| Location: | Florida |
|---|---|
| Posted: | Feb 6, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EP25C0005 |
| Publication URL: | To access bid details, please log in. |
Project work consists of maintenance dredging at Canaveral Harbor, FL to remove approximately 1.2 million cubic yards of shoal material at Cut-1A to the West Access Channel (WAC), the Middle Turning Basin (MTB), the South Jetty Sediment Trap (SJST), the Trident Access Channel (TAC), and the Trident Turning Basin (TTB). All material will be disposed of in the designated Ocean Dredged Material Disposal Site (ODMDS). The ODMDS is located 4.0 to 8.0 nautical miles from the designated dredging areas. Project work also includes environmental species monitoring, turbidity monitoring, and stand by time. Project work will be split between

With GovernmentContracts, you can:
...Advertisement Detail Department of Transportation Agency Decisions ENVIRONMENTAL PROGRAM...
State Government of Florida
Bid Due: 11/12/2090
...Advertisement Detail Department of Transportation Agency Decisions ENVIRONMENTAL PROGRAM...
State Government of Florida
Bid Due: 11/12/2090
...Request for Proposals NEFSH Environmental Services (EVS) Department of Children and Families (DCF... ...
State Government of Florida
Bid Due: 10/19/2026
...Districtwide Environmental Compliance Monitoring Services RFP-DOT-07/08-6098DS Original Competitive Solicitation...
State Government of Florida
Bid Due: 7/08/2060