| Location: | Vermont |
|---|---|
| Posted: | Oct 21, 2026 |
| Due: | Nov 13, 2026 |
| Agency: | State of Vermont - Agency of Transportation |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | C03267 |
| Publication URL: | To access bid details, please log in. |
| CONSTRUCTION ADVERTISEMENTS | QUESTIONS DUE PRIOR TO 4:30 PM | ADDENDA | BID OPENING |
|
C03267 NORWICH-BRADFORD IM 091-2(99) PROPOSAL TMP Checklist APPROVED BIDDERS LIST PLAN HOLDERS LIST DOWNLOAD PLANS IN iCX |
11/4/2026 |
11/13/2026 |
| VTransMissionandVision | |
|---|---|
| Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods. |
VERMONT CA-96
Contract Number: C03267
Contract Name: NORWICH-BRADFORD IM 091-2(99)
VERMONT
AGENCYOFTRANSPORTATION
PROPOSAL
STANDARDSPECIFICATIONSFORCONSTRUCTION
DATED2024SHALLAPPLYTOTHISCONTRACT
SPECIALPROVISIONS
SCHEDULEOFITEMS
ELECTRONICBIDBONDtobesubmittedintheamountof5%oftheContractor'sbid.
BIDDINGPROCEDURE
Bid Proposals will not be read unless accompanied by an electronic bid bond, and they may be rejected as
irregulariftheyarenotincompliancewithAgencyspecifications.
NOTE: All bid proposals shall be properly filled out and submitted electronically utilizing iCX Web
Systemservices.
VTransMissionandVision
Throughexcellentcustomerservice,provideforthesafeandefficientmovementofpeopleandgoods.
Asafe,reliable,andmultimodaltransportationsystemthatgrowstheeconomy,isaffordabletouseand
operate,andservesvulnerablepopulations.
Cover Page Proposal ____________________________________________________________ 1
Table of Contents _______________________________________________________________ 2
Project Special Provisions ________________________________________________________ 3
Required Contract Provisions for Federal Aid Construction Contracts FHWA 1273 June 2026 __ 12
USDOL Davis Bacon Wage Rates 2026 - Orange County _______________________________ 24
USDOL Davis Bacon Wage Rates 2026 - Windsor County ______________________________ 28
Bidding Requirements and Conditions ______________________________________________ 32
DBE Policy Required Contract Requirements CR110 - 2026 _____________________________ 44
Attachment C - Standard State Contract and Grant Provisions Rev 2-13-26 _________________ 49
USDOT Standard Title VI Nondiscrim Assurances Appendix A and E _____________________ 59
Standard Federal EEO Construction Contract Specifications _____________________________ 62
Contractor EEO Certification Form - CA109 _________________________________________ 69
Vermont AOT Certificate of Compliance - CA271 _____________________________________ 70
Vermont AOT Minimum Labor and Truck Rates - CA101 _______________________________ 74
Commodity Index Prices CA170 - Spec Book 2024 ____________________________________ 75
Proposal Schedule of Pay Items ____________________________________________________ 76
Norwich-Bradford IM 091-2(99)
PIN Number(s): 24v008 Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 1
SPECIAL PROVISIONS
1. NOTICE TO BIDDERS - CONTRACT COMPLETION DATE. This Contract shall be completed
on or before October 15, 2027.
2. NOTICE TO BIDDERS - PROHIBITION OF RUSSIAN GOODS. The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3rd, 2022, the
purchase of Russian-sourced goods and goods produced by Russian entities (defined as institutions
or companies that are headquartered in Russia or have their principal place of business in Russia)
is prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of Contract awarding process.
3. NOTICE TO BIDDERS - ELECTRONIC DOCUMENT MANAGEMENT. The Contractor is
hereby notified that the Contractor, their subcontractors, and suppliers shall create both a Doc
Express and an iCXWeb account. The Contractor shall use these applications for collection and
management of electronic documents. Doc Express can be accessed at the following link:
https://docexpress.com. iCXWeb can be accessed at the following link:
vtrans.exevision.com/icx/Index.aspx.
All costs associated with the use of Doc Express and iCXWeb will be considered incidental to
Item 635.1100, Mobilization/Demobilization. The State will manage the applications including
Contract setup upon Contract execution.
