HCTP Biosolids Conveying and Storage Improvements Project (CI 5683)

Location: California
Posted: Apr 20, 2025
Due: Jun 16, 2025
Agency: City of Thousand Oaks
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.


Project ID:

Title: HCTP Biosolids Conveying and Storage Improvements Project (CI 5683)

Addenda: 0

Release Date: 4/18/2025

Due Date: 6/16/2025

Post Information
Posted At:Fri, Apr 18, 2025 8:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

The Hill Canyon Treatment Plant ("HCTP") provides tertiary-level wastewater treatment for the City of Thousand Oaks. It was constructed in the 1960s with major improvements over the following decades. As part of the City’s HCTP Master Plan (2020), the need to develop flexibility for biosolids handling was identified, whether that be trucking biosolids directly from the dewatering press discharge conveyor and depositing it into hauling trailers or conveying the biosolids to an adjacent location to be managed and processed/hauled at a different time. The vision is to utilize an alternate conveyance and storage facility in the drying beds to allow for staff utilization at night on different tasks rather than monitoring the biosolids load in the hauler/trailer. City is seeking an alternatives analysis document outlining the different conveyance system products and alignment/orientations and sizing, as well as preliminary layouts and details on the required storage facility options to temporarily house the biosolids, which will be trucked or processed later. Construction ready plans and technical specifications will be prepared for the recommended conveyance and storage system.

Background

The Public Works Department is seeking the most qualified consultant and intends to award an engineering design contract for the biosolids conveying and storage project. In conjunction with the work, at a minimum, the consultant shall attend periodic update meetings (at City’s request) with the City staff to identify and develop a plan of action and a project schedule for work effort. Consultant shall be willing to commit the necessary resources to meet such City needs expeditiously (within two weeks) and on an ongoing basis for the duration of the contract.

Timeline
Release Project Date:
April 18, 2025
Pre-Proposal Meeting (Non-Mandatory):
May 28, 2025, 2:00pm
Hill Canyon Treatment Plant
9600 Santa Rosa Road
Camarillo, CA 93012
Question Submission Deadline:
June 9, 2025, 4:00pm
Proposal Submission Deadline:
June 16, 2025, 4:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...2026 On-Call Trucking Services Contract(s) For Various Road and Flood Control Maintenance Project... ...

Contra Costa County

Bid Due: 6/09/2026

.... WEST COAST WATER & TRUCKING, INC. 3941 Park Dr, Suite #20-231 El ...

City of Stockton

Bid Due: 7/02/2026

...; and Trucking and Hauling; Please refer to Section 01 60 00 in ...

San Francisco Public Utilities Commission

Bid Due: 6/04/2026

..., to the following major types of work: traffic control services and trucking. ...

San Francisco Public Utilities Commission

Bid Due: 7/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.