of pavement.
GLENWILLOW CT (Greer, SC): Demo existing structure and install 90 LF of 24" HDPE, install 3'x3' drop inlet (approx. 15' deep). Headwall + riprap outlet protection.
CAROLINA AVE (Greer, SC): Abandon approx. 375 LF of existing 24 inch storm drain pipe with flowable fill. Install approx, 410 LF of 24" RCP, 42 LF of 15" RCP, and 2 curb inlets. Repair curb, gutter and pavement.

With GovernmentContracts, you can:
Project Name: Heyward Street Waterline Replacement (CIP-2257) Agency/Owner: Beaufort - Jasper Water &
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/04/2026
Project Name: McCormick One Stop Renovations Agency/Owner: Town of McCormick Ad Publish Date:
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
Ad Title: Barnwell County Emergency Debris Removal Purchasing Agent/Entity: Barnwell County Ad Publish
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026
Project: CIP-2257 Heyward Street Waterline Replacement Ref. #: 2027-IFB-001 Type: IFB Status: Open
Beaufort - Jasper Water & Sewer Authority
Bid Due: 8/04/2026