Construction: Sheldon High School Warewash Remodel

Location: Oregon
Posted: Feb 17, 2026
Due: Mar 12, 2026
Agency: Eugene School District 4J
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
  • Construction: Sheldon High School Warewash Remodel

    PROJECT NAME:

    Sheldon High School Warewash Remodel

    CIP No. 464-903-P0035

    Bid Due Date:

    Thursday, March 12, 2026 at 2:00 PM

    Non-Mandatory Pre-Bid:

    Wednesday, February 25, 2026 at 3:00 PM  at 2455 Willakenzie Rd., Eugene, OR 97401

    Addenda:

    Document Uploads

    Sheldon High School Warewash Remodel Project Manual

    Sheldon High School Warewash Remodel Drawings

    Est. Const. Cost:

    $370,000

    Status:

    Active

    Questions:  Contact Project Manager, Dexter Rummel at rummel@4j.lane.edu

    Hard copies are not provided by the School District.  It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink.  It is important that all bidders correctly indicate all addenda on the bid form.

  • Attachment Preview

    EUGENE SCHOOL DISTRICT 4J
    Sheldon High School
    Warewash Remodel
    4J CIP#: 464.903.P0035
    Project Manual
    100% Construction Documents
    13 February 2026
    SECTION 00 0101
    TITLE PAGE
    4J CIP#: 464.903.P0035
    PROJECT:
    Sheldon High School Warewash Remodel
    Eugene Public School District 4J
    Eugene, Oregon
    C.I.P. Project No. 464.903.P0035
    OWNER:
    Eugene School District 4J
    715 West 4th Ave.
    Eugene, Oregon 97402
    CONTACT:
    Project Manager, Dexter Rummel (rummel_d@4j.lane.edu)
    (541) 790-7424 Office
    ARCHITECT:
    Rowell Brokaw Architects
    1203 Willamette St. #210
    Eugene, OR 97401
    CONTACTS:
    Principal: Mark Young, AIA (mark@rowellbrokaw.com)
    Project Manager/Architect: Brooke McDonald, AIA (brooke@rowellbrokaw.com)
    (541) 485-1003 Office
    FOOD SERVICE:
    JLR Design Group
    PO Box 3675
    Everett, WA 98213
    CONTACT:
    Principal: Garrett Lennon (garrett@jlrdesigngroup.com)
    (206) 625-0070 Office
    MECHANICAL / ELECTRICAL / PLUMBING
    Systems West Engineers
    725 A Street
    Springfield, OR 97477
    CONTACTS:
    Mechanical: Paul Fooks, PE (pfooks@systemswestengineers.com)
    Electrical: Jon Snyder (jsnyder@systemswestengineers.com)
    Plumbing: Kasey Richard, PE (krichards@systemswestengineers.com)
    (541) 342-7210 Office
    END OF SECTION
    4J Sheldon Warewash Remodel
    100% CD - 13 February 2026
    00 0101 - 1 of 1
    Title Page
    4J CIP#: 464.903.P0035
    SECTION 00 0110
    TABLE OF CONTENTS
    PROCUREMENT AND CONTRACTING REQUIREMENTS
    DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
    00 0101 - Project Title Page
    00 0110- Table of Contents
    00 1114 - Invitation to Bid
    00 2113 - Instructions to Bidderss, AIA Document A701
    00 2213 - Supplementary Instructions to Bidders
    00 4113 - Bid Form
    00 4522 - First-Tier Subcontractor Disclosure Form
    00 5213 - Form of Agreement, Sample AIA Document A101
    00 7213 - General Conditions, AIA Document A201
    00 7343 - Prevailing Wage Rates for Public Contracts in Oregon - Effective January 2026.
    SPECIFICATIONS
    DIVISION 01 -- GENERAL REQUIREMENTS
    01 1100 - Summary of Work
    01 2500 - Contract Modification Procedures
    01 2900 - Payment Procedures
    01 3100 - Project Management and Coordination
    01 3200 - Construction Progress Documentation
    01 3300 - Submittal Procedures
    01 3310 - Delegated Design Requirements
    01 4000 - Quality Requirements
    01 5000 - Temporary Facilities and Controls
    01 6000 - Product Requirements (Substitution Request Form)
    01 6116 - VOC Limitations
    01 7300 - Execution Requirements
    01 7329 - Cutting and Patching
    01 7419- Construction Waste Management and Disposal
    01 7700 - Closeout Procedures
    01 7823 - Operation and Maintenance Data
    01 7839 - Project Record Documents
    DIVISION 02 -- EXISTING CONDITIONS
    02 4100 - Demolition
    DIVISION 03 -- CONCRETE
    03 3000 - Cast-in-Place Concrete
    DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
    06 2001 - Interior Finish Carpentry
    06 8200- Fiber Reinforced Plastic
    DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
    07 9200 - Joint Sealants
    4J Sheldon Warewash Remodel
    100% CD - 13 February 2026
    00 0110 - 1 of 2
    Table of Contents
    4J CIP#: 464.903.P0035
    DIVISION 09 -- FINISHES
    09 2116 - Gypsum Board Assemblies
    09 3000 - Tiling
    09 5100- Acoustical Ceilings
    09 6500 - Resilient Base
    09 9123 - Interior Painting
    DIVISION 10 -- SPECIALTIES
    10 2601 - Wall and Corner Guards
    DIVISION 11 -- EQUIPMENT
    11 4000- Food Service Equipment
    DIVISION 22 -- PLUMBING
    22 0500 - General Plumbing Provisions
    22 0719 - Plumbing Piping Insulation
    22 1000 - Plumbing Piping
    22 1323 - Sanitary Waste Interceptors
    DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
    23 0500 - General HVAC Provisions
    23 0513 - Common Motor Requirements for HVAC Equipment
    23 0548- Vibration and Seismic Controls for HVAC
    23 0553- Identification for HVAC Piping and Equipment
    23 0593 - Testing, Adjusting, and Balancing for HVAC
    23 0713 - Duct Insulation
    23 3113 - Metal Ductwork
    23 3300 - Air Duct Accessories
    23 3416 - Centrifugal HVAC Fans
    23 3713 - Air Outlets and Inlets
