Issue Date
August 31, 2026
Jefferson County Emergency Management
Request for Proposals (RFP)
Proposal Deadline
September 14, 2026
Anticipated Contract Start Date
September 21, 2026
Maximum Contract Amount
$60,000
Project Completion Deadline
January 31, 2028
Contact: Tracy Hameau, Emergency Management Director
Jefferson County Emergency Management
thameau@jeffersoncountywi.gov
Jefferson County Emergency Management is soliciting proposals from qualified consultants to
develop a Jefferson County Flood Mitigation Master Plan.
The Master Plan will provide Jefferson County with a clear, countywide framework for
documenting and managing flood mitigation and buyout-related parcels the County previously
acquired. Through the Master Plan process, the consultant will evaluate flooding countywide,
identifying high-risk areas, and determining where mitigation or resilience measures are needed
including opportunities for hydrologic restoration. The consultant will compile available
information on parcels, acquisitions, grants, costs, deeds, and property status; prepare mapping
products; identify areas with recurring flood impacts; and assess relevant flood risk, drainage,
watershed, and hydrologic conditions.
Using this information, the consultant will identify and prioritize planning-level flood mitigation
opportunities and recommend future projects or project types intended to reduce flood risk and
recurring flood damage. Recommendations may include structural, non-structural, nature-based,
restoration, drainage, storage, acquisition, or open-space approaches, as appropriate.
This project is funded through the Wisconsin Emergency Management Pre-Disaster Flood
Resilience Grant (PDFRG). The scope is limited to assessment, planning, prioritization, and project
scoping activities. This project does not include final engineering design, permitting, or
construction.
Project Goals
The Flood Mitigation Master Plan shall:
• Review flood mitigation or buyout-related parcels already purchased by Jefferson County
• Create maps showing the location of County-owned flood mitigation parcels by
municipality and as a whole across Jefferson County
• Identify high-risk watersheds and sub-catchments contributing to repetitive funding
• Review watershed, drainage, and hydrologic conditions that contribute to flooding
• Identify the causes of recurring flooding, where feasible
• Assess and develop projects to reduce flood risk. These could include hydrologic
restoration opportunities, such as wetland enhancement, streambank stabilization, and
flow improvements to reduce impacts.
• Prioritize the important flood mitigation locations and projects to be focused on
• Identify potential future funding sources for recommended projects, including the
Assessment Grant in 2027
• Support Jefferson County’s hazard mitigation planning efforts
• Provide data and documentation to add to Jefferson County’s Hazard Mitigation Plan
• Assist County with engaging stakeholders, including county departments and local
municipalities, to validate findings and identify potential mitigation options
Scope of Work
The selected consultant shall provide the staff, expertise, analysis, and planning services
necessary to complete the Flood Mitigation Master Plan.
Project Management
The consultant shall:
• Meet and coordinate with the Jefferson County Emergency Management Director; and if
needed, with the project team(including Directors of Emergency Management, Planning
and Development Department, Parks Department, and Land and Water Conservation
Department) at the beginning of the project and throughout the planning process
• Prepare a work plan and project schedule
• Provide monthly progress updates to the Jefferson County Emergency Management
Director
• Complete all work prior to January 31, 2028
Parcel Inventory and Records Review
The consultant shall:
• Review available County records for flood mitigation and buyout-related parcels and
• Review available grant files, deeds, purchase costs, parcel records, maps, and acquisition
documentation
• Review the County’s inventory of flood mitigation parcels and recommend any changes
or updates
• Identify missing, incomplete, duplicate, or inconsistent records
• Prepare a summary of available records and records that need follow-up
Flood Risk and Watershed Review
The consultant shall:
• Identify recurring flood problem areas throughout Jefferson County
• Review historical flood information and available flood damage records
• Assess flood risks at a planning level
• Identify watersheds, drainage areas, and locations contributing to repeated flooding
• Review likely causes of flooding, such as inadequate drainage, culvert limitations, river
overflow, erosion, or degraded hydrology
• The assessment will use HEC-HMS and HEC-RAS models calibrated with historical flood
data, stream gauges, and LiDAR topography to simulate watershed hydrology and
floodplain processes.
Mitigation Project Recommendations
The consultant shall:
• Develop planning-level mitigation project concepts for recurring flood problem areas
• Identify the priority locations for future mitigation work
• Consider structural, non-structural, and nature-based solutions
• Consider floodplain restoration, wetland restoration, drainage improvements, culvert
improvements, flood storage, acquisition, and open-space strategies where appropriate
• Provide planning-level cost estimate ranges for recommended projects, where feasible
• Prioritize projects based on flood risk, likely benefit, feasibility, watershed value, and
future funding potential
• Identify a strategy for the County to determine how to prioritize acquisition of any future
flood-impacted properties
• Identify parcels with a high recreation value and provide strategies to enhance their use
while still ensuring flood mitigation practices
• Identify priority mitigation locations based on discussions and policy direction from the
County
• Identify potential restoration areas, flood storage areas, priority open space areas, and
opportunity areas for future acquisitions and projects
• Identify opportunities to reduce flooding through drainage improvements, restoration,
flood storage, open space, acquisition, or other appropriate strategies
Stakeholder Engagement
Implementation Roadmap
The consultant shall prepare an implementation roadmap that includes:
• Recommended mitigation projects
• Priority ranking of projects or locations
• Recommended next steps for Jefferson County
• Planning-level cost estimate ranges, where feasible
• Funding opportunities for strategy recommendation implementation
• Partnership opportunities for strategy recommendation implementation
• Information showing how recommendations support Jefferson County’s hazard
mitigation planning efforts
Required Deliverables
In its final plan, the consultant shall provide the following:
Deliverable
Description
Project Work Plan
Project schedule, milestones, data needs, and
communication plan
Records Review Summary
Summary of available parcel, grant, deed, acquisition, and
related records; identifies data gaps
Parcel Inventory
Inventory of Jefferson County flood mitigation or buyout-
related parcels (County to provide)
Parcel Detail Summaries
Parcel-specific information, including available acquisition,
grant, cost, deed, and status information (County to
provide)
Deliverable
Description
Parcel Maps
Maps showing the location of County-owned flood
mitigation or buyout-related parcels (County to provide)
Flood Risk Assessment
Assessment of recurring flood areas, affected assets, and
contributing watersheds
Hydrologic and Watershed
Review
Summary of drainage, watershed conditions, root causes,
and restoration opportunities
Flood Problem Area Maps
Maps showing recurring flooding, drainage issues, erosion
areas, and other priority locations
Mitigation Project List
Recommended planning-level projects to reduce flood risk
Priority Project List
Ranked list of high-priority mitigation locations and
projects
Implementation Roadmap
Recommended actions, estimated costs where feasible,
and potential funding pathways
Draft Flood Mitigation Master
Plan
Draft plan for County review
Final Flood Mitigation Master
Plan
Final plan revised in response to County comments
GIS Data and Maps
County-compatible GIS files, map files, data layers,
metadata, and source information
Presentation Materials
Summary materials for County staff or leadership, if
requested
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.