LAKE ELSINORE UNIFIED SCHOOL DISTRICT
ADDENDUM NUMBER ONE
UNIT PRICE GENERAL CONTRACTOR SERVICES
BID NO. 08-25/26
March 13, 2026
General: The following changes, additions and clarifications have been made to the original Bid
Documents for the above referenced project and shall be incorporated into the Bidder’s response. All
project documents provided with, and referenced in, the District’s Bid No. 08-25/26, including contract
documents and specifications (collectively, the “Bid Documents”) shall remain unchanged with the
exception of those elements added, revised, deleted, or clarified by this Addendum. In case of conflict
between the Bid Documents and this Addendum, this Addendum shall govern and shall supersede any
term in the Bid Document that contradicts or otherwise clashes with this Addendum.
All bidders must acknowledge receipt of Addendum Number One on the Bid Form and failure to
do so may subject Bidder to disqualification.
DISTRICT CLARIFICATION:
Instructions To Bidders - Bid Security - Section 2 (Page 6)
Each bid must be accompanied by one of the following forms of bidder’s security: (1) cash; (2) a cashier’s
check made payable to the District; (3) a certified check made payable to the District; or (4) a Bid Bond
in the amount of ten percent (10%) of the estimated yearly general contractor services of $1,000,000.00
(Bid Guarantee Form - Page 26) (Bid Bond Form - Pages 27 - 29).
REVISION TO BID DOCUMENTS:
Contract Duration - Project Information (Page 1) & Notice Inviting Bids (Page 2)
The Initial Contract Term will be one (1) year, with the option to extend two (2) additional one (1) year
terms, upon mutual written agreement. Total Contract Duration not to exceed three (3) years pursuant to
Public Contract Code section 20919.25.
Exhibit A: General Contractor Services Unit Prices (3 Pages)
The District has revised the Unit Price Schedule to include additional general contractor services
necessary to complete projects as specified in the Bid Documents.
Exhibit B: DIR Scope of Work Provisions & Prevailing Wage Rates (99 Pages)
The District has revised Exhibit B to include the additional general contractor services requested.
Attachments: Exhibit A - Revised (3 pages), Exhibit B - Revised (99 pages)
Except as specifically addressed herein, all other original provisions of Bid Documents issued
prior to this Addendum shall remain in effect as written. Addendum No. 01, taken together with
the Bid Documents, represents the entire Bid Package associated with Bid No. 08-25/26.
The District, at its sole discretion, may issue additional addenda as necessary.
END OF ADDENDUM NUMBER ONE
1
GENERAL CONTRACTOR SERVICES UNIT PRICES
1) RATES SHALL INCLUDE SUNDRIES & EQUIPMENT NECESSARY TO PERFORM WORK.
2) ENTIRE RATE SCHEDULE MUST BE FILLED OUT TO BE CONSIDERED FOR THE BID.
3) THE LOWEST BIDDERS WILL DETERMINED BY TOTALING HYPOTHETICALS 1 - 3.
4) MULTIPLE CONTRACTS MAY BE AWARDED BASED ON THE RESULTS OF THIS BID.
5) DISTRICT DOES NOT GUARANTEE A MINIMUM YEARLY CONTRACT AMOUNT.
MINIMUM MOVE-IN CHARGE FOR ANY JOB
$
The “Minimum Move in Charge” shall be used only when the cost to perform a project, based on the unit pricing, is less than the actual cost to
mobilize a team to perform the project. The Minimum Move in Charge is not in addition to the line item pricing but in place of the line item pricing.
You may not charge both.
