| Location: | Massachusetts |
|---|---|
| Posted: | Mar 12, 2026 |
| Due: | Apr 9, 2026 |
| Agency: | Town of Barnstable |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY26-IFB-063 |
| Publication URL: | To access bid details, please log in. |
Project Description: Furnishing all labor, materials, and equipment necessary for construction of a new playground located in Osterville, MA including : Temporary sedimentation control, removal of existing trees, fencing, signage, concrete piers, septic tanks, manholes, storm water structures, bituminous and concrete pavement, vegetation, site utility relocation, protection of existing trees and features to remain, installation of playground equipment provided by Owner, installation of new sidewalk, fencing, playground surfacing, sidewalks, trash compactor, bituminous pavement and markings, water bottle filler and loam and seeding.

With GovernmentContracts, you can:
...to procure FRP seawater intakes, intake hoses, clam raceways, upweller tanks and silos, ...
Commonwealth of Massachusetts
Bid Due: 6/11/2026
...of the Liquid Oxygen Tank. The estimated time frame for project completion is ...
Commonwealth of Massachusetts
Bid Due: 7/24/2026
...work shall include correction of NFPA deficiencies of the existing Bulk O2 storage ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/17/2026
...invites bids for furnishing five (5) Tank Switches - 15kV, 3-phase, 200A, 2-way ...
Commonwealth of Massachusetts
Bid Due: 6/09/2026