To create an account and for more information regarding the use of Doc Express see the
information at the following link:
https://outside.vermont.gov/agency/vtrans/external/docs/construction/Contracting/DocExpressOv
erviewforContractors.docx.
To create an account and for more information regarding the use of iCXWeb see the information
at the following link: https://vtrans.vermont.gov/icx.
4. NOTICE TO BIDDERS - ELECTRONIC TICKETING VTRANS PORTAL. The Contractor
is hereby notified that the Contractor, their subcontractors, and suppliers shall connect to the
VTrans Portal and use the application for distribution and management of electronic tickets (e-
tickets). VTrans Portal is a state cloud-based e-ticket database, including a web-based user
interface and a jobsite mobile e-ticket application. VTrans Portal will interface with the
Contractor's supplier existing point of sales or e-ticketing platform and will allow VTrans to
manage bituminous material e-tickets.
Norwich-Bradford IM 091-2(99) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 2
All costs associated with the use of VTrans Portal will be considered incidental to the appropriate
Section 406 and Section 407 pay items. The Agency will manage the VTrans Portal application
including Contract setup upon Contract execution.
To create an account, connect to the VTrans Portal, and for more information regarding the use of
VTrans Portal see the information at the following link: https://www.haulhub.com/vermont-
agency-transport-22
5. NOTICE TO BIDDERS - CONTACT WITH THE AGENCY. From the time of advertising until
the actual bid opening for this Contract, all prospective Contractors, subcontractors, and suppliers
shall direct all inquiries related to this Contract solely to the Agency's Contract Administration
Section at AOT.ConstructionContractingInquiry@vermont.gov.
The deadline for submitting inquiries related to this Contract is 4:30 p.m. Eastern Time on
November 4, 2026. Inquiries received prior to this time will receive a response from the Agency.
Inquiries received after this time may receive a response at the Agency's discretion.
6. NOTICE TO BIDDERS - OTHER SPECIFICATIONS AND CONTRACT REQUIREMENTS.
FHWA 1273 - Required Contract Provisions for Federal Aid Construction Contracts
USDOL Davis Bacon Wage Rates by County
Vermont Agency of Transportation Bidding Requirements and Conditions
Disadvantaged Business Enterprise (DBE) Policy Contract Requirements - CR-110
Attachment C - Standard State Provisions for Contracts and Grants
USDOT Standard Title VI Nondiscrimination Assurances Appendices A and E
Standard Federal Equal Employment Opportunity Construction Contract Specifications - CA26
Contractor Equal Employment Opportunity Certification Form - CA109
Vermont Agency of Transportation Certificate of Compliance - CA271
Vermont Agency of Transportation Minimum Labor and Truck Rates - CA101
Commodity Index Prices - CA170
Schedule of Pay Items
7. NOTICE TO BIDDERS - NEW PREQUALIFICATION FORM. The Contractor is hereby
notified that the Agency is required by the U.S. Department of Transportation to develop and
maintain a list of information about all firms that bid on federally funded Contracts in accordance
with 49 C.F.R. 26.11. The Agency has developed a new electronic form to collect this
information. The Contractor shall fill out this form as part of their project-specific prequalification
for every Contract that they bid on. A link to this form is provided in the prequalification form
available through iCX and the Agency's website.
Norwich-Bradford IM 091-2(99) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 3
8. NOTICE TO BIDDERS - DAVIS-BACON. U.S. Department of Labor Davis-Bacon wage rates
are applicable to this Contract. Copies of the applicable rates are included in this proposal.
9. NOTICE TO BIDDERS - GENERAL SPECIAL PROVISIONS. The Contractor is hereby
notified that the most recent General Special Provisions in effect on the date of advertisement shall
apply to this Contract. The General Special Provisions may be found at the following address:
https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-
contractspecifications/vermont/2024
10. NOTICE TO BIDDERS - STANDARD DRAWINGS. The Vermont Agency of Transportation
Standard Drawings listed on the Index of Sheets are not included in the plan set, but may be found
at the following address:
https://resources.vtrans.vermont.gov/resources/cadd/VAOTconSTD_Name.xml?_gl=1*6cpy62*
_ga*MTU5MTQ3NTcyNi4xNzIwMjM5NjI0*_ga_V9WQH77KLW*czE3NTI3NTYyMzQkbzE
3NCRnMSR0MTc1Mjc1NjkwMyRqNjAkbDAkaDA.