GENERAL CONTRACTOR SERVICES RATES
ITEM
DESCRIPTION
(DIR CRAFT/CLASSIFICATION)
1
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN -
JOURNEYMAN
2
ELECTRICIAN: INSIDE WIREMAN, TECHNICIAN -
APPRENTICE
3 PAINTER: INDUSTRIAL PAINTER - JOURNEYMAN
PREVAILING
WAGE RATES
$90.66 - $149.93
$35.58 - $94.87
$67.97 - $115.29
HOURLY
RATE
$
$
$
OVERTIME /
SATURDAY
RATE
HOLIDAY /
SUNDAY
RATE
$
$
$
$
$
$
4 PAINTER: INDUSTRIAL PAINTER - APPRENTICE
$35.94 - $65.27 $
$
$
5
PLUMBER: INDUSTRIAL AND GENERAL
PIPEFITTER - JOURNEYMAN
$90.19 - $148.25 $
$
$
6
PLUMBER: INDUSTRIAL AND GENERAL
PIPEFITTER - APPRENTICE
$32.38 - $79.45 $
$
$
7
PLUMBER: LANDSCAPE/IRRIGATION FITTER -
JOURNEYMAN
$72.40 - $115.70 $
$
$
8
PLUMBER: LANDSCAPE/IRRIGATION FITTER -
APPRENTICE
$36.52 - $69.96 $
$
$
9
CARPENTER: CABINET, INSULATION,
HARDWOOD, ACOUSTICAL-JOURNEYMAN
$81.32 - $133.56 $
$
$
10 CARPENTER & RELATED TRADES - APPRENTICE $39.64 - $74.19 $
$
$
11 FENCE BUILDER - JOURNEYMAN
$76.19 - $124.44 $
$
$
12
LABORER: CARPENTRY, CABINET, FENCE &
HARDWOOD FLOOR PROJECTS (GROUP 3)
$76.19 - $123.77 $
$
$
13
DRYWALL INSTALLER / LATHER -
JOURNEYMAN
$81.65 - $133.89 $
$
$
14 DRYWALL INSTALLER - APPRENTICE
$39.20 - $74.52 $
$
$
15
DRYWALL FINISHER: TAPE/TEXTURE -
JOURNEYMAN
$80.82 - $132.15 $
$
$
16
DRYWALL FINISHER: TAPE/TEXTURE -
APPRENTICE
$37.89 - $65.89 $
$
$
17 PLASTERER - JOURNEYMAN
$78.20 - $124.38 $
$
$
18 PLASTERER - APPRENTICE
$39.75 - $73.22 $
$
$
19
LABORER: DRYWALL, INSULATION &
T-BAR PROJECTS (GROUP 1)
$75.09 - $121.57 $
$
$
Bid No. 08-25/26
Page 1
GENERAL CONTRACTOR SERVICES RATES
ITEM
DESCRIPTION
(DIR CRAFT/CLASSIFICATION)
20 BRICKLAYER/BLOCKLAYER - JOURNEYMAN
21 BRICKLAYER/BLOCK LAYER - APPRENTICE
22 CEMENT MASON - JOURNEYMAN
23 CEMENT MASON - APPRENTICE
24 TILE LAYER - JOURNEYMAN
25 TILE LAYER - APPRENTICE
26 CEMENT FINISHER - JOURNEYMAN
27 STONEMASON - JOURNEYMAN
28
LABORER: BRICK/BLOCK, CEMENT, TILE &
STONE PROJECTS (GROUP 4)
HAULING & HEAVY EQUIPMENT SERVICE RATES
ITEM
DESCRIPTION
(DIR CRAFT/CLASSIFICATION)
29 DRIVER: TRUCK - END DUMP/LOW BED
30 DRIVER: TRUCK - TRANSFER/ROLL-OFF
31
OPERATING ENGINEER: BOBCAT OR SIMILAR
(SKID STEER) - GROUP 3
32
OPERATING ENGINEER: SKIPLOADER -
GROUP 2, GROUP 6, GROUP 8
33
OPERATING ENGINEER: BACK HOE -
GROUP 4, GROUP 8, GROUP 10, GROUP 12
SITE PREPARATION SERVICES
ITEM DESCRIPTION
34 BACKFILL AND COMPACTION (90%)
35 MANUAL GRADING
36 TRACTOR GRADING
37 CONCRETE REMOVAL
38 CONCRETE SAW CUTTING
PREVAILING
WAGE RATES
HOURLY
RATE
$74.86 - $122.78 $
OVERTIME /
SATURDAY
RATE
HOLIDAY /
SUNDAY
RATE
$
$
$40.22 - $67.68 $
$
$
$77.53 - $125.23 $
$
$
$36.33 - $72.76 $
$
$
$75.59 - $129.95 $
$
$
$35.84 - $72.33 $
$
$
$78.53 - $127.23 $
$
$
$74.46 - $122.38 $
$
$
$77.74 - $126.87 $
$
$
PREVAILING
WAGE RATES
HOURLY
RATE
$19.465 - $27.965 $
OVERTIME /
SATURDAY
RATE
HOLIDAY /
SUNDAY
RATE
$
$
$19.465 - $27.965 $
$
$
$64.47 - $166.29 $
$
$
$64.18 - $169.93 $
$
$
$65.96 - $170.51 $
$
$
UNIT OF MEASURE
CUBIC YARD
CUBIC YARD
CUBIC YARD
CUBIC YARD
PER HOUR
BID UNIT PRICE
$
$
$
$
$
Bid No. 08-25/26
Page 2
GENERAL CONTRACTOR SERVICES PROFIT MARGIN
General Contractors Cost of Material (non-retail) Profit, should not exceed fifteen percent (15%) of item.
