| Location: | Georgia |
|---|---|
| Posted: | May 13, 2025 |
| Due: | Jun 12, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-63850-NONST-2025-000000016 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-63850-NONST-2025-000000016 | Newnan Crossing Blvd E & Stillwood Dr Roundabout | Newnan, City Of |
May 13, 2025 @ 09:53 AM
|
Jun 12, 2025 @ 02:00 PM
|
Start Date: May 13, 2025 @ 09:53 AM ET
End Date:
Jun 12, 2025 @ 02:00 PM ET
This project Consists of constructing a single lane roundabout at the intersection of Newnan Crossing Blvd E and Stillwood Dr within the City Limits of Newnan, Georgia. Currently, vehicular traffic is controlled via stop signs. In addition to constructing the roundabout, modifications to the existing storm drainage system and adjacent sidewalks will be required. The project also involves relocation of water and sanitary sewer service lines as well as relocation of public utilities such as power, gas and phone.
| Code | Description |
| 91327 | Construction, Highway and Road |
| 91395 | Paving and Resurfacing, Highway and Road |
| 91350 | Construction, Streets, Major and Residential, Including Reconstruction |
Michael Klahr
mklahr@cityofnewnan.org
678-673-5560

With GovernmentContracts, you can:
...Construction, Utility and Underground Projects 91187 Storm Drainage 92688 Storm Water Discharge Testing... ...
State Government of Georgia
Bid Due: 7/02/2026
...Industrial Complex in Sylvester, Georgia. Work includes grading, base and asphalt paving, storm ...
State Government of Georgia
Bid Due: 7/14/2026
...the installation of approximately +- 4,359 LF of 6? PVC C900 water main, ...
State Government of Georgia
Bid Due: 6/23/2026
...Equipment 89064 Sewer Inspection Equipment 91187 Storm Drainage 91223 Construction, General: Backfill... Signs, ...
State Government of Georgia
Bid Due: 6/26/2026