| Location: | Utah |
|---|---|
| Posted: | Jul 15, 2026 |
| Due: | Sep 1, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-07 |
| Publication URL: | To access bid details, please log in. |
Project Description: The scope of this project is to provide all the labor, materials, tools and equipment necessary to construct the Pack Creek Pedestrian Bridge Replacement and Channel Restoration Project, complete as described in the plans and specifications. The project generally includes the following: to remove sediment and debris in the vicinity of this pedestrian bridge, excavate sediment deposits within the main and tributary channels and in the overbank areas to protect the pedestrian bridge and existing trail from erosion hazards, install a concrete apron on the channel bottom and banks to protect the bridge abutments of the proposed bridge from erosion hazards, install riprap on the downstream side of the three existing culverts, and provide erosion protection along the Pack Creek channel in the area

With GovernmentContracts, you can:
..., closeout, and incidental work necessary to construct three natural-surface singletrack trail segments...
State Government of Utah
Bid Due: 9/29/2026
...and ensuring that PCJ and its contractors design and construct the Project on ...
State Government of Utah
Bid Due: 10/09/2026
...and ensuring that PCJ and its contractors design and construct the Project on ...
State Government of Utah
Bid Due: 10/05/2026
...as Reconstruction (4R) with one segment of restoration (3R), and will design and ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 9/23/2026