Cost of Material (non-retail) Profit should not exceed five percent (5%) if work was performed by Subcontractor.
39
COST OF MATERIAL (NON-RETAIL)PROFIT MARGIN:
NOT TO EXCEED FIFTEEN PERCENT (15%)
%
40
SUBCONTRACTOR’S COST OF MATERIALS (NON-RETAIL) PROFIT MARGIN:
NOT TO EXCEED FIVE PERCENT (5%)
%
EQUIPMENT RENTAL PROFIT MARKUP: NOT TO EXCEED FIFTEEN PERCENT (15%)
41 MAY BE ADDED WITH INITIAL COST OF $300 OR MORE PER MCA EQUIPMENT RENTAL MANUAL %
(NO MARKUP SHALL BE ADDED FOR EQUIPMENT RENTAL OF LESS THAN $300)
Upon a written request from the Contractor within 60 days prior to the expiration of the initial or subsequent one year terms.
The bid pricing shall be adjusted for the following term in accordance with the applicable Regional Consumer Price Index
(CPI for the preceding 12 month period).
Company Name
Address
City
Phone Number
Email
License Number
Print Name
Signature
Bid No. 08-25/26
Page 3
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE
2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
LOCALITY: RIVERSIDE COUNTY
DETERMINATION: RIV-2026-1
CRAFT
CLASSIFICATION
CRAFT
FOOTNOTE
ISSUE
DATE
EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE
FOOTNOTE
HEALTH
AND
WELFARE
HEALTH
AND
WELFARE
FOOTNOTE
PENSION
PENSION
FOOTNOTE
VACATION/
HOLIDAY
VACATION/
HOLIDAY
FOOTNOTE
TRAINING
TRAINING
FOOTNOTE
OTHER
PAYMENTS
OTHER
PAYMENTS
FOOTNOTE
HOURS
HOURS
FOOTNOTE
STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
DAILY
OVERTIME
HOURLY
RATE
FOOTNOTE
SATURDAY
OVERTIME
HOURLY
RATE
SATURDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
SUNDAY
AND
HOLIDAY
OVERTIME
HOURLY
RATE
FOOTNOTE
HOLIDAY
PROVISIONS
SCOPE OF
WORK
PROVISIONS
TRAVEL &
SUBSISTENCE
PROVISIONS
BRICKLAYER, CEMENT
#BRICKLAYER: BLOCKLAYER, POINTER,
CAULKER, CLEANER
02/22/2026 04/30/2026** $52.580 A
$9.500
$9.980
$0.000
$1.750 B
$1.050
8.0 C
$74.860 $98.820 D
$98.820 D
$122.780
Holidays
Scope of
Work
Travel &
Subsistence
#BRICKLAYER:
STONEMASON,
MASON
MARBLE
02/22/2026 04/30/2026** $52.580 A
$9.500
$9.980
$0.000
$1.750 B
$0.650
8.0 C
$74.460 $98.420 D
$98.420 D
$122.380
Holidays
Scope of
Work
Travel &
Subsistence
#BRICKLAYER: MASON FINISHER
02/22/2026 04/30/2026** $47.320 A
$9.250
$9.830
$0.000
$1.180 B
$0.650
8.0 C
$68.230 $89.790 D
$89.790 D
$111.350
Holidays
Scope of
Work
Travel &
Subsistence
#BRICK
TENDER
E
08/22/2025 06/30/2026* $43.430
