HARDWICK ER P23-1(716)

Location: Vermont
Posted: Oct 21, 2026
Due: Nov 13, 2026
Agency: State of Vermont - Agency of Transportation
Type of Government: State & Local
Category:
  • 89 - Subsistence (Food)
Solicitation No: C03293
Publication URL: To access bid details, please log in.
CONSTRUCTION ADVERTISEMENTS QUESTIONS DUE PRIOR TO 4:30 PM ADDENDA BID OPENING

C03293

HARDWICK ER P23-1(716)

PROPOSAL

Geotechnical Data Report
TMP Checklist
APPROVED BIDDERS LIST

PLAN HOLDERS LIST

DOWNLOAD PLANS IN iCX

11/4/2026

11/13/2026

Attachment Preview

VTransMissionandVision
Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods.

VERMONT CA-96
Contract Number: C03293
Contract Name: HARDWICK ER P23-1(716)
VERMONT
AGENCYOFTRANSPORTATION
PROPOSAL
STANDARDSPECIFICATIONSFORCONSTRUCTION
DATED2024SHALLAPPLYTOTHISCONTRACT
SPECIALPROVISIONS
SCHEDULEOFITEMS
ELECTRONICBIDBONDtobesubmittedintheamountof5%oftheContractor'sbid.
BIDDINGPROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregulariftheyarenotincompliancewithAgencyspecifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
Systemservices.
VTransMissionandVision
Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods.
Asafe,reliable,andmultimodaltransportationsystemthatgrowstheeconomy,isaffordabletouseand
operate,andservesvulnerablepopulations.

Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
404 Corps of Engineers Permit ____________________________________________________ 10
ANR RME Consultation _________________________________________________________ 55
240-0001 TEMPORARY ROADWAY ______________________________________________ 57
Required Contract Provisions for Federal Aid Construction Contracts FHWA 1273 June 2026 __ 60
USDOL Davis Bacon Wage Rates 2026 - Caledonia County _____________________________ 72
Bidding Requirements and Conditions ______________________________________________ 76
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 88
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 93
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 103
Standard Federal EEO Construction Contract Specifications _____________________________ 106
Contractor EEO Certification Form - CA109 _________________________________________ 113
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 114
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 118
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 119
Proposal Schedule of Pay Items ____________________________________________________ 120

Hardwick ER P23-1(716)
PIN Number(s): 24d005 Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 1
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS - CONTRACT COMPLETION DATE. This Contract shall be completed
on or before October 15, 2027.
2. NOTICE TO BIDDERS - PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of the Contract awarding process.
3. NOTICE TO BIDDERS - NIGHT WORK. The Contractor is hereby notified that night work will
not be permitted on this Contract. Night will be as defined in Subsection 101.02.
4. NOTICE TO BIDDERS - ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
https://outside.vermont.gov/agency/vtrans/external/docs/construction/Contracting/DocExpressOv
erviewforContractors.docx.
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.
5. NOTICE TO BIDDERS - ELECTRONIC TICKETING VTRANS PORTAL. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall connect to the VTrans
Portal and use the application for distribution and management of electronic tickets (e-tickets).
VTrans Portal is a state cloud-based e-ticket database, including a web-based user interface and a
jobsite mobile e-ticket application. VTrans Portal will interface with the Contractor's supplier
existing point of sales or e-ticketing platform and will allow VTrans to manage bituminous
material e-tickets.

