Pre-Qualification: Fuel Dispenser and UDC Replacement

Location: California
Posted: Aug 10, 2025
Due: Sep 8, 2025
Agency: Santa Clara Valley Transportation Authority
Type of Government: State & Local
Category:
  • N - Installation of Equipment
Solicitation No: C25195F -Pre Qual
Publication URL: To access bid details, please log in.


Project ID: C25195F -Pre Qual

Title: Pre-Qualification: Fuel Dispenser and UDC Replacement

Addenda: 0

Release Date: 7/16/2025

Due Date: 9/8/2025

Post Information
Posted At:Wed, Jul 16, 2025 6:00 AMSealed Bid Process:NoPrivate Bid:No
Overview
Summary

This Request for Pre-Qualification of Bidders is intended to solicit information in the form of a qualification questionnaire and qualification statements. All Bidders that intend to submit a bid for the Project must fully complete the Pre-Qualification Questionnaire, provide all materials requested herein, and be approved by VTA in order to be included on the final qualified Bidders list. No bid will be accepted from a Bidder that has failed to comply with these requirements. If two or more firms submit a SOQ as part of a Joint Venture, or expect to submit a SOQ as part of a Joint Venture, each entity within the Joint Venture must be separately pre-qualified.

Background

The Santa Clara Valley Transportation Authority (VTA) will be soliciting bids for “Fuel Dispenser and UDC Replacement” (Project).

Notice is hereby given that VTA is now soliciting Statements of Qualifications (SOQ) from bidders (Bidders) with construction expertise to furnish all labor, materials, tools, equipment, services, supervision, and incidentals necessary to decommissioning and removal of existing diesel and gasoline dispensers, including underground dispenser containment (UDC), within three (3) VTA bus maintenance facilities/yards (Project sites), located at the addresses listed below. In the same locations, the Project includes installation of new UDC, leak detection system, new diesel and gasoline dispensers, tie-in to existing fuel lines, tie-in to existing power source, installation of new conduits and network cables, leak test of fuel lines after installation, installation of fluid management equipment and devices, and restoration of the concrete island. As part of the installation of the fluid management equipment, work includes testing of the system to ensure full operational capability between the remote island head and the data logger devices installed within each VTA bus and training of VTA personnel and staff.

Project Locations:

Cerone Yard located at 3990 Zanker Road, San Jose, CA 95134 (Base Work)

North Yard located at 1235 La Avenida Street, Mountain View, CA 94043 (Option 1 Work)

Chaboya Yard located at 2240 S. 7th Street, San Jose, CA 95112 (Option 2 Work)

Timeline
Pre-Qualification Publication Date:
July 16, 2025
Pre-Qual Submission Deadline:
September 8, 2025, 2:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...level of the building. New electrical conduits and supports will be routed from ...

UCLA Capital Programs

Bid Due: 7/28/2026

...Follow USACE SPK DBB Construction - Natomas NPP - Sacramento, CA Active Contract ...

DEPT OF DEFENSE

Bid Due: 9/04/2026

...) of Avenida De Los Arboles, west of Highway 23, and will install ...

City of Thousand Oaks

Bid Due: 7/29/2026

...PRIMARILY OF STANDARD ELECTRICAL CONSTRUCTION, CONDUIT INSTALLATION, AND THE INTEGRATION OF COMMERCIAL... 19.15) ...

DEPT OF DEFENSE

Bid Due: 8/13/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.