$9.550
$9.820 F
$4.400 G
$0.800
$0.450
8.0 C
$68.450 $90.170
$90.170
$111.880
Holidays
Scope of
Work
Travel &
Subsistence
#BRICK
TENDER
FORKLIFT OPERATOR
08/22/2025 06/30/2026* $43.880
$9.550
$9.820 F
$4.400 G
$0.800
$0.450
8.0 C
$68.900 $90.840
$90.840
$112.780
Holidays
Scope of
Work
Travel &
Subsistence
#CARPET,
LINOLEUM,
RESILIENT TILE LAYER
02/22/2026 04/30/2026* $46.850 H
$10.380
$6.550
$2.680
$0.730
$0.320
8.0
$67.510 $90.930
$90.930 I
$114.360
Holidays
Scope of
Work
Travel &
Subsistence
CARPET,
LINOLEUM,
MATERIAL HANDLER
J
02/22/2026 04/30/2026* $18.740 H
$10.380
$2.340
$1.180
$0.730
$0.320
8.0
$33.690 $43.060
$43.060 K
$52.430
Holidays
Scope of
Work
Travel &
Subsistence
#DRYWALL
FINISHER
08/22/2025 08/31/2026* $51.330 H
$9.200
$12.080
$6.070
$0.920
$1.220
8.0
$80.820 $106.490
$106.490 L
$132.150
Holidays
Scope of
Work
Travel &
Subsistence
#ELECTRICIAN: SOUND INSTALLER
08/22/2025 11/30/2025* $46.430
$11.360
$7.500 M
$0.000
$0.650
$0.300 N
8.0
$67.630 $91.540 O
$91.540 O
$115.460
Holidays
Scope of
Work
Travel &
Subsistence
#ELECTRICIAN:
INSIDE WIREMAN,
TECHNICIAN
02/22/2026 11/30/2026* $57.260 P
$11.880
$18.120 M
$0.000
$1.110
$0.290 Q
8.0
$90.660 $120.290 R
$120.290 R
$149.930
Holidays
Scope of
Work
Travel &
Subsistence
#ELECTRICIAN: CABLE SPLICER
02/22/2026 11/30/2026* $60.120 P
$11.880
$18.120 M
$0.000
$1.110
$0.300 Q
8.0
$93.610 $124.730 R
$124.730 R
$155.840
Holidays
Scope of
Work
Travel &
Subsistence
#FIELD
CHIEF OF PARTY
SURVEYOR: (018.167-010)
S
02/22/2026 06/30/2026** $67.910
$15.200
$16.150
$4.670 G
$1.300
$0.150
8.0
$105.380 $139.340 O
$139.340 O
$173.290
Holidays
Scope of
Work
Travel &
Subsistence
#FIELD
INSTRUMENTMAN
SURVEYOR: (018.167-034)
S
02/22/2026 06/30/2026** $60.260
$15.200
$16.150
$4.500 G
$1.300
$0.150
8.0
$97.560 $127.690 O
$127.690 O
$157.820
Holidays
Scope of
Work
Travel &
Subsistence
#FIELD
CHAINMAN/RODMAN
SURVEYOR: (869.567-010)
S
02/22/2026 06/30/2026** $59.680
$15.200
$16.150
$4.450 G
$1.300
$0.150
8.0
$96.930 $126.770 O
$126.770 O
$156.610
Holidays
Scope of
Work
Travel &
Subsistence
#GLAZIER
08/22/2025 05/31/2026* $60.500 T
$9.600 U
$15.950
$0.000 V
$0.870
$1.330
8.0
$88.250 $116.000 W
$116.000 W
$143.750
Holidays
Scope of
Work
Travel &
Subsistence
#MARBLE
FINISHER
08/22/2025 05/31/2026** $45.560 X
$9.250
$6.020
$0.000
$1.380
$0.550
8.0
$62.760 $85.540 Y
