| Location: | Florida |
|---|---|
| Posted: | Feb 6, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EP25C0005 |
| Publication URL: | To access bid details, please log in. |
Project work consists of maintenance dredging at Canaveral Harbor, FL to remove approximately 1.2 million cubic yards of shoal material at Cut-1A to the West Access Channel (WAC), the Middle Turning Basin (MTB), the South Jetty Sediment Trap (SJST), the Trident Access Channel (TAC), and the Trident Turning Basin (TTB). All material will be disposed of in the designated Ocean Dredged Material Disposal Site (ODMDS). The ODMDS is located 4.0 to 8.0 nautical miles from the designated dredging areas. Project work also includes environmental species monitoring, turbidity monitoring, and stand by time. Project work will be split between

With GovernmentContracts, you can:
...Geotechnical Engineering 92670 Permitting Services, Environmental 92592 Value Engineering and Value... Treatment Engineering ...
Palm Beach County
Bid Due: 11/12/2026
...engineering * Stormwater management and drainage engineering * Environmental engineering and permitting... recommendations ...
City of Kissimmee
Bid Due: 9/28/2026
...] Environmental Engineering [925-44] General Construction: Management, Scheduling, Cost Estimation... Engineering Services for ...
City of Cocoa
Bid Due: 10/13/2026
...Description: COASTAL AND MARINE ENGINEERING ANNUAL SERVICES Department: Environmental Resources...
Palm Beach County
Bid Due: 10/31/2030