Hardwick ER P23-1(716) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 2
All costs associated with the use of VTrans Portal will be considered incidental to the appropriate
Section 406 and Section 407 pay items. The Agency will manage the VTrans Portal application
including Contract setup upon Contract execution.
To create an account, connect to the VTrans Portal, and for more information regarding the use of
VTrans Portal see the information at the following link: https://www.haulhub.com/vermont-
agency-transport-22/
6. NOTICE TO BIDDERS - CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract
Administration Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time
on November 4, 2026. Inquiries received prior to this time will receive a response from the
Agency. Inquiries received after this time may receive a response at the Agency's discretion.
7. NOTICE TO BIDDERS - OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
404 Corps of Engineers Permit
ANR RME Consultation
FHWA 1273 - Required Contract Provisions for Federal Aid Construction Contracts
USDOL Davis Bacon Wage Rates by County
Vermont Agency of Transportation Bidding Requirements and Conditions
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements - CR-110
Attachment C - Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances Appendices A and E
Standard Federal Equal Employment Opportunity Construction Contract Specifications - CA26
Contractor Equal Employment Opportunity Certification Form - CA109
Vermont Agency of Transportation Certificate of Compliance - CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates - CA101
Commodity Index Prices - CA170
Schedule of Pay Items
8. NOTICE TO BIDDERS - NEW PREQUALIFICATION FORM. The Contractor is hereby
notified that the Agency is required by the U.S. Department of Transportation to develop and
maintain a list of information about all firms that bid on federally funded Contracts in accordance
with 49 C.F.R. 26.11. The Agency has developed a new electronic form to collect this
information. The Contractor shall fill out this form as part of their project-specific prequalification
for every Contract that they bid on. A link to this form is provided in the prequalification form
available through iCX and the Agency's website.

Hardwick ER P23-1(716) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 3
9. NOTICE TO BIDDERS - DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are applicable to this Contract. Copies of the applicable rates are included in this proposal.
10. NOTICE TO BIDDERS - GENERAL SPECIAL PROVISIONS. The Contractor is hereby
notified that the most recent General Special Provisions in effect on the date of advertisement shall
apply to this Contract. The General Special Provisions may be found at the following address:
https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-
contractspecifications/vermont/2024
11. NOTICE TO BIDDERS - STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/resources/cadd/VAOTconSTD_Name.xml?_gl=1*6cpy62*
_ga*MTU5MTQ3NTcyNi4xNzIwMjM5NjI0*_ga_V9WQH77KLW*czE3NTI3NTYyMzQkbzE
3NCRnMSR0MTc1Mjc1NjkwMyRqNjAkbDAkaDA.
12. NOTICE TO BIDDERS - INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist
(b) Geotechnical Report
13. NOTICE TO BIDDERS - SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting
14. NOTICE TO BIDDERS - ENVIRONMENTAL COMMITMENTS.
(a) Threatened, Endangered, and Rare Species. The Contractor shall ensure all personnel
working on the project site are made aware of the potential presence and protected status
of the state and federal listed bats. No suitable bat habitat is present within the project limits
and no Time-of-Year (TOY) restrictions are required.
The Contractor is hereby made aware of the potential for TOY restrictions related to
proposed off-site activities. Cutting trees 3" DBH inches in diameter outside of the
contract project limits shall require review under Section 105.25 Opening Off-Site Activity
Areas.

Hardwick ER P23-1(716) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 4
15. NOTICE TO BIDDERS - UTILITIES.
Existing aerial facilities owned by Hardwick Electric Department will be adjusted, as necessary,
by employees or agents of the above companies in accordance with the "Approximate Aerial
Utility Relocation Route" shown in the Contract Plans. The Contractor is cautioned to protect
these facilities from damage.
Existing aerial facilities owned by Fidium Fiber, FirstLight Fiber, Comcast, and Vermont Electric
Power Company will not require adjustment. The Contractor is cautioned to protect these facilities
from damage.
Contacts for the above listed companies are as follows:
Hardwick Electric Dept Brian Forant (802) 472-5201
Fidium Fiber John Stempek (802) 735-4860
FirstLight Fiber Heather Araujo (978) 302-9334
Comcast Bruce Bowser (802) 316-9324
VELCO Lucas Stubbs (802) 770-9779
There are areas of underground utilities that may require additional locating beyond normal dig
safe measures. The Contractor is hereby notified that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
"204.2200, Trench Excavation of Earth, Exploratory, (N.A.B.I)."
Employees or agents of the above listed companies are to be allowed free and full access within
the project limits with the tools, materials, and equipment necessary to install, operate, maintain,
place, replace, relocate, and remove their facilities.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09.
The Contractor shall notify the utility pole owner if excavation will be within 10 feet of an existing
pole. The pole owner may choose to be onsite for this activity. There will be no excavation allowed
within 5 feet of existing poles and anchoring.

