Kennedy Bridge Drainage Improvements (PE24271)

Location: Georgia
Posted: May 13, 2025
Due: Jun 11, 2025
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: PE-77068-NONST-2025-000000007
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-77068-NONST-2025-000000007 Kennedy Bridge Drainage Improvements (PE24271) Evans County Board Of Commissioners
May 13, 2025 @ 03:29 PM
Jun 11, 2025 @ 02:00 PM
Kennedy Bridge Drainage Improvements (PE24271)

Start Date: May 13, 2025 @ 03:29 PM ET

End Date:
Jun 11, 2025 @ 02:00 PM ET

Event ID: PE-77068-NONST-2025-000000007
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: county
Fiscal Year: 2025


Description


Sealed bids for construction of Kennedy Bridge Drainage Improvements will be received until June 11th, 2025 at 2:00 PM at the Evans County Commissioners Office at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: This project involves the construction of upstream and downstream concrete aprons, including securely tying into the existing wingwalls. It also includes structural repairs to the northwest corner where the culvert meets the wingwall. Additional work includes the removal and regrading of existing material behind the upstream wingwalls, installation of rip-rap on both sides of the culvert for erosion control, and the full-depth, full-width removal and replacement of the southbound lane and shoulder of Kennedy Bridge Road. This includes excavation to a depth of 3 feet in two designated areas behind the headwall & wingwalls. Time allotted for final completion of work is 90 calendar days. Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, Email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable). The Scope of Work as described herein is defined as ¿utility contracting¿ in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a ¿Utility Contractor¿ and must also employ a ¿Utility Manager¿ certification holder who will have oversight of all the work. Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid.

NIGP Codes
Code Description
91361 Construction, Vertical, Concrete, Pour-In-Place, Form, Place, Finish
BuyerContact:

Lindsey Bashlor
lindsey@parker-engineering.com

9127647722

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...; and installing concrete patch material. Bridge painting (clean and repaint beams). Add ...

State Government of Georgia

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.