| Location: | Vermont |
|---|---|
| Posted: | Jul 13, 2026 |
| Due: | Jul 31, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Rutland Keywords: Construction (Non Building), Concrete, Paving Contractor, Storm Water System Design Bid Description: The project includes the following Work: Installation of a subsurface stormwater infiltration system beneath the former school's basketball courts, located at 47 Mechanics Street in the Town of Castleton. The new system will be supported by a new catch basin, three new stormwater manholes, two new overflow diversion structures, and all associated stormwater piping.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...), Construction Management, Landscaping, Mechanical Services and Repair, Storm Water System Design Bid...
State Government of Vermont
Bid Due: 11/05/2026
...by the July 2024 storms. Construction activities include streambank protection via riprap armoring...
State Government of Vermont
Bid Due: 10/27/2026
...), Construction Management, Landscaping, Mechanical Services and Repair, Storm Water System Design Bid...
State Government of Vermont
Bid Due: 11/04/2026
...and Design Services, Storm Water System Design Bid Description: The Central Vermont Regional...
State Government of Vermont
Bid Due: 10/26/2026