| Location: | North Carolina |
|---|---|
| Posted: | Oct 2, 2024 |
| Due: | Oct 24, 2024 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SCO-Downtown Government Complex - Chilled Water Efficiency Improvements |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | SCO-Downtown Government Complex - Chilled Water Efficiency Improvements |
| Project Title: | NC Department of Administration: Downtown Government Complex - Chilled Water Efficiency Improvements |
| Description: | Designer Advertisement. The project aims to improve the chilled water efficiency of buildings connected to the chilled water loop in the Downtown Government Complex. The primary focus is to replace chilled water coils in air handling units across various buildings to improve the chilled water temperature differential (Delta T). The project involves removing existing chilled water coils, installing new coils, and addressing associated piping, valves and controls. Design services are needed to assess existing conditions, develop replacement strategies, and ensure seamless integration with the current chilled water loop infrastructure, including coordination with existing heat exchangers. |
| Opening Date: | 10/24/2024 4:00 PM |
| Posted Date: | 10/3/2024 |
| Status: | Open |
| Department: | STATE OF NC - CONSTRUCTION OFFICE |
|
Solicitation Number
*
SCO-Downtown Government Complex - Chilled Water Efficiency Improvements
|
Department
STATE OF NC - CONSTRUCTION OFFICE
|
Status Reason
Open
|
|
|
Opening Date
2024-10-24T16:00:00.0000000
|
Posted Date
*
2024-10-02T20:23:37.0000000Z
|
Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
Designer Advertisement. The project aims to improve the chilled water efficiency of buildings connected to the chilled water loop in the Downtown Government Complex. The primary focus is to replace chilled water coils in air handling units across various buildings to improve the chilled water temperature differential (Delta T). The project involves removing existing chilled water coils, installing new coils, and addressing associated piping, valves and controls. Design services are needed to assess existing conditions, develop replacement strategies, and ensure seamless integration with the current chilled water loop infrastructure, including coordination with existing heat exchangers.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...Solicitation Number: 70020317 Project Title: Air Handling Unit Renovations at the High Point... ...
State Government of North Carolina
Bid Due: 6/18/2026