| CONSTRUCTION ADVERTISEMENTS | QUESTIONS DUE PRIOR TO 4:30 PM | ADDENDA | BID OPENING |
|
C03279 PLAINFIELD ER P24-2(610) PROPOSAL Geotechnical Data Report - Emergency Sheeting Geotechnical Data Report - Subsurface Explorations TMP Checklist APPROVED BIDDERS LIST PLAN HOLDERS LIST DOWNLOAD PLANS IN iCX |
5/13/2026 |
5/22/2026 |
| VTransMissionandVision | |
|---|---|
| Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods. |
VERMONT CA-96
Contract Number: C03279
Contract Name: PLAINFIELD ER P24-2(610)
VERMONT
AGENCYOFTRANSPORTATION
PROPOSAL
STANDARDSPECIFICATIONSFORCONSTRUCTION
DATED2024SHALLAPPLYTOTHISCONTRACT
SPECIALPROVISIONS
SCHEDULEOFITEMS
ELECTRONICBIDBONDtobesubmittedintheamountof5%oftheContractor'sbid.
BIDDINGPROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregulariftheyarenotincompliancewithAgencyspecifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
Systemservices.
VTransMissionandVision
Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods.
Asafe,reliable,andmultimodaltransportationsystemthatgrowstheeconomy,isaffordabletouseand
operate,andservesvulnerablepopulations.
Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
203-0003 AGGREGATES ________________________________________________________ 15
404 Corps of Engineers Permit ____________________________________________________ 16
State Wetland Permit ____________________________________________________________ 73
ANR RME Consultation _________________________________________________________ 81
Impact Plans ___________________________________________________________________ 83
Required Contract Provisions for Federal Aid Construction Contracts FHWA 1273 ___________ 86
USDOL Davis Bacon Wage Rates 2026 - Washington County ____________________________100
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 105
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 110
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 120
Standard Federal EEO Construction Contract Specifications _____________________________ 123
Contractor EEO Certification Form - CA109 _________________________________________ 130
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 131
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 135
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 136
Proposal Schedule of Pay Items ____________________________________________________ 137
Plainfield ER P24-2(610)
PIN Number(s): 24d034 Advertised April 29, 2026
Special Provisions Part I - Notices to Bidders Page 1
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS - CONTRACT COMPLETION DATE. This Contract shall be completed
on or before June 1, 2027.
2. NOTICE TO BIDDERS - INTERIM COMPLETION DATE. The Contractor shall complete all
stone fill, granular filter and guardrail installation in Plainfield on or before November 13th, 2026.
If the site cannot be planted by November 13th, grubbings, erosion control matting, seed, and
plantings shall be installed in the following spring, no later than June 1, 2027.
If this interim completion date is not met, liquidated damages in the amount of 85% of the
applicable rate specified in Table 108.12A will be assessed in accordance with Subsection
108.12(b).
3. NOTICE TO BIDDERS - PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of the Contract awarding process.
4. NOTICE TO BIDDERS - ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
https://outside.vermont.gov/agency/vtrans/external/docs/construction/Contracting/DocExpressOv
erviewforContractors.docx.
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.
Plainfield ER P24-2(610) Advertised April 29, 2026
Special Provisions Part I - Notices to Bidders Page 2
5. NOTICE TO BIDDERS - ELECTRONIC TICKETING VTRANS PORTAL. The Contractor
is hereby notified that the Contractor, their subcontractors, and suppliers shall connect to the
VTrans Portal and use the application for distribution and management of electronic tickets (e-
tickets). VTrans Portal is a state cloud-based e-ticket database, including a web-based user
interface and a jobsite mobile e-ticket application. VTrans Portal will interface with the
Contractor's supplier existing point of sales or e-ticketing platform and will allow VTrans to
manage bituminous material e-tickets.
All costs associated with the use of VTrans Portal will be considered incidental to the appropriate
Section 406 and Section 407 pay items. The Agency will manage the VTrans Portal application
including Contract setup upon Contract execution.
To create an account, connect to the VTrans Portal, and for more information regarding the use of
VTrans Portal see the information at the following link: https://www.haulhub.com/vermont-
agency-transport-22/
6. NOTICE TO BIDDERS - CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract Administration
Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time on May
13, 2026. Inquiries received prior to this time will receive a response from the Agency. Inquiries
received after this time may receive a response at the Agency's discretion.