Project Contractor Anticipated Contract
Completion Date
Hardwick - Barton STP FPAV(74) TBD Fall 2027

Hardwick ER P23-1(716) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 5
Vermont Statutes Annotated, Title 30, Chapter 86 ("Dig Safe") requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency's Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency's underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is hereby notified that many towns are not members of Dig Safe. It is the
Contractor's responsibility to check with towns prior to excavation and protect and restore utilities
damaged within the project and as set forth in Subsection 107.12.
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor's Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations, and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
16. NOTICE TO BIDDERS - CONCURRENT CONSTRUCTION. The Contractor is made aware of
the following VTrans construction project(s) which are expected to be in progress within the area
of this project during its construction.
TABLE 1 - CONCURRENT CONSTRUCTION PROJECTS
Anticipated Contract
Project Contractor
Completion Date
Hardwick - Barton STP FPAV(74) TBD Fall 2027
This list is not all-inclusive and it is possible there may be other VTrans, municipal, or private
construction projects within the area of this project during its construction.
The Contractor shall coordinate construction schedules and traffic control with the work required
for these projects.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around these or other projects.

Hardwick ER P23-1(716) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 6
17. NOTICE TO BIDDERS - SPECIAL CONSTRUCTION REQUIREMENTS.
(a) During construction it will be necessary for the Contractor to maintain one-lane traffic for
extended periods of time. In no case shall the paved width for this one-lane traffic,
including shoulders, be reduced to less than 15 feet. This paved width shall remain free of
obstructions and obstacles at all times.
(b) The Contractor shall position Portable Changeable Message Signs at locations determined
by the Engineer properly warning motorists of the roadway conditions ahead. As directed
by the Engineer, these locations may change during construction as needs arise based on
daily work activities. The message to be displayed shall be submitted to the Engineer in
advance for approval. The displayed message should accurately reflect what motorists can
expect to encounter through the project area. The cost of providing the Portable Changeable
Message Signs will be paid for under Contract item 641.1500 or 641.1700, as applicable.
The Contractor shall also install and maintain appropriate construction signing warning the
traveling public of the expected roadway surface conditions.
(c) Prior to final acceptance of the project, all drop inlets, bridge downspouts, and bridge joints
within the project limits shall be cleaned and all material within the drop inlets and bridge
joints shall be removed. All paved areas adjacent to curbs shall be swept and cleaned of all
extraneous material. Costs for this work will not be paid for directly but will be considered
incidental to all Contract items.
(d) There are special events throughout the year that may require close communication and
coordination between the Contractor and the municipality to reduce conflicts. The
municipality will advise the Engineer and Contractor of the specifics of each event and the
Engineer will direct the Contractor as to what actions, if any, will be necessary on the
Contractor's part to minimize impacts to the event. Special events that may conflict with
Contractor operations are not limited to those which may be listed in this Notice to Bidders.
There will be no extra compensation paid to the Contractor for any inconvenience caused
by working around any listed or unlisted special events.
For more information about area special events, contact the following:
Hardwick: David Upson
Town Manager
Town of Hardwick
20 Church St.
david.upson@hardwickvt.gov
802-472-6120

