RFP 1014 Warehouse Construction

Location: California
Posted: Mar 12, 2026
Due: Apr 23, 2026
Agency: City of Anaheim
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.


Project ID:

Title: RFP 1014 Warehouse Construction

Addenda: 0

Release Date: 3/12/2026

Due Date: 4/23/2026

Follow
RFP 1014 Warehouse Construction
REQUEST FOR WORK ORDER PROPOSAL
Public Works
90900 , 91000 , 91200 , 91300 , 91400 , 96800
Project ID: WO 394300
Release Date: Thursday, March 12, 2026
ยท Due Date: Thursday, April 23, 2026 2:00pm
Posted Thursday, March 12, 2026 8:00am
All dates & times in Pacific Time
Draft Response Events RSVP No Bid41 days, 19 hours, 25 minutes


Post Information

Posted At:Thu, Mar 12, 2026 8:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

In partnership with the Public Works Department, this Request for Proposal (RFP) for the 1014 Warehouse Construction Project is being issued by Anaheim Public Utilities (APU) to the Most Responsive Bidder. The Work includes all grading, utility, and construction of a new warehouse located at 1014 E. South St., Anaheim, CA, 92805. The original building on this parcel has already been demolished.



Background

Objective

  1. The intent of the Project is to furnish a code compliant product, whether or explicitly outlined herein. The Contractor is required to provide a complete turn-key product. Inclusive of grading, pad certification, fire protection and alarm, utility connection, building code and permits, inspections, storage racking permits, and any other related scope.
  2. Contractor shall be responsible for finishing and obtaining all permits for the project.

Access Badge Reader

  1. In addition to the requirements outlined in the Plans, Contractor shall be required to furnish all hardware, wiring, cabling, conduit, applicable door locksets, labor, and any other expense arising out to delivering a fully operable badge reader system.
  2. Controller
    1. Contractor shall furnish conduit and CAT 6 patch chord from IDF switch to Access Badge Controller.
    2. Controller location shall be as directed by City. Location shall be approximately near South IDF Room.
    3. Controller must be SIELOX 1700.
  3. Access Badge Reader - Material
    1. Access Badge Reader for vehicle entry shall be HID MaxiProx.
    2. RFID Vehicle Badge Reader: Tagmaster XT-1
    3. Access Badge Reader for pedestrian door shall be: ProxPro II
  4. Access Badge Reader - Location
    1. RFID Vehicle Badge Reader - Affixed to gate at a height that meets manufacturer requirements.
    2. North Pedestrian Building Entry Door
    3. South Pedestrian Building Entry Door
    4. Exterior - West Elevation - South Coner - to control motorized vehicle gate exit.

Burglar Alarm System

  1. Burglar is not shown in the Plans; however, Contractor shall be required to fully furnish a connected system as follows:
    1. Contractor shall furnish all wiring, conduit, cabling, equipment, hardware, accessories, labor, and other expenses to fully furnish a burglar alarm system.
    2. Contractor is required to furnish two (2) controllers capable of turning the system on/off. Final location for each controller to be determined by City. One controller shall be located near the front door and near the fire alarm control panel. The second controller shall be located near the South pedestrian door.
    3. System shall be equipped with motion and door sensors.
    4. System shall be capable of connecting to Citywide monitoring.
    5. System manufacture shall be Siemens.

Fire Control Panel

  1. City may approve equivalent substitute panel. Allowable system substitutes include Fire-Lite and Hochiki.
  2. Substitutes shall be reviewed and approved during pre-construction phase.

Existing Conditions

  1. Contractor may re-use existing temporary chain link fence and screen.

Alternate Add Item - Trench

  1. Review exhibit "YYY - ALT ITEM #02 - SKETCH - ADDITIONAL EARTHWORK AND IMPROVEMENTS."
  2. Part A - Fiber
    1. Trench approximately 100' from the North side of the adjacent warehouse located at 847 S. East Street to the IDF room in the South-West corner of the 1014 Warehouse
    2. Run approximately 330' of 2' EMT conduit from Dixco IDF room, through the North Dixco wall, and into the trench. Exterior conduit must be ridged.
    3. Conduit bends must allow for fiber cable. Final route much be approved by City Network Engineer and not contain sharp bends.
    4. Run three (3) 2'' conduit underground. PVC-40 conduit.
  3. Part B - Future Electrical Features
    1. Trench approximately 70' from the start of the fiber trench all the way until the East property line.
    2. Stub up for future motorized gate. connection and ground loops, and 2 badge readers on both sides of the gate.
    3. Trench approximately 100' parallel to the East property line and into the new 1014 Warehouse.
    4. Furnish at least 6 stub ups along the East property line for future EV chargers. Exact location field directed by City. Cap stub-up at grade.
    5. Run four (4) 2'' conduit in the trench. PVC-40 conduit.
  4. Pull Boxes
    1. Pull boxes to be furnished by City. Contractor shall be required to set and place City provided boxes.

Coordination With Others

  1. Trenching
    1. Contractor shall coordinate with City In-House Labor and/or Others to furnish a trench from the adjacent warehouse located at 847 S. East Street to the South-West corner of the 1014 Warehouse.
    2. Contractor shall coordinate with Others to furnish at least three 2'' stub-ups through the 1014 Warehouse building pad.
    3. Contractor is not required to perform trenching, back filling, furnishing conduit, setting pull boxes, nor pulling any wire for this portion only.
    4. Contractor shall be required to perform tie in which includes connecting exterior pipe through into the building and sealing the penetration.
  2. Motorized Storage Racks
    1. Contractor shall coordinate with Others for the installation of a motorized storage racking system.
    2. Contractor is not required to purchase storage rack material or facilitate installation labor.
    3. Contractor shall be required to perform all work arising out of the applicable permits including storage rack and high pile.
    4. Contractor shall be required to perform any applicable power and low voltage to connect the system.



Timeline

BID ADVERTISEMENT DATE:
March 12, 2026
PRE-BID MEETING (Mandatory):
March 26, 2026, 1:00pm
909 E. VERMONT AVE., ANAHEIM, CA, 92805 - ROOM# ASSEMBLY ROOM
QUESTION SUBMISSION DUE DATE:
April 9, 2026, 2:00pm
BID DUE DATE:
April 23, 2026, 2:00pm
EXPECTED AWARD DATE:
May 14, 2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project ID: Title: 2026 Technology Cabling Project Addenda: 1 Release Date: 5/27/2026 Due ...

San Joaquin Delta College

Bid Due: 7/01/2026

...RFx Name: BPM013147 RFx Begin Date (UTC+0): RFQ - AS-NEEDED CABLING SERVICES AND ...

San Diego County

Bid Due: 6/11/2026

..., cabling, light poles, and firewater; and performing all associated work, all in ...

Port of Oakland

Bid Due: 6/22/2026

..., including required equipment, conduits/cabling, equipment supports, and site appurtenances, all...

City of Thousand Oaks

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.