7. NOTICE TO BIDDERS - OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
404 Corps of Engineers Permit
State Wetland Permit
ANR RME Consultation
Impact Plans
FHWA 1273 - Required Contract Provisions for Federal Aid Construction Contracts
USDOL Davis Bacon Wage Rates by County
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements - CR-110
Attachment C - Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances Appendices A, E
Standard Federal Equal Employee Opportunity (EEO) Construction Contract Specifications CA26
Contractor Equal Employment Opportunity (EEO) Certification Form - CA109
Vermont Agency of Transportation Certificate of Compliance - CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates - CA101
Commodity Index Prices - CA170
Schedule of Pay Items
Plainfield ER P24-2(610) Advertised April 29, 2026
Special Provisions Part I - Notices to Bidders Page 3
8. NOTICE TO BIDDERS - NEW PREQUALIFICATION FORM. The Contractor is hereby
notified that the Agency is required by the U.S. Department of Transportation to develop and
maintain a list of information about all firms that bid on federally funded Contracts in accordance
with 49 C.F.R. 26.11. The Agency has developed a new electronic form to collect this
information. The Contractor shall fill out this form as part of their project-specific prequalification
for every Contract that they bid on. A link to this form is provided in the prequalification form
available through iCX and the Agency's website.
9. NOTICE TO BIDDERS - DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are applicable to this Contract. Copies of the applicable rates are included in this proposal.
10. NOTICE TO BIDDERS - STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/resources/cadd/VAOTconSTD_Name.xml?_gl=1*6cpy62*
_ga*MTU5MTQ3NTcyNi4xNzIwMjM5NjI0*_ga_V9WQH77KLW*czE3NTI3NTYyMzQkbzE
3NCRnMSR0MTc1Mjc1NjkwMyRqNjAkbDAkaDA.
11. NOTICE TO BIDDERS - INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist
(b) Geotechnical Report - Emergency Sheeting
(c) Geotechnical Report - Subsurface Explorations
12. NOTICE TO BIDDERS - SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting
13. NOTICE TO BIDDERS - ENVIRONMENTAL COMMITMENTS.
(a) Threatened, Endangered, and Rare Species. The Contractor shall ensure all personnel
working on the project site are made aware of the potential presence and protected status
of the state and federal listed bats. No suitable bat habitat is present within the project
limits, and no Time-of-Year (TOY) restrictions are required.
Plainfield ER P24-2(610) Advertised April 29, 2026
Special Provisions Part I - Notices to Bidders Page 4
The Contractor is hereby made aware of the potential for TOY restrictions related to
proposed off-site activities. Cutting trees 3" DBH inches in diameter outside of the
contract project limits shall require review under Section 105.25 Opening Off-Site Activity
Areas.
(b) Invasive Material. If invasive species are delineated on the Plans or found in the project
area and confirmed by the Engineer, the invasive species, and any soil excavated from
areas that contained the invasive species, will be termed invasive material.
The Contractor shall handle the invasive material in accordance with the VTrans State
Highway System Roadside Terrestrial Invasive Plants Best Management Practices
(BMPs). The Contractor shall stockpile the invasive material separately from other soil
stockpile areas. A ground barrier and perimeter containment system shall be in place
around the area intended for stockpiling the invasive material. Equipment shall be cleaned
of all soil and plant matter prior to arriving on site in accordance with Subsection 107.06.
The equipment used for excavation and transport of invasive material shall be cleaned of
all soil and plant matter before being used for work in other areas in accordance with the
BMPs.
To the extent possible, invasive material shall be reused on site. Invasive material shall
only be reused on site in areas where the presence of the invasive species were clearly
evident. If there is an excess of invasive material, it shall be wasted in accordance with the
BMPs.
The cost of excavating invasive material will be paid for under the appropriate Contract
excavation items. When invasive species are delineated on the Plans, the additional cost
for handling invasive material, following the BMPs, cleaning equipment, and wasting
excess invasive material will be incidental to all other Contract items. When invasive
species are not delineated on the Plans, and compensation is not otherwise provided for in
the Contract, the work of handling invasive material, following the BMPs, cleaning
equipment, and wasting excess invasive material will be considered extra work in
accordance with Subsection 104.03 and will be paid for in accordance with Subsection
109.06.
14. NOTICE TO BIDDERS - UTILITIES. Existing aerial facilities owned by Consolidated
Communications and FirstLight Fiber will be adjusted, as necessary, by employees or agents of
the above companies in accordance with the aerial relocation route shown on the project plans.
The Contractor is cautioned to protect these facilities from damage.
