| Location: | Pennsylvania |
|---|---|
| Posted: | Apr 20, 2025 |
| Due: | May 6, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Middletown Township, Bucks County |
| Publication URL: | To access bid details, please log in. |
Project Description: The Township of Middletown is performing stormwater infrastructure improvements along Longview Avenue, Willow Avenue, Adams Avenue, Jefferson Avenue, Harrison Avenue and Clay Avenue. In general, the work consists of, but is not limited to: installation of storm sewer structures, installation of new storm sewer piping, concrete headwall and endwall installation, culvert installation, removal and replacement of existing drainage with improved drainage, rip rap swale protection, restorations, pavement, landscaping, and tree removal as needed.

With GovernmentContracts, you can:
...piping and supports. * Installation of concrete slabs and pads, pre-cast concrete walls, ...
PennBid
Bid Due: 6/19/2026
...includes the construction of 871 linear feet of concrete sidewalk, 4 ADA curb ...
PennBid
Bid Due: 7/07/2026
...curb ramps, concrete driveway aprons, pavement mill and overlay resurfacing, asphalt pavement base... ...
PennBid
Bid Due: 6/12/2026
...for replacement of existing CMP with SLCPP, associated pavement, concrete curb and sidewalk ...
PennBid
Bid Due: 7/09/2026