11. NOTICE TO BIDDERS - INFORMATIONAL DOCUMENTS. The Contractor is hereby notified
that the following informational documents for this Contract are available on iCXWeb and the
VTrans Bid Opportunities website. These documents are being provided during the bid solicitation
period for informational purposes only.
(a) Traffic Management Plan (TMP) Checklist
12. NOTICE TO BIDDERS - SURFACE WATER WITHDRAWAL. The Contractor is hereby
notified that the Vermont state law, Act 135 of 2022, requires any person withdrawing surface
water (as defined in 10 V.S.A. 1002 (20)) to register with and report the water withdrawal and
usage to the Vermont Department of Environmental Conservation beginning January 1, 2023.
Guidance can be found here: https://dec.vermont.gov/watershed/rivers/streamflow-protection/act-
135-surface-water-withdrawal-registration-and-reporting
13. NOTICE TO BIDDERS - ENVIRONMENTAL COMMITMENTS.
(a) Threatened, Endangered, and Rare Species. The Contractor shall ensure all personnel
working on the project site are made aware of the potential presence and protected status
of state and federal listed bats. No suitable bat habitat is present within the project limits
and no Time-of-Year (TOY) restrictions are required.
The Contractor is hereby made aware of the potential for TOY restrictions related to
proposed off-site activities. Cutting trees 3" DBH inches in diameter outside of the
contract project limits shall require review under Section 105.25 Opening Off-Site Activity
Areas.
Norwich-Bradford IM 091-2(99) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 4
(b) Invasive Material. If invasive species are delineated on the Plans or found in the project
area and confirmed by the Engineer, the invasive species, and any soil excavated from
areas that contained the invasive species, will be termed invasive material.
The Contractor shall handle the invasive material in accordance with the VTrans State
Highway System Roadside Terrestrial Invasive Plants Best Management Practices
(BMPs). The Contractor shall stockpile the invasive material separately from other soil
stockpile areas. A ground barrier and perimeter containment system shall be in place
around the area intended for stockpiling the invasive material. Equipment shall be cleaned
of all soil and plant matter prior to arriving on site in accordance with Subsection 107.06.
The equipment used for excavation and transport of invasive material shall be cleaned of
all soil and plant matter before being used for work in other areas in accordance with the
BMPs.
To the extent possible, invasive material shall be reused on site. Invasive material shall
only be reused on site in areas where the presence of the invasive species were clearly
evident. If there is an excess of invasive material, it shall be wasted in accordance with the
BMPs.
The cost of excavating invasive material will be paid for under the appropriate Contract
excavation items. When invasive species are delineated on the Plans, the additional cost
for handling invasive material, following the BMPs, cleaning equipment, and wasting
excess invasive material will be incidental to all other Contract items. When invasive
species are not delineated on the Plans, and compensation is not otherwise provided for in
the Contract, the work of handling invasive material, following the BMPs, cleaning
equipment, and wasting excess invasive material will be considered extra work in
accordance with Subsection 104.03 and will be paid for in accordance with Subsection
109.06.
14. NOTICE TO BIDDERS - UTILITIES. Existing underground and aerial facilities owned by Green
Mountain Power, Velco, Consolidated Communications, ECFiber, will not require adjustment.
The Contractor is cautioned to protect these facilities from damage.
Contacts for the above listed companies are as follows:
Velco Lucas Stubbs (802)770-9779
Green Mountain Power Evan Eccher (802) 417-8950
Consolidated Communications Eric Seward (802) 747-0567
ECFiber Dannielle Mumma (802) 763-2262
Employees or agents of the above listed companies are to be allowed free and full access within
the project limits with the tools, materials, and equipment necessary to install, operate, maintain,
place, replace, relocate, and remove their facilities.
Norwich-Bradford IM 091-2(99) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 5
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around and with the companies, or their facilities. Should the Contractor desire additional
adjustments of the utility facilities for his/her convenience, proper arrangements shall be made in
conformance with Subsection 105.09.
There are areas of underground utilities that may require additional locating beyond normal dig
safe measures. The Contractor is hereby notified that exploratory excavation to locate existing
underground facilities may be necessary to protect these facilities from damage. Where approved
by the Engineer, these utilities shall be located and/or exposed by methods such as air/vacuum
excavation and/or hand digging to determine their exact location. This exploratory work shall be
classified as Trench Excavation of Earth, Exploratory and payment shall be through Pay Item
"204.2200, Trench Excavation of Earth, Exploratory, (N.A.B.I)."