Contacts for the above listed companies are as follows:
Consolidated Communications Travis Andrews (603) 953-3678
Plainfield ER P24-2(610) Advertised April 29, 2026
Special Provisions Part I - Notices to Bidders Page 5
FirstLight Fiber Bill Gray (802) 373-4319
There are areas of underground utilities that may require additional locating beyond normal dig
safe measures The Contractor is hereby notified that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
"204.2200, Trench Excavation of Earth, Exploratory, (N.A.B.I)."
Employees or agents of the above listed companies are to be allowed free and full access within
the project limits with the tools, materials, and equipment necessary to install, operate, maintain,
place, replace, relocate, and remove their facilities.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09.
The Contractor shall notify the utility pole owner if excavation will be within 10 feet of an existing
pole. The pole owner may choose to be onsite for this activity. There will be no excavation allowed
within 5 feet of existing poles and anchoring.
Vermont Statutes Annotated, Title 30, Chapter 86 ("Dig Safe") requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency's Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency's underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is hereby notified that many towns are not members of Dig Safe. It is the
Contractor's responsibility to check with towns prior to excavation and protect and restore utilities
damaged within the project and as set forth in Subsection 107.12.
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor's Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations, and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
| Project | Contractor | Anticipated Contract | ||
|---|---|---|---|---|
| Completion Date | ||||
| Plainfield ER P24-3(601) | TBD | Dec 2027 | ||
| Plainfield ER P24-3(650) | TBD | Dec 2027 | ||
| Plainfield ER P24-3(651) | TBD | Dec 2027 |
Plainfield ER P24-2(610) Advertised April 29, 2026
Special Provisions Part I - Notices to Bidders Page 6
15. NOTICE TO BIDDERS - CONCURRENT CONSTRUCTION. The Contractor is made aware of
the following VTrans construction project(s) which are expected to be in progress within the area
of this project during its construction.
TABLE 1 - CONCURRENT CONSTRUCTION PROJECTS
Anticipated Contract
Project Contractor
Completion Date
Plainfield ER P24-3(601) TBD Dec 2027
Plainfield ER P24-3(650) TBD Dec 2027
Plainfield ER P24-3(651) TBD Dec 2027
This list is not all-inclusive and it is possible there may be other VTrans, municipal, or private
construction projects within the area of this project during its construction.
The Contractor shall coordinate construction schedules and traffic control with the work required
for these projects.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around these or other projects.
16. NOTICE TO BIDDERS - SALVAGED MATERIALS. The Contractor is hereby notified that
existing jersey barriers presently on site shall remain the property of the State.
All costs for loading and delivering these salvaged materials will be incidental to Contract item
621.0200 Remove and Reset Temporary Traffic Barrier.
The Contractor shall load all the salvaged materials (approximately 160 LF) onto suitable transport
and deliver them to the VTrans District 6 garage at 1876 VT-214, North Montpelier, VT 05666.
The Contractor shall contact Michelle Redmond [Tel.: (802) 291-3938] or Gregory Smith [Tel.:
(802) 299-5274] a minimum of 2 weeks prior to beginning delivery to the designated location.
17. NOTICE TO BIDDERS - SPECIAL CONSTRUCTION REQUIREMENTS.
(a) During construction it will be necessary for the Contractor to maintain one-lane traffic for
extended periods of time. In no case shall the paved width for this one-lane traffic,
including shoulders, be reduced to less than 15 feet. This paved width shall remain free of
obstructions and obstacles at all times.
Plainfield ER P24-2(610) Advertised April 29, 2026
Special Provisions Part I - Notices to Bidders Page 7
(b) The Contractor shall position Portable Changeable Message Signs at locations determined
by the Engineer properly warning motorists of the roadway conditions ahead. As directed
by the Engineer, these locations may change during construction as needs arise based on
daily work activities. The message to be displayed shall be submitted to the Engineer in
advance for approval. The displayed message should accurately reflect what motorists can
expect to encounter through the project area. The cost of providing the Portable Changeable
Message Signs will be paid for under Contract item 641.1500 or 641.1700, as applicable.
The Contractor shall also install and maintain appropriate construction signing warning the
traveling public of the expected roadway surface conditions.
(c) There may be special events throughout the year that may require close communication
and coordination between the Contractor and the municipality to reduce conflicts. The
municipality will advise the Engineer and Contractor of the specifics of each event and the
Engineer will direct the Contractor as to what actions, if any, will be necessary on the
Contractor's part to minimize impacts to the event. Special events that may conflict with
Contractor operations are not limited to those which may be listed in this Notice to Bidders.