Hardwick ER P23-1(716) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 7
18. NOTICE TO BIDDERS - AFAD. The Contractor is hereby notified that Automated Flagger
Assistance Devices (AFADs) are remotely operated devices that enable a certified flagger to be
positioned out of the lane of traffic and are used to control motorists through work zones.
AFADs shall only be used in situations where there is no more than one lane of approaching traffic
that needs to be controlled. Additionally, since AFADs are not traffic control signals, they shall
not be used to replace traffic signals or other continuously operating traffic control devices.
These devices may be used as a safety enhancement to flaggers on an hour-for-hour basis. AFADs
shall meet the following requirements:
(a) All AFAD applications shall meet the requirements of the applicable sections of the current
edition of the Manual on Uniform Traffic Control Devices (MUTCD).
(b) All AFAD applications shall be in accordance with NCHRP Report 350 or the MASH for
the applicable test level and device weight. Documentation of the crashworthiness of the
device shall be submitted to the Engineer for approval prior to use on the project.
(c) AFAD applications shall always be controlled by a flagger who has been trained in the
operation of the AFAD and who meets the requirements of Section 630. The flagger shall
not flag traffic and operate an AFAD at the same time.
(d) Should an AFAD malfunction or otherwise not function as intended they shall be replaced
by another AFAD or flagger(s) or work shall cease and the roadway shall be opened to
unrestricted traffic flow immediately.
(e) Each AFAD will be considered equivalent to one flagger and will be measured and paid
for on an hourly basis under Item 630.1500 Flaggers. One hour of AFAD use shall be paid
for as one hour of flagging.
(f) Flaggers will only be measured for payment when actually performing flagging duties.
Flaggers controlling AFADs but not actually flagging will not be measured for payment,
but will be considered incidental to the Contract lump sum price for Item 641.1000 Traffic
Control, or Item 641.1100 Traffic Control, All-Inclusive, as applicable.
(g) The use of AFADs may be suspended at the discretion of the Engineer.
19. NOTICE TO BIDDERS - SUBSECTION 101.02. Subsection 101.02 is hereby modified by
revising the definition of "Contract" to add the phrase "General Special Provisions" immediately
following the phrase "Standard Specifications".
20. NOTICE TO BIDDERS - SUBSECTION 728.02. When material is supplied in accordance with
Subsection 728.02(b) or Subsection 728.02(e), material in accordance with AASHTO M 180-18 or
AASHTO M 180-23 may be substituted in place of material meeting AASHTO M 180-25.

State of Vermont Agency of Transportation
Highways- PDB Environmental Section
219 N. Main Street
Barre, VT 05641
Memorandum
To: Project File
From: Sophia Seman, VTrans Biologist
Date: 11/10/2025
Subject: US Corps of Engineers (USCOE) General Permit Self Verification Memo
I have reviewed project Hardwick ER P23-1(716) for potential impacts to USCOE jurisdictional areas (wetlands
and waterways). I have determined the project qualifies for Self-Verification (SV) under the COE VT General
Permit NAE-2022-00024. All General Conditions (conditions 1-38 pages 27-38,) of the VTGP apply to this
project and a copy of the permit will need to be included in the contract documents. Respective Contractors
completing work authorized under this VTGP need to be familiar with all conditions of this permit. Please pay
particular attention to conditions 19 & 20 as there are important in-stream time of year restrictions and culvert
requirements under the SV process, as well as other special requirements. The VTGP is effective from
December 6, 2022, through December 6, 2027.
If the Contractor proposes modified or additional project limits, the project may no longer qualify for coverage
under the SV process. It is the Contractor's responsibility to seek coverage of any project changes under the SV
process, VTGP, or with a USCOE Individual Permit. Please contact the USCOE at (802) 872-2893 for any
questions.
Attached
COE VT GP NAE 2022-00024
USCOE VT Project Office Contact:
U.S. Army Corps of Engineers
New England District,
Vermont Project Office
11 Lincoln Street, Room 210
Essex Junction, Vermont 05452
(802) 872-2893, (802) 879-7638 fax
www.nae.usace.army.mil/missions/regulatory
cenae-r-vt@usace.army.mil

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Construction Services for Richford LPOE, Vermont Active Contract Opportunity Notice ID... - ...

GENERAL SERVICES ADMINISTRATION

Bid Due: 12/24/2026

...Construction Management Services for a New Public Works Facility Request Date: 11/16/2026 3:02:03... ...

State Government of Vermont

Bid Due: 12/18/2026

...: Bridge Repair and Construction Bid Description: REMOVAL AND REPLACEMENT OF EXISTING STEEL.../bids-requests/construction-contracting ...

State Government of Vermont

Bid Due: 12/04/2026

...: Bennington Keywords: Bridge Repair and Construction Bid Description: Replacement of existing bridge.../bids-requests/construction-contracting ...

State Government of Vermont

Bid Due: 11/20/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.