The Contractor shall notify the aerial utility pole owner if excavation is within 10 feet of an existing
pole. That pole owner may choose to be onsite for this activity. There will be no excavation
allowed within 5 feet of existing poles and anchoring.
Vermont Statutes Annotated, Title 30, Chapter 86 ("Dig Safe") requires notice to Dig Safe before
starting excavation activities. The Contractor must telephone Dig Safe at 811 at least 72 hours
(excluding Saturdays, Sundays, and legal holidays) before, but not more than 30 days before,
starting excavation activities at any location. In addition, before excavation and/or pavement
grinding in or on the state highway right-of-way, the Contractor must contact the Agency's Traffic
Signal Superintendent, Dan Ertel, to obtain/verify the location of Agency's underground utility
facilities or to confirm the absence of such facilities. Dan can be reached at (802) 343-2188.
The Contractor is advised that many towns are not members of Dig Safe. It is the Contractor's
responsibility to check with towns prior to excavation and shall protect and restore utilities
damaged within the project and as set forth in Subsection 107.12.
All Contractors, subcontractors or material suppliers involved in any project-related activity shall
comply with all applicable codes and regulations related to working around live electrical lines;
including, but not limited to maintaining the required minimum clear distance from an electrical
utility facility. The Contractor's Competent Safety Officer shall be well versed in OSHA and
VOSHA regulations and shall be capable of implementing a plan to conform to these regulations
during prosecution of work.
15. NOTICE TO BIDDERS - CONCURRENT CONSTRUCTION. The Contractor is made aware of
the following VTrans construction project(s) which are expected to be in progress within the area
of this project during its construction.
| Project | Contractor | Anticipated | ||
|---|---|---|---|---|
| Contract | ||||
| Completion Date | ||||
| NORWICH BM26411 FAIRLEE BM26701 FAIRLEE IM 091-2(91) BRADFORD-ST. JOHNSBURY STPG SGNL(66) | TBD TBD TBD TBD | 2028 2028 NOV 2028 NOV 2028 |
Norwich-Bradford IM 091-2(99) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 6
TABLE 1 - CONCURRENT CONSTRUCTION PROJECTS
Anticipated
Project Contractor Contract
Completion Date
NORWICH BM26411 TBD 2028
FAIRLEE BM26701 TBD 2028
FAIRLEE IM 091-2(91) TBD NOV 2028
BRADFORD-ST. JOHNSBURY STPG SGNL(66) TBD NOV 2028
This list is not all-inclusive and it is possible there may be other VTrans, municipal, or private
construction projects within the area of this project during its construction.
The Contractor shall coordinate construction schedules and traffic control with the work required
for these projects.
There will be no extra compensation paid to the Contractor for any inconvenience caused by
working around these or other projects.
16. NOTICE TO BIDDERS - SALVAGED MATERIALS. The Contractor is hereby notified that 500
tons of fine-millings and 500 linear feet of guardrail removed and not re-used on the project shall
remain the property of the State.
All costs for loading and delivering these salvaged materials will be incidental to Contract item
210.1200, Fine-Milling Bituminous Pavement, and 621.0100 Removal of Guardrail.
The Contractor shall load 250 tons of fine-milled grindings, and 250 linear feet of guardrail
removed and not re-used on the project onto suitable transport and deliver them to the VTrans
Thetford garage at 1333 VT Route 113, Thetford, VT 05043.
The Contractor shall contact Daryl Benson, Transportation Area Maintenance Supervisor [Tel.:
(802) 356-4433] a minimum of 2 weeks prior to beginning delivery to the designated location.
The Contractor shall load 250 tons of fine-milled grindings, and 250 linear feet of guardrail
removed and not re-used on the project onto suitable transport and deliver them to the VTrans
Bradford garage at 57 Fairground Road, Bradford, Vermont 05033.
The Contractor shall contact Lance Duquette, AOT District Transportation Administrator [Tel.:
(802) 748-6670] a minimum of 2 weeks prior to beginning delivery to the designated location.
17. NOTICE TO BIDDERS - SPECIAL CONSTRUCTION REQUIREMENTS.
(a) The Contractor shall maintain a safe access to all ramps and U-turns at all times during the
construction of this project.