There will be no extra compensation paid to the Contractor for any inconvenience caused
by working around any unlisted special events.
For more information about area special events, contact the following:
Plainfield: Jaime Hammack
Town Clerk
Town of Plainfield
149 Main St.
P.O. Box 217
townclerk@plainfieldvt.gov
802-454-8461
18. NOTICE TO BIDDERS - SUBSECTION 103.04(e). Subsection 103.04(e) is hereby modified by
deleting the sentence "Limits of coverage shall not be less than $2,000,000 per occurrence or claim
and $2,000,000 in the aggregate." from the second paragraph and replacing it with the sentence
"Limits of coverage shall not be less than $1,000,000 per occurrence or claim and $1,000,000 in
the aggregate.".
19. NOTICE TO BIDDERS - SUBSECTION 105.11(b). Subsection 105.11(b) is hereby modified by
being deleted in its entirety and replaced with the following:
(b) Permanent Marking Layout. The Contractor shall be responsible for the layout of the
permanent traffic markings in accordance with the Plans. The Engineer will verify the
layout of the permanent traffic markings, including passing zones and breaks for town
highways.
| Original Contract Amount | Daily Charge per Working Day of Delay | |
|---|---|---|
| From More Than | To and Including | |
| $0 | $1,500,000 | $3,200 |
| $1,500,000 | $3,000,000 | $3,400 |
| $3,000,000 | $5,000,000 | $3,600 |
| $5,000,000 | $10,000,000 | $4,100 |
| $10,000,000 | $15,000,000 | $4,700 |
| $15,000,000 | $20,000,000 | $5,200 |
| $20,000,000 | -- | $5,800 |
| Daily Charge per |
|---|
| Working Day of Delay |
Plainfield ER P24-2(610) Advertised April 29, 2026
Special Provisions Part I - Notices to Bidders Page 8
20. NOTICE TO BIDDERS - TABLE 108.12A. Table 108.12A is hereby modified by being deleted
in its entirety and replaced with the following:
TABLE 108.12A - DAILY LIQUIDATED DAMAGES CHARGE PER WORKING DAY OF
DELAY
Original Contract Amount
Daily Charge per
Working Day of Delay
From More Than To and Including
$0 $1,500,000 $3,200
$1,500,000 $3,000,000 $3,400
$3,000,000 $5,000,000 $3,600
$5,000,000 $10,000,000 $4,100
$10,000,000 $15,000,000 $4,700
$15,000,000 $20,000,000 $5,200
$20,000,000 -- $5,800
21. NOTICE TO BIDDERS - SUBSECTION 621.14. Subsection 621.14 is hereby modified by
deleting the second paragraph in its entirety.
22. NOTICE TO BIDDERS - SUBSECTION 621.15. Subsection 621.15 is hereby modified by
adding the word "anchors" to the first paragraph, immediately after the phrase "...for removing
and disposing of materials, including...".
23. NOTICE TO BIDDERS - SUBSECTION 621.15. Subsection 621.15 is hereby further modified
by deleting the second paragraph in its entirety.
24. NOTICE TO BIDDERS - SUBSECTION 621.15. Subsection 621.15 is hereby further modified
by adding the phrase "Steel Beam Guardrail Offset Block; Terminal Connector for Steel Beam
Guardrail; Traffic Barrier Delineator;" to the seventh paragraph, immediately after the phrase "The
accepted quantity of..." and immediately before the phrase "...Replace Guardrail Post Assembly,
W-Beam with 6 Foot Posts; Replace Guardrail Post Assembly, W-Beam with 8 Foot Posts;
Replace Guardrail Post Assembly, Box Beam; and Replace Guardrail Post Assembly, Thrie
Beam..."
25. NOTICE TO BIDDERS - SUBSECTION 621.15. Subsection 621.15 is hereby further modified
by deleting the phrase "removing and disposing of damaged guardrail components;" from the
eighth paragraph.

With GovernmentContracts, you can:
Roadway Line Striping and Markings Request Date: 7/24/2026 2:23:32 PM Open Date: Closing
State Government of Vermont
Bid Due: 8/19/2026
Bid Title: Roadway Line Stripings and Markings Category: RFPs, RFQs and Bids Status:
City of Winooski
Bid Due: 8/19/2026
SOS Next Generation Licensing Platform O&M Support Request Date: 7/27/2026 11:48:48 AM Open
State Government of Vermont
Bid Due: 8/28/2026
TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER SOS Next Generation
State of Vermont
Bid Due: 8/28/2026