| Location: | Vermont |
|---|---|
| Posted: | Sep 25, 2026 |
| Due: | Oct 7, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Washington Keywords: Construction (Non Building), Stream Restoration Bid Description: The Town of Middlesex (Town) is requesting bids from qualified contractors for the stabilization of a steam bank and roadway embankment along Old Brook Road. This project consists of a Mechanically Stabilized Earth (MSE) wall supporting the roadway's southbound (western) lane. The MSE wall will be supported by a soil nail stabilized slope extending down to the slope toe. Stone fill armoring will be placed at the toe of the slope and will be keyed into the bedrock to provide further stability. The contractor will be responsible for the final design of the soil nail stabilization system and the MSE wall. To request the construction drawings and specifications prepared by Fitzgerald Environmental Associates (FEA) and GEODesign, reach out to Jordan Duffy at jordan@feavt.com and copy Alan Baribault at abaribault@geocompanies.com.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...Follow Construction Services for Richford LPOE, Vermont Active Contract Opportunity Notice ID... - ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 12/24/2026
...Construction Management Services for a New Public Works Facility Request Date: 11/16/2026 3:02:03... ...
State Government of Vermont
Bid Due: 12/18/2026
...: Bridge Repair and Construction Bid Description: REMOVAL AND REPLACEMENT OF EXISTING STEEL.../bids-requests/construction-contracting ...
State Government of Vermont
Bid Due: 12/04/2026
...: Bennington Keywords: Bridge Repair and Construction Bid Description: Replacement of existing bridge.../bids-requests/construction-contracting ...
State Government of Vermont
Bid Due: 11/20/2026