Norwich-Bradford IM 091-2(99) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 7
(b) During construction it will be necessary for the Contractor to maintain one-lane traffic for
extended periods of time. In no case shall the paved width for this one-lane traffic,
including shoulders, be reduced to less than 12 feet. This paved width shall remain free of
obstructions and obstacles at all times.
(c) The Contractor shall position Portable Changeable Message Signs at locations determined
by the Engineer properly warning motorists of the roadway conditions ahead. As directed
by the Engineer, these locations may change during construction as needs arise based on
daily work activities. The message to be displayed shall be submitted to the Engineer in
advance for approval. The displayed message should accurately reflect what motorists can
expect to encounter through the project area. The cost of providing the Portable Changeable
Message Signs will be paid for under Contract item 641.1500 or 641.1700, as applicable.
The Contractor shall also install and maintain appropriate construction signing warning the
traveling public of the expected roadway surface conditions.
(d) Prior to final acceptance of the project, all drop inlets and bridge joints within the project
limits shall be cleaned and all material within the drop inlets and bridge joints shall be
removed. All paved areas adjacent to curbs shall be swept and cleaned of all extraneous
material. Costs for this work will not be paid for directly, but will be considered incidental
to all Contract items.
(e) There are special events throughout the year that may require close communication and
coordination between the Contractor and the municipality to reduce conflicts. The
municipality will advise the Engineer and Contractor of the specifics of each event and the
Engineer will direct the Contractor as to what actions, if any, will be necessary on the
Contractor's part to minimize impacts to the event. Special events that may conflict with
Contractor operations are not limited to those which may be listed in this Notice to Bidders.
There will be no extra compensation paid to the Contractor for any inconvenience caused
by working around any listed or unlisted special events.
For more information about area special events, contact the following:
Bradford: Administrator
Town of Bradford
172 North Main Street
administrator@bradfordvt.gov
802-222-4727
Norwich-Bradford IM 091-2(99) Advertised October 21, 2026
Special Provisions Part I - Notices to Bidders Page 8
Fairlee: Gene Craft
Town Administrator
Town of Fairlee
75 Town Common Road
townadministrator@fairleevt.gov
802-649-1419
Norwich: Brennan Duffy
Town Manager
Town of Norwich
300 Main Street
bduffy@norwich.vt.us
802-649-1419
Thetford: Brian Story
Town Manager
Town of Thetford
3910 Route 113
townmanager@thetfordvt.gov
802-649-1419
18. NOTICE TO BIDDERS - AFAD. The Contractor is hereby notified that Automated Flagger
Assistance Devices (AFADs) are remotely operated devices that enable a certified flagger to be
positioned out of the lane of traffic and are used to control motorists through work zones.
AFADs shall only be used in situations where there is no more than one lane of approaching traffic
that needs to be controlled. Additionally, since AFADs are not traffic control signals, they shall
not be used to replace traffic signals or other continuously operating traffic control devices.
These devices may be used as a safety enhancement to flaggers on an hour-for-hour basis. AFADs
shall meet the following requirements:
(a) All AFAD applications shall meet the requirements of the applicable sections of the current
edition of the Manual on Uniform Traffic Control Devices (MUTCD).
(b) All AFAD applications shall be in accordance with NCHRP Report 350 or the MASH for
the applicable test level and device weight. Documentation of the crashworthiness of the
device shall be submitted to the Engineer for approval prior to use on the project.
(c) AFAD applications shall always be controlled by a flagger who has been trained in the
operation of the AFAD and who meets the requirements of Section 630. The flagger shall
not flag traffic and operate an AFAD at the same time.

With GovernmentContracts, you can:
Burlington-Winooski BF RAIZ (2) & Burlington STP 5000(29) Request for Proposal Request Date:
State Government of Vermont
Bid Due: 4/02/2027
Statewide DBOOM EVSE RFP Request Date: 9/17/2026 3:12:33 PM Open Date: 9/15/2026 Closing
State Government of Vermont
Bid Due: 11/17/2026
Facilities Job Order Contract FC0003 ON RAMP Request Date: 10/21/2026 2:34:34 PM Open
State Government of Vermont
Bid Due: 11/20/2026
Gym Flooring and Upgrades Request Date: 10/22/2026 2:11:37 PM Open Date: 10/22/2026 Closing
State Government of Vermont
Bid Due: 11/30/2026