| Location: | Florida |
|---|---|
| Posted: | Feb 15, 2026 |
| Due: | Mar 19, 2026 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQu-26-004 |
| Publication URL: | To access bid details, please log in. |
Project Description: The existing Southwest Water Treatment Plant (WTP), located at 7325 Osceola Polk Line Road, Davenport FL, has a maximum daily flow capacity of 8.64 million gallons per day (MGD). Its current treatment process includes two offsite groundwater wells (SW-1 and SW-2), along with ozone (currently non-operational since 2023), sodium hypochlorite, Ground Storage Tank (GST) for storage, and high service pumps to discharge to the distribution system. A third well (SW-5) has been drilled onsite but is not yet equipped with a pump and associated raw water pipe and remains inactive.
Currently, the plant’s reliable capacity is insufficient to meet demand when one well is offline. Additionally, water from well SW-2 contains elevated levels of hydrogen sulfide (H₂S), which requires treatment.
To enhance performance, reliability, and water quality, the proposed upgrades will:
• Install a forced draft aeration system for H₂S removal with associated odor control system
• Construct a transfer pump station to convey treated water to the existing ground storage tank
• Implement stormwater and yard piping and valves improvements
• Construct a lift station and associated piping to the existing force main
• Associated site work, electrical, and instrumentation and controls
The scope of the project is to provide Construction Management at Risk (CMAR) pre-construction and construction services for the upgrades of Southwest WTP and treatment improvements project. The scope of work also includes early procurement of the forced draft aeration, odor control system, and possibly other equipment with long lead time.

With GovernmentContracts, you can:
...Groundwater pollution drainage services Contact Information Name Sara Medina Email smedina...
State Government of Florida
Bid Due: 10/01/2026
..., groundwater quantity and quality, and regulatory coordination with state and regional agencies. ...
City of Port St. Lucie
Bid Due: 10/07/2026
...-780. * Conduct soil, groundwater, sediment, surface water, and air investigations... dust from ...
JEA
Bid Due: 10/06/2026
...soils and groundwater, specifically in areas impacted by Aqueous Film Forming Foam (AFFF). ...
DEPT OF DEFENSE
Bid Due: 9/28/2026