$85.540 Z
$108.320 AA
Holidays
Scope of
Work
Travel &
Subsistence
#PAINTER:
PAINTER, LEAD
ABATEMENT
AB
08/22/2025 06/30/2026** $43.420 P
$9.200
$6.040
$3.050
$0.750
$1.210
8.0
$63.670 $85.380 AC
$85.380 AC
$107.090
Holidays
Scope of
Work
Travel &
Subsistence
#PAINTER: INDUSTRIAL PAINTER AB
08/22/2025 06/30/2026** $47.320 P
$9.200
$6.040
$3.350
$0.850
$1.210
8.0
$67.970 $91.630 AC
$91.630 AC
$115.290
Holidays
Scope of
Work
Travel &
Subsistence
GRAFFITI REMOVAL
PAINTER:
WORKER JOURNEYMAN
(APPLIES ONLY TO
AD
02/22/2026 01/31/2027** $30.450 X
$8.000
$1.120
$0.750
$0.100
$0.250
8.0
$40.670 $55.900
$55.900 AE
$71.120 AF
Holidays
Scope of
Work
Travel &
Subsistence
PAINT-OVER METHOD)
GRAFFITI REMOVAL
PAINTER:
WORKER 1 (APPLIES
ONLY TO PAINT-OVER
AG
02/22/2026 01/31/2027** $20.950 X
$8.000
$1.120
$0.750
$0.100
$0.250
8.0
$31.170 $41.650
$41.650 AE
$52.120 AF
Holidays
Scope of
Work
Travel &
Subsistence
METHOD)
GRAFFITI REMOVAL
PAINTER:
WORKER 2 (APPLIES
ONLY TO PAINT-OVER
AH
02/22/2026 01/31/2027** $21.820 X
$8.000
$1.120
$0.750
$0.100
$0.250
8.0
$32.040 $42.950
$42.950 AE
$53.860 AF
Holidays
Scope of
Work
Travel &
Subsistence
METHOD)
#PLASTERER
08/22/2025 07/31/2026* $46.180
$9.630
$11.310
$8.400 AI
$1.490
$1.190
8.0 AJ
$78.200 $101.290 AC
$101.290 AK
$124.380
Holidays
Scope of
Work
Travel &
Subsistence
#PLASTER
TENDER
AL
02/22/2026 08/04/2026* $48.720
$9.550
$11.970
$5.300 AM
$1.200
$0.960
8.0
$77.700 $102.060 AN
$102.060 AO
$126.420
Holidays
Scope of
Work
Travel &
Subsistence
PLASTER
TENDER
PLASTER CLEAN-UP
LABORER
02/22/2026 08/04/2026* $46.170
$9.550
$11.970
$5.300 AM
$1.200
$0.960
8.0
$75.150 $98.240 AN
$98.240 AO
$121.320
Holidays
Scope of
Work
Travel &
Subsistence
#PLUMBER:
PLUMBER, INDUSTRIAL
AND GENERAL
PIPEFITTER
02/22/2026 08/31/2026** $61.730 AP
$9.360
$14.350 AQ
$0.000 AR
$3.100
$1.650 AS
8.0
$90.190 $120.080 D
$120.080 D
$148.250
Holidays
Scope of
Work
Travel &
Subsistence
#PLUMBER:
SEWER AND STORM
DRAIN PIPELAYER
02/22/2026 08/31/2026** $48.840 AP
$9.250
$11.500 AQ
$0.000 AR
$2.830
$1.650 AS
8.0
$74.070 $97.510
$97.510 AT
$120.250
Holidays
Scope of
Work
Travel &
Subsistence
SEWER AND STORM
PLUMBER: DRAIN PIPE
AU
TRADESMAN
02/22/2026 08/31/2026** $24.150 AV
$9.500
$0.380
$0.000
$1.910
$1.500 AS
8.0
$37.440 $48.540
$48.540 AT
$59.640
Holidays
Scope of
Work
Travel &
Subsistence
#PLUMBER:
SERVICE & REPAIR
(PLUMBER/HVAC-
FITTER)
02/22/2026 08/31/2026** $59.850 AP
$9.360
$14.040 AQ
$0.000 AR
$2.430
$1.650 AS
8.0
$87.330 $116.280
$116.280 AW
$143.500 AX
Holidays
Scope of
Work
Travel &
Subsistence
#PLUMBER:
LANDSCAPE/IRRIGATION
FITTER
02/22/2026 08/31/2026** $44.750 X
$9.360
$14.350 AQ
$0.000 AR
$2.490
$1.450 AS
8.0
$72.400 $94.780
$94.780 AT
$115.700
Holidays
Scope of
Work
Travel &
Subsistence
PLUMBER:
LANDSCAPE/IRRIGATION
TRADESMAN
AY
02/22/2026 08/31/2026** $21.460 X
$3.000
$1.160 AQ
$0.000
$0.100
$1.250 AS
8.0
$26.970 $37.700
$37.700 AT
$48.430
Holidays
Scope of
Work
Travel &
Subsistence
FIRE SPRINKLER FITTER
#PLUMBER:
(PROTECTION AND
CONTROL SYSTEMS,
OVERHEAD AND
02/22/2026 03/31/2026** $50.790
$13.600
$15.610 AZ
$0.000
$0.590
$0.300
8.0
$80.890 $106.280
$106.280
$131.680
Holidays
Scope of
Work
Travel &
Subsistence
UNDERGROUND)
#ROOFER
08/22/2025 07/31/2026* $52.630 BA
$8.560
$11.500 F
$0.000 BB
$0.580
$0.720 BC
8.0
$73.990 $98.040 BD
$98.040 BD
$122.090
Holidays
Scope of
Work
Travel &
Subsistence
#ROOFER
PITCH WORK
08/22/2025 07/31/2026* $54.380 BA
$8.560
$11.500 F
$0.000 BB
$0.580
$0.720 BC
8.0
$75.740 $100.670 BD
$100.670 BD
$125.590
Holidays
Scope of
Work
Travel &
Subsistence
#ROOFER
PREPARER
08/22/2025 07/31/2026* $53.630 BA
$8.560
$11.500 F
$0.000 BB
$0.580
$0.720 BC
8.0
$74.990 $99.540 BD
$99.540 BD
$124.090
Holidays
Scope of
Work
Travel &
Subsistence
#SHEET METAL
WORKER
08/22/2025 06/30/2026** $62.410 P
$11.770
$18.010 BE
$0.000
$0.820
$0.720
8.0
$93.730 $124.930 BF
$124.930 BF
$156.140
Holidays
Scope of
Work
Travel &
Subsistence
#TERRAZZO
FINISHER
08/22/2025 08/31/2026* $45.130 H
$9.250
$4.710
$0.000 BG
$1.110
$0.330
8.0 AT
$60.530 $83.100 Y
$83.100 BH
$105.660 AA
Holidays
Scope of
Work
Travel &
Subsistence
#TERRAZZO
WORKER
08/22/2025 08/31/2026* $52.670 H
$9.250
$4.860
$0.000 BG
$1.340
$0.390
8.0 AT
$68.510 $94.850 Y
$94.850 BH
$121.180 AA
Holidays
Scope of
Work
Travel &
Subsistence
#TILE
FINISHER
08/22/2025 05/31/2026** $40.130 X
$9.250
$4.500
$0.000
$1.310
$0.510
8.0
$55.700 $75.760 Y
$75.760 Z
$95.830 AA
Holidays
Scope of
Work
Travel &
Subsistence
#TILE LAYER
08/22/2025 05/31/2026** $54.360 X
$9.250
$9.850
$0.000
$1.510
$0.620
8.0
$75.590 $102.770 Y
$102.770 Z
$129.950 AA
Holidays
Scope of
Work
Travel &
Subsistence
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.