Southwest Water Treatment Plant Upgrades and Treatment Improvement

Location: Florida
Posted: Feb 15, 2026
Due: Mar 19, 2026
Agency: Toho Water Authority
Type of Government: State & Local
Category:
  • 68 - Chemicals and Chemical Products
  • Y - Construction of Structures and Facilities
Solicitation No: RFQu-26-004
Publication URL: To access bid details, please log in.
Project: Southwest Water Treatment Plant Upgrades and Treatment Improvement
Ref. #: RFQu-26-004
Type: RFSQ
Status:
Open
Open Date: Feb 15th 2026, 8:00 AM EST
Questions Due Date: Feb 27th 2026, 5:00 PM EST
Close Date: Mar 19th 2026, 2:00 PM EDT

Project Description: The existing Southwest Water Treatment Plant (WTP), located at 7325 Osceola Polk Line Road, Davenport FL, has a maximum daily flow capacity of 8.64 million gallons per day (MGD). Its current treatment process includes two offsite groundwater wells (SW-1 and SW-2), along with ozone (currently non-operational since 2023), sodium hypochlorite, Ground Storage Tank (GST) for storage, and high service pumps to discharge to the distribution system. A third well (SW-5) has been drilled onsite but is not yet equipped with a pump and associated raw water pipe and remains inactive.
Currently, the plant’s reliable capacity is insufficient to meet demand when one well is offline. Additionally, water from well SW-2 contains elevated levels of hydrogen sulfide (H₂S), which requires treatment.
To enhance performance, reliability, and water quality, the proposed upgrades will:
• Install a forced draft aeration system for H₂S removal with associated odor control system
• Construct a transfer pump station to convey treated water to the existing ground storage tank
• Implement stormwater and yard piping and valves improvements
• Construct a lift station and associated piping to the existing force main
• Associated site work, electrical, and instrumentation and controls
The scope of the project is to provide Construction Management at Risk (CMAR) pre-construction and construction services for the upgrades of Southwest WTP and treatment improvements project. The scope of work also includes early procurement of the forced draft aeration, odor control system, and possibly other equipment with long lead time.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...SERVICES 991-387-000-0000 HAZARDOUS MATERIALS STORAGE TANKS, REMOVAL, REPLACEMENT, & ENVIROMENTAL... ASSESSEMENT, ABATEMENT, REMOVAL ...

State Government of Florida

Bid Due: 10/11/2040

...RESTORATION SERVICES 991-387-000-0000 HAZARDOUS MATERIALS STORAGE TANKS, REMOVAL, REPLACEMENT, & ENVIROMENTAL... ASSESSEMENT, ABATEMENT, ...

State Government of Florida

Bid Due: 10/11/2040

...991-387-000-0000 HAZARDOUS MATERIALS STORAGE TANKS, REMOVAL, REPLACEMENT, & ENVIROMENTAL MITIGATION..., ABATEMENT, REMOVAL AND ...

State Government of Florida

Bid Due: 10/11/2040

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.