    DIVISION 26 -- ELECTRICAL
    26 0500 - General Electrical Provisions
    26 0501 - Electrical Demolition
    26 0519 - Low-Voltage Electrical Power Conductors and Cables
    26 0526 - Grounding and Bonding for Electrical Systems
    26 0529 - Hangers and Supports for Electrical Systems
    26 0533 - Raceways and Boxes for Electrical Systems
    26 0553 - Identification for Electrical Systems
    26 0923 - Lighting Control Equipment
    26 0924 - Digital Lighting Control Equipment
    26 2726 - Wiring Devices
    26 5100 - Lighting Fixtures
    END OF SECTION
    4J Sheldon Warewash Remodel
    100% CD - 13 February 2026
    00 0110 - 2 of 2
    Table of Contents
    DOCUMENT 00 11 13
    INVITATION TO BID
    Electronic bids will be received by Diana McElhinney, Facilities Management Assistant, for the Sheldon Kitchen
    Renovation on Thursday, March 12, 2026 until the Deadline for Bid Submission at 2:00 p.m. local time. Email
    electronic Bid to: CIP@4j.lane.edu. There will not be a public opening. However, Bid results will be posted on the
    4j hyperlink listed below, following the deadline for submission of Bids. Late Bids will not be considered. Bidders
    are encouraged to send a test email to the email address above to ensure they have it correct and that we receive it
    accordingly. For purpose of receipt time, the sent timestamp from the bidder’s email account will be used and an
    email receipt confirmation will be sent to submitter.
    Briefly, the work is described as: Remove the original dishwasher and install new with renovations to the
    warewash room, kitchen area and storage alcove.
    Beginning Tuesday, February 17, 2026 Prime Bidders, Sub-bidders and Suppliers may obtain bidding documents at
    the following hyperlink: http://www.4j.lane.edu./bids/. Hard copies are not provided by the School District. It is
    the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda
    from the hyperlink.
    A non-mandatory pre-bid conference and walk-through has been scheduled for Wednesday, February 25, 2026 at
    3:00 p.m. The location of the conference will be in front of the school at 2455 Willakenzie Rd, Eugene, OR 97401.
    Statements made by the District’s representatives at the conference are not binding upon the District unless
    confirmed by Written Addendum. Pre-qualification of bidders is not required.
    Each Bid must be submitted on the prescribed form and accompanied by an electronic copy of a Surety Bond,
    Cashier’s Check, or Certified Check, executed in favor of Eugene School District 4J, in the amount not less than ten
    percent (10%) of the total bid, based upon the total bid amount for those items bid upon. It is important that all
    bidders correctly indicate all addenda on the bid form.
    Either with the Bid or within two working hours of the Deadline for Submission of Bids, bidders shall electronically
    submit, on the form provided, information regarding first-tier subcontractors furnishing labor or labor and materials,
    as provided in ORS 279.C.370.
    Bidders are required to hand deliver or mail by USPS, the original Surety Bonds, Cashier’s Check or Certified
    Check and post marked within 3 days after the deadline for submission of bid. Mail to Facilities Management,
    Attention CIP, 715 West 4th Avenue, Eugene, Oregon 97402.
    No bid for a construction contract will be received or considered unless the Bidder is registered with the
    Construction Contractors Board or licensed by the State Landscape Contractors Board at the time the Bid is made, as
    required by OAR 137-049-0230. [A license to work with asbestos-containing materials under ORS 468A.720 is not
    required for this project.]
    For every bid $100,000 or greater, all Contractors and Subcontractors shall have a public works bond, in the amount
    of $30,000, filed with the Construction Contractors’ Board (CCB), before starting work on the project, unless
    exempt. A copy of the Contractors’ BOLI Public Works Bond shall be provided with the executed contract
    documents.
    Each Bid shall contain a statement indicating whether the Bidder is a “resident bidder”, as defined in ORS
    279A.120.
    Each Bid shall contain a statement that the “Contractor agrees to be bound by and will comply with the provisions of
    ORS 279C.800 through 279C.870 regarding payment of Prevailing Wages”.
    Contractor shall certify nondiscrimination in obtaining required subcontractors, in accordance with ORS
    279A.110(4).
    School District 4J reserves the right to (1) reject any or all Bids not in compliance with all public bidding procedures
    and requirements, (2) postpone award of the Contract for a period not to exceed sixty (60) days from the date of bid
    opening, (3) waive informalities in the Bids, (4) select the Bid which appears to be in the best interest of the District,
    or (5) reject any or all bids.
    Date:
    Tuesday, February 17, 2026
    By:
    Diana McElhinney, Facilities Management Assistant
    Published:
    Register Guard, Daily Journal of Commerce, and the OregonBuys eProcurement System
    Posted:
    School District 4J Hyperlink: http://www.4j.lane.edu/bids/
    INVITATION TO BID
    00 11 13 - 1
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL
    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.